2,726 |
Edit |
08/16/2023 |
Jesse Straeter |
Curt Dambman |
04/08/2023 |
Bev Derrer |
Bev Derrer |
|
|
|
|
|
|
204 W Dame Ave |
|
Lanark |
IL |
61046 |
Carroll |
|
|
N |
|
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
15 |
1 |
|
1 |
|
|
|
|
2 |
30 |
10 |
246 |
|
|
|
|
|
|
|
Cold |
N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
Y |
Hasn’t signed any paperwork |
|
04/10/2023 01:52 AM |
2,727 |
Edit |
03/25/2024 |
Jesse Straeter |
Curt Dambman |
04/08/2023 |
Jim Collins |
Jim Collins |
|
|
|
|
|
|
7288 S. Lowell Park Rd. |
|
Dixon |
IL |
61021 |
Ogle |
815-228-4876 |
|
N |
08/28/2023 |
01/18/2024 |
Heliene |
144HC-M6-450 BIFACIAL MAX SERIES |
AP Systems |
DS3 & DS3-L |
24 |
|
|
|
|
2 |
|
|
2 |
48 |
16 |
223 |
24.90 |
12.71 |
ComEd |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
Customer returned signed documents with address revision (install list already updated) reached out to IL Program Admin about updating SDF and if a new form is needed.
9/20 Interconnection submitted. Building permit ready to submit need one-line diagram. ET
10/10 need to have a final inspection done by Ogle County once all construction is complete |
|
04/10/2023 01:52 AM |
2,728 |
Edit |
12/12/2023 |
Jesse Straeter |
Curt Dambman |
04/08/2023 |
Ray Vos - Grain |
Ray Vos - Grain |
18917 Clark Road |
|
Chadwick |
IL |
61,014 |
Whiteside |
18917 Clark Road |
|
Chadwick |
IL |
61014 |
Whiteside |
815-631-1110 |
|
Y |
12/12/2022 |
01/02/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
15 |
1 |
|
1 |
|
|
|
|
2 |
30 |
10 |
254 |
22,900.00 |
|
Jo-Carroll Energy |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
N |
Y |
Y |
N |
Y |
Y |
|
House permits and interconnection approved, waiting on Grain applications to move forward with installation. |
04/10/2023 01:52 AM |
2,729 |
Edit |
06/29/2023 |
Jesse Straeter |
Curt Dambman |
04/08/2023 |
Vernon Kness |
Vernon Kness |
32 Washington Street |
|
Milledgeville |
IL |
61,051 |
Carroll |
32 Washington St |
|
Milledgeville |
IL |
61051 |
Carroll |
815-499-8581 |
|
N |
03/02/2023 |
06/15/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
6 |
1 |
|
|
|
|
|
|
1 |
12 |
4 |
239 |
5.28 |
|
ComEd |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
|
ComEd interconnection application completed online through contractor portal. Approved. |
04/10/2023 01:52 AM |
2,730 |
Edit |
02/07/2024 |
Jesse Straeter |
Doug Smith |
04/08/2023 |
Von Meeks |
Von Meeks |
11742 Bob White Lane |
|
Robinson |
IL |
62,454 |
Crawford |
12406 E 475th Ave |
|
Robinson |
IL |
62454 |
Crawford |
618-553-1568 |
|
N |
04/14/2023 |
08/03/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 & DS3-L |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
221 |
|
|
Norris Electric Cooperative |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
Customer signed solar contracts. Customer does not want solar system put in until the beginning of 2024. ET
CW-crawford co no building permit needed
12/14 – Interconnection submitted. |
Customer wishes to install system in first quarter of 2024. 4/19 – requesting Doug enter battery information. |
04/10/2023 01:52 AM |
2,731 |
Edit |
08/21/2023 |
Jesse Straeter |
Gary Rosen |
04/08/2023 |
Dave Senci |
Dave Senci |
627 E US Highway 40 |
|
Troy |
IL |
62,294 |
Madison |
627 E US Highway 40 |
|
Troy |
IL |
62294 |
Madison |
618-604-7508 |
|
N |
04/05/2023 |
07/12/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
27 |
|
|
3 |
|
|
|
|
3 |
54 |
18 |
321 |
23.76 |
|
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
New Construction site.
6/1 Ameren requiring transformer upgrade. ET
CW-requires an electrical inspection and final contact info is on spreadsheet and on paper saved in the folder |
5/18 Ameren app waiting on payment. LL |
04/10/2023 01:52 AM |
2,732 |
Edit |
10/10/2024 |
Jesse Straeter |
Jim Straeter |
04/08/2023 |
Archie Wells |
Archie Wells |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
N |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
0 |
0 |
0 |
|
|
|
|
|
|
|
|
Cold |
N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
|
|
04/10/2023 01:52 AM |
2,733 |
Edit |
07/26/2023 |
Jesse Straeter |
Justin Detmer |
04/08/2023 |
Seth Adams |
Seth Adams |
7 Wood Dr |
|
Shattuc |
IL |
62,231 |
|
7 Wood Dr |
|
Shattuc |
IL |
62231 |
Clinton |
618-367-2041 |
|
N |
03/18/2023 |
06/20/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
9 |
|
|
1 |
|
|
|
|
1 |
18 |
6 |
296 |
7.92 |
|
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
|
Ameren application listed under Andrew (Seth) Adams. Construction deadline 10/11/2023. LL |
04/10/2023 01:52 AM |
2,734 |
Edit |
05/25/2023 |
Jesse Straeter |
Justin Detmer |
04/08/2023 |
Ralph Goebel |
Ralph Goebel |
7615 Cemetry Rd |
|
St. Rose |
IL |
62,230 |
Clinton |
7615 Cemetery Road |
|
St. Rose |
IL |
62230 |
Clinton |
618-772-2604 |
618-210-8452 |
N |
03/16/2023 |
05/30/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
18 |
|
|
2 |
|
|
|
|
2 |
36 |
12 |
309 |
15.84 |
19.08 |
Clinton Co Electric Coop |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
CW – permit submitted 5/3 |
|
04/10/2023 01:52 AM |
2,735 |
Edit |
07/17/2023 |
Jesse Straeter |
Mark Luedke |
04/08/2023 |
Brent Plotner |
Brent Plotner |
731 County Rd 1500 E |
|
Tolono |
IL |
61,880 |
Champaign |
731 County Road 1500 East |
|
Tolono |
IL |
61880 |
Champaign |
217-377-7042 |
|
N |
11/28/2022 |
02/22/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
18 |
|
|
2 |
|
|
|
|
2 |
36 |
12 |
159 |
15.84 |
19.08 |
Ameren |
|
|
|
|
Finalize |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
N |
Y |
5/31 Original solar contract and SDF were signed with incorrect AC size. A new disclosure form has been entered into IL Shines and they are linking it to the current Part I. For more details see Laura or Erica for email. ET |
|
04/10/2023 01:52 AM |
2,736 |
Edit |
12/15/2023 |
Jesse Straeter |
Mark Luedke |
04/08/2023 |
Donald Meeker |
Donald Meeker |
14268 E 2550 North Rd |
|
Danville |
IL |
61,834 |
Vermilion |
14268 E 2550 North Rd |
|
Danville |
IL |
61834 |
Vermilion |
217-497-0147 |
|
N |
|
02/06/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
9 |
|
|
1 |
|
0 |
|
|
1 |
18 |
6 |
118 |
7.92 |
9.54 |
Eastern Illini Electric Cooperative |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
8/30 – system downsize (7.92kW) due to decreased electrical usage. New contracts and applications going out to reflect this. LL
Note: customer has some health issues and not the most responsive. Follow up with salesman when you need something. Customer signed Standard Disclosure Form almost 3 months after it was sent for signature so the estimated installation date listed on the SDF is no longer valid and has been moved up to 6/30/2023. LL
5/22 Sent interconnection paperwork to customer for signature. Need COI. ET (10kW)
5/24 Received signed interconnection paperwork from customer. Still waiting on COI. ET (10kW)
No permit needed (Vermillion) |
5/22 Sent interconnection paperwork to customer for signature. Need COI. ET (10kW) – Revision for system downsize will be submitted shortly 8/30 LL |
04/10/2023 01:52 AM |
2,737 |
Edit |
12/15/2023 |
Jesse Straeter |
Mark Luedke |
04/08/2023 |
Graymont Coop |
Graymont Coop - bin 31 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Y |
|
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
QT2 480 |
96 |
|
|
|
|
4 |
|
|
4 |
96 |
32 |
|
|
|
Ameren Illinois |
|
|
|
|
Finalize |
Y |
N |
N |
Y |
Y |
Y |
N |
Y |
N |
N |
Y |
9/1 Customer Construction deadline 10/28/23. Ameren sent reminder. ET |
|
04/10/2023 01:52 AM |
2,738 |
Edit |
12/04/2023 |
Jesse Straeter |
Mark Luedke |
04/08/2023 |
Graymont Coop |
Graymont Coop - Feed Mill |
403 North Main Street |
|
Graymont |
IL |
61,743 |
Livingston |
403 North Main Street |
|
Graymont |
IL |
61743 |
Livingston |
|
|
Y |
|
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
QT2 480 |
108 |
|
|
|
|
18 |
|
|
18 |
432 |
144 |
|
|
|
Ameren |
|
|
|
|
Draft |
N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
Y |
|
|
04/10/2023 01:52 AM |
2,739 |
Edit |
12/15/2023 |
Jesse Straeter |
Mark Luedke |
04/08/2023 |
Graymont Coop |
Graymont Coop - Main elevator |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Y |
|
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
QT2 480 |
156 |
|
|
|
|
26 |
|
|
26 |
624 |
208 |
|
|
|
Ameren Illinois |
|
|
|
|
Finalize |
Y |
N |
N |
Y |
Y |
Y |
N |
Y |
N |
N |
Y |
|
|
04/10/2023 01:52 AM |
2,740 |
Edit |
12/15/2023 |
Jesse Straeter |
Mark Luedke |
04/08/2023 |
Graymont Coop |
Graymont Coop - Rooks Creek site |
|
|
|
|
|
|
17525 N 1200 E Rd |
|
Amity TWP |
IL |
61319 |
|
815-743-5321 |
|
Y |
|
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
QT2 480 |
30 |
|
|
|
|
5 |
|
|
5 |
120 |
40 |
|
|
|
ComEd |
|
|
|
|
Finalize |
Y |
N |
N |
N |
Y |
Y |
N |
Y |
N |
N |
Y |
Customer is waiting on a grant application. ET |
|
04/10/2023 01:52 AM |
2,741 |
Edit |
06/19/2023 |
Jesse Straeter |
Mark Luedke |
04/08/2023 |
Barbara and Bill Maske |
Barbara and Bill Maske |
1918 169th St |
|
Mount Pulaski |
IL |
62,548 |
Logan |
1918 169th Street |
|
Mt. Pulaski |
IL |
62548 |
Logan |
217-791-3432 |
|
N |
11/18/2023 |
04/24/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 & DS3-L |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
214 |
10.00 |
12.72 |
Ameren |
|
|
|
|
Finalize |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
|
|
04/10/2023 01:52 AM |
2,742 |
Edit |
06/19/2023 |
Jesse Straeter |
Mark Luedke |
04/08/2023 |
Ted Meharry |
Ted Meharry |
208 East River Road |
|
Tolono |
IL |
61,880 |
Champaign |
208 E River Rd |
|
Tolono |
IL |
61880 |
Champaign |
217-369-4810 |
|
N |
|
04/25/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
21 |
|
|
1 |
|
1 |
|
|
2 |
42 |
14 |
163 |
18.48 |
22.26 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
Y |
|
|
04/10/2023 01:52 AM |
2,743 |
Edit |
06/20/2023 |
Jesse Straeter |
Mark Luedke |
04/08/2023 |
Dee Robinson |
Dee Robinson |
656 County Farm Rd |
|
Monticello |
IL |
61,856 |
Piatt |
656 County Farm Rd |
|
Monticello |
IL |
61856 |
Piatt |
217-520-6871 |
|
N |
12/10/2023 |
04/27/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
21 |
|
|
1 |
|
1 |
|
|
2 |
42 |
14 |
178 |
10.00 |
12.72 |
Ameren |
|
|
|
|
Finalize |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
|
|
04/10/2023 01:52 AM |
2,744 |
Edit |
07/14/2023 |
Jesse Straeter |
Mark Luedke |
04/08/2023 |
Jeffery Ford |
Jeffery Ford |
707 South Chicago Street |
|
Sidell |
IL |
61,876 |
Vermilion |
707 South Chicago Street |
|
Sidell |
IL |
61876 |
Vermilion |
217-474-1380 |
|
N |
11/17/2022 |
04/26/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
21 |
|
|
1 |
|
1 |
|
|
2 |
42 |
14 |
140 |
18.48 |
22.26 |
Ameren Illinois |
|
|
|
|
Finalize |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
|
|
04/10/2023 01:52 AM |
2,745 |
Edit |
06/29/2023 |
Jesse Straeter |
Mark Luedke |
04/08/2023 |
Chick Donnelly |
Chick Donnelly |
7645 Sherman Road |
|
Riverton |
IL |
62,561 |
Sangamon |
7645 Sherman Road |
|
Riverton |
IL |
62561 |
Sangamon |
217-652-8238 |
|
N |
11/17/2022 |
04/27/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
21 |
|
|
1 |
|
1 |
|
|
2 |
42 |
14 |
232 |
18.48 |
22.26 |
Ameren Illinois |
|
|
|
|
Finalize |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
|
|
04/10/2023 01:52 AM |
2,746 |
Edit |
10/10/2024 |
Jesse Straeter |
Mark Luedke |
04/08/2023 |
Jeff Haudrich |
Jeff Haudrich |
|
|
|
|
|
|
4082 Haudrich Road |
|
Waterloo |
IL |
62298 |
Monroe |
|
|
N |
02/01/2023 |
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 & DS3-L |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
353 |
|
|
|
|
|
|
|
Cold |
N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
|
|
04/10/2023 01:52 AM |
2,747 |
Edit |
08/21/2023 |
Jesse Straeter |
Mark Luedke |
04/08/2023 |
Ronald Day |
Ronald M Day |
218 N 500 E Rd |
|
Hammond |
IL |
61,929 |
|
218 N 500 E Rd |
|
Hammond |
IL |
61929 |
Piatt |
217-454-2119 |
|
N |
02/16/2023 |
06/01/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
9 |
|
|
1 |
|
|
|
|
1 |
18 |
6 |
193 |
7.92 |
9.54 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
N |
Y |
N |
N |
Y |
|
Ameren construction deadline 10/9/2023. LL |
04/10/2023 01:52 AM |
2,748 |
Edit |
06/20/2023 |
Jesse Straeter |
Mark Luedke |
04/08/2023 |
Steve and Joy Fox |
Steve and Joy Fox |
14959 S Markley Rd |
|
Danville |
IL |
61,834 |
|
14959 S Markley Road |
|
Danville |
IL |
61834 |
Vermilion |
217-304-4158 |
|
N |
02/24/2023 |
06/01/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
21 |
|
|
1 |
|
1 |
|
|
2 |
42 |
14 |
118 |
|
|
Ameren |
|
|
|
|
Finalize |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
|
|
04/10/2023 01:52 AM |
2,749 |
Edit |
12/04/2023 |
Jesse Straeter |
Mark Luedke |
04/08/2023 |
Hendricks Contracting |
Hendricks Contracting, Randy Hendricks |
160 E 200 N Road |
|
Loda |
IL |
60,948 |
|
160 E 200 N Rd |
|
Loda |
IL |
60948 |
Iriquois |
217-304-1545 |
|
Y |
|
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
|
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
124 |
|
|
Ameren |
|
|
|
|
Finalize |
Y |
N |
N |
Y |
Y |
Y |
N |
Y |
N |
N |
Y |
Pending grant approval. ET
9/10 Construction Deadline 10/10/23. Mark and Mike suggested 30-day extension. ET
9/13 Extension granted. ET
10/3 need utility bill sent email.
10/4 interconnection started- need 1-line |
|
04/10/2023 01:52 AM |
2,750 |
Edit |
06/29/2023 |
Jesse Straeter |
Mark Luedke |
04/08/2023 |
Michael Beaird |
Michael Beaird |
804 S Lincoln St |
|
Philo |
IL |
61,864 |
Champaign |
804 S Lincoln St |
|
Philo |
IL |
61684 |
Champaign |
217-369-9425 |
|
N |
02/22/2023 |
06/05/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 & DS3-L |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
159 |
10.00 |
12.72 |
Ameren |
|
|
|
|
Finalize |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
|
Ameren construction deadline 10/8/2023. LL |
04/10/2023 01:52 AM |
2,751 |
Edit |
10/12/2023 |
Jesse Straeter |
Mark Luedke |
04/08/2023 |
Chris Sturdyvin |
Chris Sturdyvin |
2717 County Road 1250 N |
|
Homer |
IL |
61,849 |
Champaign |
2717 County Road 1250 N |
|
Homer |
IL |
61849 |
Champaign |
217-369-8885 |
|
N |
03/14/2023 |
06/16/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 & DS3-L |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
142 |
10.00 |
|
Ameren Illinois |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
Customer has signed solar contracts.
CW- Stephanie said no need to combine property, but part of it is in the floodplain, so once they get the permit app she will review the location. May need to pay addtl 200 fee for floodplain area 7/7 need to know all outbuidlings, if any and pergola info. Sent email to Mark about this 7/14; sent f/u to mark 7/26
Erica following up with Mark on county setbacks. 8/3 LL
9/7 Had to resubmit site plan to show array would be out of floodplain. ET
9/18 Ameren construction deadline 10/16/23. ET |
One 24-panel array with 7DS3 micorinverters and 5DS3L microinverters making system total AC size 10kW. Array to be installed on parcel adjacent to home parcel. Will serve residence. |
04/10/2023 01:52 AM |
2,752 |
Edit |
07/28/2023 |
Jesse Straeter |
Mark Luedke |
04/08/2023 |
Alva Miller |
Alva Miller |
364 N County Road 475 E |
|
Arthur |
IL |
61,911 |
|
364 N Co Rd 475 E |
|
Arthur |
IL |
61911 |
Moultrie |
217-246-2566 |
|
N |
03/16/2023 |
06/18/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
21 |
|
|
1 |
|
1 |
|
|
2 |
42 |
14 |
191 |
18.48 |
|
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
|
Ameren construction deadline 10/15/2023. LL |
04/10/2023 01:52 AM |
2,753 |
Edit |
09/01/2023 |
Jesse Straeter |
Mark Luedke |
04/08/2023 |
Michael Langendorf |
Michael Langendorf |
2401 CR 2200 N |
|
Saint Joseph |
IL |
61,873 |
Champaign |
2401 County Rd 2200 N |
|
St. Joseph |
IL |
61873 |
Champaign |
217-621-1817 |
|
N |
03/24/2023 |
07/02/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
(7)DS3 & (5)DS3-L |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
146 |
10.00 |
12.72 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
|
Ameren Construction Deadline 10/10/2023. LL |
04/10/2023 01:52 AM |
2,754 |
Edit |
06/06/2024 |
Jesse Straeter |
Mark Luedke |
04/08/2023 |
Chuck Routh |
Chuck Routh |
1592 County Rd 1100 N |
|
Urbana |
IL |
61,802 |
Champaign |
1592 County Rd 1100 N |
|
Urbana |
IL |
61802 |
Champaign |
217-840-2980 |
|
N |
04/05/2023 |
07/04/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
9 |
|
|
1 |
|
|
|
|
1 |
18 |
6 |
154 |
7.92 |
9.54 |
Eastern Illini Coop |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
5/25 sent email to EIEC for update on interconnection application. Response back that interconnection is approved, email saved in documents. ET |
Customer is in Net Metering Program based on previous application, prior to Net Metering closing. This may need to be communicated to the IL Shines Program Administrator. LL |
04/10/2023 01:52 AM |
2,755 |
Edit |
08/25/2023 |
Jesse Straeter |
Mark Luedke |
04/08/2023 |
John Clamors |
John Clamors |
5267 St Rt 156 |
|
Waterloo |
IL |
62,298 |
Monroe |
5267 St Rt 156 |
|
Waterloo |
IL |
62298 |
Monroe |
618-719-5114 |
|
N |
03/27/2023 |
07/03/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 & DS3-L |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
358 |
10.00 |
|
Monroe Co Electric Co-Op |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
|
|
04/10/2023 01:52 AM |
2,756 |
Edit |
08/22/2023 |
Jesse Straeter |
Mark Luedke |
04/08/2023 |
Troy Winland |
Troy Winland |
18580 East 500 N Road |
|
Georgetown |
IL |
61,846 |
Vermilion |
18580 E 500 N Rd |
|
Georgetown |
IL |
61846 |
Vermilion |
217-799-7804 |
|
N |
03/31/2023 |
07/06/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 & DS3-L |
30 |
|
|
2 |
|
1 |
|
|
3 |
60 |
20 |
128 |
|
|
Ameren Illinois |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
Customer has signed contracts.
5/26 Ameren interconnection submitted (DER-21346). ET
6/16 Ameren approved interconnection. ET |
System to be installed on parcel directly adjacent to home parcel (to the west). Solar will still serve the home. |
04/10/2023 01:52 AM |
2,757 |
Edit |
08/07/2023 |
Jesse Straeter |
Mark Luedke |
04/08/2023 |
Derrick Herschberger |
Derrick Herschberger |
|
|
|
|
|
|
545 E Co Rd 650 N |
|
Tuscola |
IL |
61953 |
Douglas |
217-202-9009 |
|
N |
04/01/2023 |
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
24 |
|
|
|
|
2 |
|
|
2 |
48 |
16 |
189 |
|
|
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
N |
Y |
N |
N |
Y |
6/21 Ameren interconnection submitted (DER-22443). ET
6/29 Ameren approved to proceed with construction. ET |
|
04/10/2023 01:52 AM |
2,758 |
Edit |
07/05/2023 |
Jesse Straeter |
Mark Luedke |
04/08/2023 |
Michael Spracklen |
Michael Spracklen |
1777 E 793 N Rd |
|
Shelbyville |
IL |
62,565 |
Shelby |
1777 E 793 N Rd |
|
Shelbyville |
IL |
62565 |
Shelby |
217-620-7728 |
|
N |
04/10/2023 |
07/10/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
|
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
262 |
10.00 |
|
Shelby Electric Co-Op |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
CW- Have been without a building/zoning officer. I called 4/17 for update, no one has returned my call yet. 4/19
Customer to determine building permit application process if not AHJ. LL
Utility approved. For permit, they have not had a zoning office since at least 4/1 – spoke to Spracklen also went to Co to check and no zoning officer. Per Jim, customer needs to take care of contacting Bldg, dept. sent f/u email to cust for status 5/5 Sent email to Mark re f/u w/cust 5/26 Mark said to move forward with this system |
5/9 Shelby Electric Co-Op approved interconnection. ET |
04/10/2023 01:52 AM |
2,759 |
Edit |
06/20/2023 |
Jesse Straeter |
Mark Luedke |
04/08/2023 |
David Silver |
David Silver |
1306 S 2nd Ave |
|
Hoopeston |
IL |
60,942 |
|
1306 S 2nd Ave |
|
Hoopeston |
IL |
60942 |
Vermilion |
217-304-7753 |
|
N |
04/03/2023 |
07/12/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 & DS3-L |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
106 |
10.00 |
|
Ameren |
|
|
|
|
Finalize |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
N |
Y |
|
|
04/10/2023 01:52 AM |
2,760 |
Edit |
09/01/2023 |
Jesse Straeter |
Mark Luedke |
04/08/2023 |
Lucas Osborne |
Lucas Osborne |
173 County Rd 1100 E |
|
Pesotum |
IL |
61,863 |
Champaign |
173 County Rd 1100 E |
|
Pesotum |
IL |
61863 |
Champaign |
217-841-7657 |
|
N |
04/04/2023 |
08/01/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 & DS3-L |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
169 |
|
|
Ameren Illinois |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
5/26 Ameren interconnection submitted (DER-21343). ET
6/14 Submitted revised one- line to Ameren. ET
6/28 Ameren approved to proceed with construction. ET |
Acct# 5825030731 |
04/10/2023 01:52 AM |
2,761 |
Edit |
10/24/2023 |
Jesse Straeter |
Mark Luedke |
04/08/2023 |
Bruce Darr |
Bruce Darr |
8695 East 980 North Rd |
|
Fairmount |
IL |
61,841 |
Vermilion |
8695 E 980 N Rd |
|
Fairmount |
IL |
61841 |
Vermilion |
217-497-2760 |
|
N |
06/29/2023 |
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 & DS3-L |
60 |
|
|
2 |
|
1 |
|
|
3 |
60 |
20 |
131 |
24.83 |
31.80 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
6/26 Submitted SDF, SCA and BOS for customer signature. ET
7/26 Ameren interconnection submitted (DER-24111). ET |
|
04/10/2023 01:52 AM |
2,762 |
Edit |
08/07/2023 |
Jesse Straeter |
Mark Luedke |
04/08/2023 |
Kyle Schultz |
Kyle Schultz |
1589 N Greenway Rd |
|
Cerro Gordo |
IL |
61,818 |
Macon |
1589 N Greenway Rd |
|
Cerro Gordo |
IL |
61818 |
Macon |
217-433-3175 |
|
N |
04/05/2023 |
08/02/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 & DS3-L |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
197 |
10.00 |
|
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
No permit needed |
Ameren construction deadline 10/29/2023. LL |
04/10/2023 01:52 AM |
2,763 |
Edit |
11/10/2023 |
Jesse Straeter |
Mark Luedke |
04/08/2023 |
Jim Wallace |
Jim Wallace |
1215 CR 900 E |
|
Trilla |
IL |
62,469 |
|
1215 County Rd 900 E |
|
Trilla |
IL |
62469 |
Coles |
217-254-0905 |
|
N |
02/23/2023 |
06/07/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 & DS3-L |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
222 |
10.00 |
12.72 |
Coles-Moultrie Electric Coop |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
5/25 Sent an email to customer about still needing COI for interconnection. ET
CW – No permit (Vermillion) waiting for utility
6/26 Submitted Coles-Moultrie Electric interconnection. ET
8/9 sent email asking for an update on the interconnection. ET
10/11 interconnection approved |
Jim Wallace is head of Coles-Moultrie, however, we are to process utility application as usual. He will get paperwork added to the application once submitted. LL |
04/10/2023 01:52 AM |
2,764 |
Edit |
06/20/2023 |
Jesse Straeter |
Mark Luedke |
04/08/2023 |
Jeromy Spesard |
Jeromy Spesard |
14379 E 400 N |
|
Ridge Farm |
IL |
61,870 |
|
14379 E 400 N Rd |
|
Ridge Farm |
IL |
61870 |
Vermilion |
217-808-2235 |
|
N |
01/21/2023 |
05/17/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
18 |
|
|
2 |
|
|
|
|
2 |
36 |
12 |
132 |
15.84 |
|
Ameren |
|
|
|
|
Finalize |
Y |
Y |
Y |
Y |
Y |
Y |
N |
Y |
N |
N |
Y |
|
|
04/10/2023 01:52 AM |
2,765 |
Edit |
06/20/2023 |
Jesse Straeter |
Mark Luedke |
04/08/2023 |
Chris Cunningham |
Chris Cunningham |
|
|
|
|
|
|
7132 E 200 N Rd |
|
Sidell |
IL |
61876 |
Vermilion |
217-304-2811 |
|
N |
03/03/2023 |
05/21/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
18 |
|
|
2 |
|
|
|
|
2 |
36 |
12 |
139 |
15.84 |
19.08 |
EnerStar |
|
|
|
|
Finalize |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
|
Utility application still in review for large system size (large according to EnerStar), but approval was given to the customer prior to Ag Tech interconnection application. Utility verifying size. LL
EnerStar gave approval for interconnection. 5/18 |
04/10/2023 01:52 AM |
2,766 |
Edit |
08/18/2023 |
Jesse Straeter |
Mark Luedke |
04/08/2023 |
Abigail and Travis Rust |
Abigail and Travis Rust |
151 N State Rt 49 |
|
Cissna Park |
IL |
60,924 |
Iriquois |
151 N State Rt 49 |
|
Cissna Park |
IL |
60924 |
Iriquois |
217-377-5516 |
|
N |
05/10/2023 |
08/10/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
24 |
|
|
|
|
2 |
|
|
2 |
48 |
16 |
118 |
21.12 |
25.44 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
No permit required.
6/15 Ameren approved interconnection. ET
8/2 customer waiting to move forward until further notice (monetary related). LL |
5/15 Ameren interconnection application submitted (DER-20806). ET |
04/10/2023 01:52 AM |
2,767 |
Edit |
09/25/2023 |
Jesse Straeter |
Mark Luedke |
04/08/2023 |
Garth Osborne |
Garth Osborne |
50 County Road 1300 East |
|
Pesotum |
IL |
61,863 |
Champaign |
50 County Rd 1300 E |
|
Pesotum |
IL |
61863 |
Champaign |
217-530-1291 |
|
N |
04/09/2023 |
08/13/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
9 |
|
|
1 |
|
|
|
|
1 |
18 |
6 |
170 |
7.92 |
9.54 |
Eastern Illini Electric Coop |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
9/25 Authorization to energize from EIEC. ET |
5/5 EIEC has approved interconnection and ok to proceed with construction. ET |
04/10/2023 01:52 AM |
2,768 |
Edit |
10/12/2023 |
Jesse Straeter |
Mark Luedke |
04/08/2023 |
Joe Irle |
Joe Irle - Farm |
1373 County Road 2500 N |
|
Thomasboro |
IL |
61,878 |
Champaign |
1369 County Rd 2500 N |
|
Thomasboro |
IL |
61878 |
Champaign |
217-840-7904 |
|
N |
04/18/2023 |
08/14/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
9 |
|
|
1 |
|
|
|
|
1 |
18 |
6 |
154 |
7.92 |
8.54 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
This customer has another system located on the same parcel. ABP application is one for both systems.
9/13 Ameren construction deadline 11/11/23. ET |
5/15 Ameren interconnection approved to proceed with construction. ET
Ameren Acct# 4385398001
Ameren Meter# 72413474
DER-19837
Ameren construction deadline 11/11/2023 |
04/10/2023 01:52 AM |
2,769 |
Edit |
10/12/2023 |
Jesse Straeter |
Mark Luedke |
04/08/2023 |
Joe Irle |
Joe Irle - House |
1373 County Rd 2500 N |
|
Thomasboro |
IL |
61,878 |
Champaign |
1373 County Rd 2500 N |
|
Thomasboro |
IL |
61878 |
Champaign |
217-840-7904 |
|
N |
04/18/2023 |
08/21/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
9 |
|
|
1 |
|
|
|
|
1 |
18 |
6 |
154 |
7.92 |
8.54 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
This customer has another system located on the same parcel. ABP application combined into one for both systems.
9/13 Ameren construction deadline 11/11/23. ET |
5/15 Ameren interconnection approved to proceed with construction. ET
Ameren Acct#6917597295
Ameren meter# 72719765
DER-19836
Ameren construction deadline 11/11/2023 |
04/10/2023 01:52 AM |
2,770 |
Edit |
08/16/2023 |
Jesse Straeter |
Jim Straeter |
04/08/2023 |
Kokomo Grain |
Kokomo Grain - Meter # 012 |
|
|
|
|
|
|
1002 West Morgan St |
|
Kokomo |
IN |
46901 |
Howard |
|
|
N |
|
|
|
144HC-M6-450 BIFACIAL MAX SERIES |
AP Systems |
YC10003-3-NA 480 |
266 |
|
1 |
|
|
|
29 |
|
30 |
768 |
236 |
41 |
|
|
|
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
X |
Y |
Y |
Y |
Y |
N |
|
I put the Inverter model YC10003-3-NA 480 based on it saying YC1000 in spreadsheet – Jesse |
04/10/2023 01:52 AM |
2,771 |
Edit |
09/12/2023 |
Jesse Straeter |
Jim Straeter |
04/08/2023 |
Kokomo Grain Anderson |
Kokomo Grain - Meter # 168 |
|
|
|
|
|
|
3905 W. 600 N. |
|
Anderson |
IN |
46011 |
Madison |
765-860-5107 |
765-457-7211 |
N |
|
|
|
|
AP Systems |
YC10003-3-NA 480 |
495 |
|
|
|
|
|
55 |
|
55 |
1,430 |
440 |
89 |
|
|
|
|
|
|
|
Finalize |
Y |
N |
N |
Y |
Y |
X |
Y |
Y |
N |
N |
N |
|
I put the Inverter model YC10003-3-NA 480 based on it saying YC1000 in spreadsheet – Jesse |
04/10/2023 01:52 AM |
2,772 |
Edit |
08/16/2023 |
Jesse Straeter |
Jim Straeter |
04/08/2023 |
Kokomo Grain - Amboy Site |
Kokomo Grain - Meter # 172 |
|
|
|
|
|
|
DIR Pennsylvania ST. E |
|
Amboy |
IN |
46911 |
Miami |
|
|
N |
|
|
|
|
AP Systems |
YC10003-3-NA 480 |
32 |
|
1 |
|
|
|
3 |
|
4 |
92 |
28 |
40 |
|
|
|
|
|
|
|
Draft |
N |
N |
N |
Y |
Y |
X |
Y |
N |
N |
N |
N |
Customer has not confirmed moving forward with this location. 8/16 LL |
Needs Signed Interconnection from Bob Ortman. I put the Inverter model YC10003-3-NA 480 based on it saying YC1000 in spreadsheet - Jesse |
04/10/2023 01:52 AM |
2,773 |
Edit |
08/16/2023 |
Jesse Straeter |
Jim Straeter |
04/08/2023 |
Kokomo Grain |
Kokomo Grain - Meter # 258 |
|
|
|
|
|
|
1000 West Morgan St |
|
Kokomo |
IN |
46901 |
Howard |
|
|
N |
|
|
|
|
AP Systems |
YC10003-3-NA 480 |
27 |
|
|
|
|
|
3 |
|
3 |
78 |
24 |
41 |
|
|
|
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
X |
Y |
Y |
Y |
Y |
N |
|
I put the Inverter model YC10003-3-NA 480 based on it saying YC1000 in spreadsheet – Jesse |
04/10/2023 01:52 AM |
2,774 |
Edit |
09/12/2023 |
Jesse Straeter |
Jim Straeter |
04/08/2023 |
Kokomo Grain Anderson |
Kokomo Grain - Meter # 274 |
|
|
|
|
|
|
3905 W. 600 N. |
|
Anderson |
IN |
46011 |
Madison |
765-860-5107 |
765-457-7211 |
N |
|
|
|
|
AP Systems |
YC10003-3-NA 480 |
18 |
|
1 |
|
|
|
2 |
|
3 |
66 |
20 |
89 |
|
|
|
|
|
|
|
Finalize |
Y |
N |
N |
Y |
Y |
X |
Y |
Y |
N |
N |
N |
|
I put the Inverter model YC10003-3-NA 480 based on it saying YC1000 in spreadsheet – Jesse |
04/10/2023 01:52 AM |
2,775 |
Edit |
09/20/2023 |
Jesse Straeter |
Jim Straeter |
04/08/2023 |
Kokomo Grain Anderson |
Kokomo Grain - Meter # 287 |
|
|
|
|
|
|
3905 W. 600 N. |
|
Anderson |
IN |
46011 |
Madison |
765-860-5107 |
765-457-7211 |
N |
|
|
|
|
AP Systems |
YC10003-3-NA 480 |
169 |
|
1 |
|
|
|
18 |
|
19 |
482 |
148 |
89 |
|
|
|
|
|
|
|
Finalize |
Y |
N |
N |
Y |
Y |
X |
Y |
Y |
N |
N |
N |
|
I put the Inverter model YC10003-3-NA 480 based on it saying YC1000 in spreadsheet – Jesse |
04/10/2023 01:52 AM |
2,776 |
Edit |
08/16/2023 |
Jesse Straeter |
Jim Straeter |
04/08/2023 |
Kokomo Grain |
Kokomo Grain - Meter # 608 |
|
|
|
|
|
|
1002 West Morgan St |
|
Kokomo |
IN |
46901 |
Howard |
|
|
N |
|
|
|
|
AP Systems |
YC10003-3-NA 480 |
18 |
|
|
|
|
|
2 |
|
2 |
52 |
16 |
41 |
|
|
|
|
|
|
|
Draft |
N |
N |
N |
Y |
S |
X |
Y |
N |
N |
N |
N |
|
Needs transformer Upgrade. I put the Inverter model YC10003-3-NA 480 based on it saying YC1000 in spreadsheet - Jesse |
04/10/2023 01:52 AM |
2,777 |
Edit |
08/16/2023 |
Jesse Straeter |
Jim Straeter |
04/08/2023 |
Kokomo Grain |
Kokomo Grain - Meter # 950 |
|
|
|
|
|
|
11505 S 800 E |
|
Amboy |
IN |
46911 |
Miami |
|
|
N |
|
|
|
|
AP Systems |
YC10003-3-NA 480 |
495 |
|
|
|
|
|
55 |
|
55 |
1,430 |
440 |
42 |
|
|
|
|
|
|
|
Draft |
N |
N |
N |
Y |
S |
X |
Y |
N |
N |
N |
N |
|
Needs Letter from Bob Ortman. I put the Inverter model YC10003-3-NA 480 based on it saying YC1000 in spreadsheet - Jesse |
04/10/2023 01:52 AM |
2,778 |
Edit |
02/07/2024 |
Jesse Straeter |
Jim Straeter |
04/08/2023 |
Trane Manufacturing |
Trane Manufacturing |
|
|
|
|
|
|
1300 N. Benjamin St. |
|
Rushville |
IN |
46130 |
Rush |
|
|
N |
|
|
Q Cells |
Bifacial 590w |
AP Systems |
QT2 480 |
552 |
|
|
|
|
92 |
|
|
92 |
2,208 |
736 |
139 |
993.60 |
1,392.72 |
Duke |
|
|
|
|
Finalize |
Y |
N |
N |
Y |
Y |
X |
Y |
Y |
N |
N |
N |
Customer not moving forward at this point in time due to monetary reasons.
9/25 Moving forward now and have been in contact with Duke, as well as City of Rushville about permits. Duke has said the Interconnection Agreement from 5/12/22 is still good just need to send revised one-line diagram and site plan. City of Rushville and Shelly Wakefied are to get back with me on making sure that building permits/variances are still good. Have reached out to Shelly several times with no response back and have now let City of Rushville know to try and get a push for update. ET |
Variance Meeting 4/20/22 for Permit. Had QT2 480 on spreadsheet for inverters (qty 552). Not sure the part # for that, so I left blank – Jesse |
04/10/2023 01:52 AM |
2,779 |
Edit |
06/03/2023 |
Jesse Straeter |
Doug Smith |
04/08/2023 |
David George |
David George |
4588 State Rd 135 S |
|
Nashville |
IN |
47,448 |
Brown |
4588 State Rd. 135 S |
|
Nashville |
IN |
47448 |
Brown |
(317) 710-1169 |
|
N |
08/18/2022 |
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
157 |
10.56 |
12.72 |
Jackson Co. REMC |
|
|
|
|
Finalize |
Y |
Y |
Y |
Y |
Y |
X |
Y |
Y |
N |
N |
N |
Customer needed to install concrete pad to attach stands to as the piers could not penetrate the limestone that the solar site sits upon. |
|
04/10/2023 01:52 AM |
2,780 |
Edit |
05/25/2023 |
Jesse Straeter |
Doug Smith |
04/08/2023 |
Marlin Schmucker |
Marlin Schmucker |
|
|
|
|
|
|
13115 Irving Rd |
|
New Haven |
IN |
46774 |
Allen |
|
|
N |
05/18/2022 |
|
|
144HC-M6-450 BIFACIAL MAX SERIES |
Enphase |
IQ8H |
34 |
|
1 |
|
1 |
|
|
|
2 |
34 |
10 |
77 |
|
|
|
|
|
|
|
Draft |
N |
N |
N |
N |
Y |
X |
N |
N |
N |
N |
N |
CW-customer is on hold |
ON HOLD. |
04/10/2023 01:52 AM |
2,781 |
Edit |
06/03/2023 |
Jesse Straeter |
Doug Smith |
04/08/2023 |
Jason Tincher |
Jason Tincher |
6092 Railroad Rd. |
|
Morgantown |
IN |
46,160 |
|
6092 Railroad Rd. |
|
Morgantown |
IN |
46160 |
|
812-340-1930 |
|
N |
01/31/2023 |
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
9 |
|
|
1 |
|
|
|
|
1 |
18 |
6 |
147 |
7.92 |
9.54 |
Jackson Co. REMC |
|
|
|
|
Finalize |
Y |
Y |
Y |
Y |
Y |
X |
Y |
Y |
N |
N |
N |
CW – must contact [email protected] at the utility for the meter swap. 4/30 |
|
04/10/2023 01:53 AM |
2,782 |
Edit |
08/03/2023 |
Jesse Straeter |
Doug Smith |
04/08/2023 |
Ryan McBride |
Ryan McBride (2) 32 Panel 60 cell - 325 W with IQ7 |
62405 County Rd 7 |
|
Elkhart |
IN |
46,517 |
St Joseph |
62405 County Road 7 |
|
Elkhart |
IN |
46517 |
Elkhart |
574-862-1389 |
|
N |
02/16/2023 |
|
Q Cells |
325W Duo |
Enphase |
IQ7+ |
64 |
|
|
|
|
|
|
|
0 |
0 |
0 |
60 |
15.36 |
20.80 |
NIPSCO |
Option 1 |
Option 1 |
1 |
18 |
Finalize |
Y |
N |
Y |
Y |
Y |
X |
Y |
Y |
N |
N |
N |
Has Permit, electrician will need to pull a permit, waiting on utility 6/1
5/30 NIPSCO requested more info on battery system and panels. ET
6/5 NIPSCO requesting revised one line diagram. Informed Doug. ET
6/12 Updated interconnection application and resubmitted along with new one line diagram. ET
CW – NIPSCO said will need transformer upgrade and will submit paperwork to Doug 7/5 |
System consists of 2 32-panel arrays. |
04/10/2023 01:53 AM |
2,783 |
Edit |
08/01/2023 |
Jesse Straeter |
Doug Smith |
04/08/2023 |
Glen Bird and Linda Ligocki |
Glen Bird and Linda Ligocki |
2142 N 125 E |
|
Winamac |
IN |
46,966 |
Pulaski |
2142 N 125 E |
|
Winamac |
IN |
46966 |
Pulaski |
928-889-1190 |
|
N |
03/06/2023 |
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
9 |
|
|
1 |
|
|
|
|
1 |
18 |
6 |
23 |
7.92 |
9.54 |
Winamac Municipal |
|
|
|
|
Finalize |
Y |
Y |
Y |
Y |
Y |
X |
Y |
Y |
N |
N |
N |
CW – permit received. Waiting on utility 5/5.
Spoke with Brad of the Town of Winamac municipality. Interconnection has not yet been approved. He is awaiting the customer signed Interconnection Agreement and needs confirmation we have Agreement with IMPA on payback. According to AP Systems monitor the system is not reporting generation so it is assumed it is not electrically energized. LL 8/1 |
|
04/10/2023 01:53 AM |
2,784 |
Edit |
07/26/2023 |
Jesse Straeter |
Doug Smith |
04/08/2023 |
Robby Tummers |
Robby Tummers |
5526 S Huntsville Rd |
|
Modoc |
IN |
47,358 |
Randolph |
5526 S Huntsville Rd |
|
Modoc |
IN |
47358 |
Randolph |
(765) 546-0876 |
|
N |
03/10/2023 |
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
124 |
10.56 |
12.72 |
Whiteside REMC |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
X |
Y |
Y |
N |
N |
N |
5/26 Interconnecton documents sent to customer for signature. ET
6/12 Submitted interconnection app. ET |
|
04/10/2023 01:53 AM |
2,785 |
Edit |
06/30/2023 |
Jesse Straeter |
Homan Inc |
04/08/2023 |
Brian Homan |
Brian Homan farm - 6 Array Site |
6825 N 1025 W |
|
Pennville |
IN |
46,975 |
Jay |
6285 N 1025 W |
|
Pennville |
IN |
47369 |
Jay |
419-305-3265 |
|
N |
03/15/2023 |
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
144 |
|
|
|
|
6 |
|
|
6 |
144 |
48 |
83 |
63.40 |
76.32 |
Jay County REMC |
|
|
|
|
Finalize |
Y |
Y |
Y |
Y |
Y |
X |
Y |
Y |
N |
N |
N |
|
4/25 Jay County REMC is requiring additional paperwork to sell power to Wabash Valley Power Alliance. All that paperwork has been filled out, signed and sent to Jeff Myers at Jay County REMC for review. ET
5/25 Jay County REMC sent an email stating interconnection has been approved. Email saved in documents. ET |
04/10/2023 01:53 AM |
2,786 |
Edit |
06/30/2023 |
Jesse Straeter |
Homan Inc |
04/08/2023 |
Brian Homan |
Brian Homan farm - 3 array site |
6285 N 1025 W |
|
Pennville |
IN |
47,369 |
Jay |
4325 N 650 W |
|
Pennville |
IN |
47369 |
Jay |
419-305-3265 |
|
N |
03/15/2023 |
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
72 |
|
|
|
|
3 |
|
|
3 |
72 |
24 |
90 |
31.70 |
|
Jay County REMC |
|
|
|
|
Finalize |
Y |
Y |
Y |
Y |
Y |
X |
Y |
Y |
N |
N |
N |
|
4/25 Jay County REMC is requiring additional paperwork to sell power to Wabash Valley Power Alliance. All that paperwork has been filled out, signed and sent to Jeff Myers at Jay County REMC for review. ET
5/25 Jay County REMC sent email stating interconnection approved. Email saved in documents. ET |
04/10/2023 01:53 AM |
2,787 |
Edit |
07/11/2023 |
Jesse Straeter |
Jim Straeter |
04/08/2023 |
David Dzubay |
David Dzubay |
5415 East James Road |
|
Bloomington |
IN |
47,408 |
Monroe |
5415 East James Road |
|
Bloomington |
IN |
47408 |
Monroe |
812-320-1674 |
|
N |
03/02/2023 |
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
9 |
|
|
1 |
|
0 |
|
|
1 |
18 |
6 |
157 |
7.92 |
9.54 |
Duke Energy |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
X |
N |
Y |
N |
N |
N |
|
|
04/10/2023 01:53 AM |
2,788 |
Edit |
04/22/2023 |
Jesse Straeter |
Jim Straeter |
04/08/2023 |
Columbia Elementary School |
Columbia Elementary School |
|
|
|
|
|
|
1502 Elm St. |
|
Rochester |
IN |
46975 |
Fulton |
|
|
N |
|
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
QT2 480 |
144 |
|
|
|
|
24 |
|
|
24 |
576 |
192 |
2 |
|
|
|
|
|
|
|
Draft |
N |
N |
N |
N |
S |
X |
N |
N |
N |
N |
N |
|
|
04/10/2023 01:53 AM |
2,789 |
Edit |
04/22/2023 |
Jesse Straeter |
Jim Straeter |
04/08/2023 |
Fulton County Jail |
Fulton County Jail |
|
|
|
|
|
|
2006 Sweetgum Road |
|
Rochester |
IN |
46975 |
Fulton |
|
|
N |
|
|
Heliene |
144M-530-HC-M10-BF-SL |
|
|
|
|
|
|
|
|
|
|
0 |
0 |
0 |
2 |
|
|
|
|
|
|
|
Draft |
N |
N |
N |
S |
S |
X |
N |
N |
N |
N |
N |
|
|
04/10/2023 01:53 AM |
2,791 |
Edit |
05/25/2023 |
Jesse Straeter |
Jim Straeter |
04/08/2023 |
Paul Meyers |
Paul Meyers Goshen Rd |
|
|
|
|
|
|
8834 Goshen Rd |
|
Ft. Wayne |
IN |
46818 |
Allen |
|
|
N |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
0 |
0 |
0 |
61 |
|
|
|
|
|
|
|
Finalize |
N |
N |
N |
Y |
Y |
X |
Y |
Y |
N |
N |
N |
|
811 marked Y 7/21 on spreadsheet - Jesse |
04/10/2023 01:53 AM |
2,792 |
Edit |
04/22/2023 |
Jesse Straeter |
Jim Straeter |
04/08/2023 |
Riddle Elementary School |
Riddle Elementary School |
|
|
|
|
|
|
302 Rochester Ave |
|
Rochester |
IN |
46975 |
Fulton |
|
|
N |
|
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
QT2 480 |
144 |
|
|
|
|
24 |
|
|
24 |
576 |
192 |
4 |
|
|
|
|
|
|
|
Draft |
N |
N |
N |
N |
S |
X |
N |
N |
N |
N |
N |
|
|
04/10/2023 01:53 AM |
2,793 |
Edit |
04/22/2023 |
Jesse Straeter |
Jim Straeter |
04/08/2023 |
Rochester Middle School |
Rochester Middle School |
|
|
|
|
|
|
650 Zebra Lane |
|
Rochester |
IN |
46975 |
Fulton |
|
|
N |
|
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
QT2 480 |
144 |
|
|
|
|
24 |
|
|
24 |
576 |
192 |
2 |
|
|
|
|
|
|
|
Draft |
N |
N |
N |
N |
S |
X |
N |
N |
N |
N |
N |
|
|
04/10/2023 01:53 AM |
2,794 |
Edit |
06/24/2024 |
Jesse Straeter |
Jim Straeter |
04/08/2023 |
The Pearl |
The Pearl |
|
|
|
|
|
|
248 Pearl Street |
|
Ft. Wayne |
IN |
46802 |
Allen |
|
|
N |
|
|
Heliene |
144M 530 HC M10 BF S |
AP Systems |
QT2 480 |
120 |
|
|
|
|
|
|
|
0 |
0 |
0 |
62 |
198.00 |
210.94 |
|
|
|
|
|
Finalize |
Y |
N |
N |
Y |
Y |
X |
N |
Y |
N |
N |
N |
|
398 MN Panels, 120 QT2 480 |
04/10/2023 01:53 AM |
2,795 |
Edit |
08/22/2023 |
Jesse Straeter |
Jim Straeter |
04/08/2023 |
Marty Cripe |
Marty Cripe |
1236 N 600 E |
|
Elwood |
IN |
46,036 |
Tipton |
1236 N 600 E |
|
Elwood |
IN |
46036 |
Madison |
765-425-5715 |
|
N |
03/03/2023 |
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
33 |
|
|
1 |
|
2 |
|
|
3 |
66 |
22 |
64 |
20.04 |
|
|
|
|
|
|
Finalize |
Y |
N |
N |
Y |
S |
X |
Y |
Y |
N |
N |
N |
CW- permit is good. as of 6/14 check has been received, all documents have been received and it is now in technical review with Duke
8/15 A new one line had to be sent to Duke and we were told they have 10 days to review. Also, the $15 check (8012) that was sent in has been found and Duke shredded it since we found that we actually did not owe the $15. ET |
|
04/10/2023 01:53 AM |
2,796 |
Edit |
10/12/2023 |
Jesse Straeter |
Jim Straeter |
04/08/2023 |
Smith Grain Inc |
Smith Farms |
4725 W 100 N |
|
Rochester |
IN |
46,975 |
Fulton |
4725 East 100 North |
|
Rochester |
IN |
46975 |
Fulton |
574-835-2520 |
|
N |
|
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
QT2 1800WATT INVERTER |
150 |
|
|
|
|
25 |
|
|
25 |
600 |
200 |
3 |
|
|
Fulton County REMC |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
X |
Y |
Y |
N |
N |
N |
They have a grant.
6/22 Sent interconnection app to FCREMC. They informed me that the excess power will need to be sent to WVPA. Sent email to ask WVPA for proper paperwork and needed info. ET
6/27 Sent PPA to WVPA. ET
6/27 Jim filed for BZA variance. Meeting 8/9/23 @ 7pm. ET |
|
04/10/2023 01:53 AM |
2,797 |
Edit |
06/30/2023 |
Jesse Straeter |
Joel Davis |
04/08/2023 |
Elizabeth South |
Elizabeth South |
10750 Arba Pike |
|
Fountain City |
IN |
47,341 |
|
10750 Arba Pike |
|
Fountain City |
IN |
47341 |
|
765-969-1989 |
|
N |
03/11/2023 |
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
18 |
|
|
2 |
|
|
|
|
2 |
36 |
12 |
141 |
|
|
Duke |
|
|
|
|
Finalize |
Y |
Y |
Y |
Y |
Y |
X |
Y |
Y |
N |
N |
N |
|
|
04/10/2023 01:53 AM |
2,798 |
Edit |
05/15/2023 |
Jesse Straeter |
Joel Davis |
04/08/2023 |
Brian Hildebrand |
Brian Hildebrand |
PO Box 23 |
|
Yorktown |
IN |
47,396 |
Delaware |
12501 W 400 S |
|
Yorktown |
IN |
47396 |
Delaware |
765-621-1810 |
|
N |
11/09/2022 |
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
6 |
1 |
|
|
|
|
|
|
1 |
12 |
4 |
99 |
5.28 |
6.36 |
I&M |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
X |
Y |
Y |
N |
N |
N |
|
|
04/10/2023 01:53 AM |
2,799 |
Edit |
04/10/2023 |
Jesse Straeter |
Joel Davis |
04/08/2023 |
Likens Farm |
Likens Farms (bins) |
|
|
|
|
|
|
8094 W 300 N |
|
Anderson |
IN |
46011 |
Madison |
|
|
N |
06/28/2022 |
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
QT2 480 |
84 |
|
|
|
|
14 |
|
|
14 |
336 |
112 |
82 |
|
|
|
|
|
|
|
Draft |
N |
N |
N |
S |
Y |
X |
N |
N |
N |
N |
N |
|
USE 208V QT2. |
04/10/2023 01:53 AM |
2,800 |
Edit |
04/22/2023 |
Jesse Straeter |
Joel Davis |
04/08/2023 |
Likens Farm |
Likens Farms (shop) |
|
|
|
|
|
|
8094 W 300 N |
|
Anderson |
IN |
46011 |
Madison |
|
|
N |
06/28/2022 |
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
QT2 480 |
18 |
|
|
|
|
3 |
|
|
3 |
72 |
24 |
82 |
|
|
|
|
|
|
|
Draft |
N |
N |
N |
S |
Y |
X |
N |
N |
N |
N |
N |
|
USE 208V QT2. |
04/10/2023 01:53 AM |
2,801 |
Edit |
05/16/2023 |
Jesse Straeter |
Joel Davis |
04/08/2023 |
Tim Green |
Tim Green |
|
|
|
|
|
|
10398 S 100 E |
|
Lynn |
IN |
47355 |
Randolph |
|
|
N |
11/18/2022 |
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
9 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
133 |
|
|
|
|
|
|
|
Draft |
N |
N |
N |
N |
N |
X |
N |
Y |
N |
N |
N |
|
|
04/10/2023 01:53 AM |
2,802 |
Edit |
05/18/2023 |
Jesse Straeter |
Joel Davis |
04/08/2023 |
Kristina Honeycutt |
Kristina Honeycutt |
10214 S 100 E |
|
Lynn |
IN |
|
|
10214 W 100 E |
|
Lynn |
IN |
47355 |
Randolph |
765-874-2727 |
|
N |
12/05/2022 |
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
133 |
10.56 |
12.72 |
Whitewater Valley REMC |
|
|
|
|
Finalize |
N |
N |
Y |
N |
Y |
X |
Y |
Y |
N |
N |
N |
|
|
04/10/2023 01:53 AM |
2,803 |
Edit |
06/12/2023 |
Jesse Straeter |
Mark Luedke |
04/08/2023 |
Carl DauBach |
Carl DauBach |
3107 Sutterville Rd |
|
Fults |
IL |
62,244 |
Monroe |
3107 Sutterville Rd |
|
Fults |
IL |
62244 |
Monroe |
618-458-4674 |
|
N |
02/02/2023 |
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 & DS3-L |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
369 |
10.00 |
12.72 |
Monroe Co Electric Co-Op |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
X |
Y |
Y |
N |
N |
N |
Customer does not wish to enroll in ABP. |
Not enrolling in ABP |
04/10/2023 01:53 AM |
2,804 |
Edit |
04/22/2023 |
Jesse Straeter |
Mike Straeter |
04/08/2023 |
Co-Alliance |
Co-Alliance |
|
|
|
|
|
|
16 S Co Rd 1100 E |
|
Frankfort |
IN |
46041 |
Clinton |
|
|
N |
|
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
QT2 480 |
490 |
|
|
|
|
70 |
|
|
70 |
1,680 |
560 |
66 |
|
|
|
|
|
|
|
Draft |
N |
N |
N |
S |
S |
X |
N |
N |
N |
N |
N |
|
|
04/10/2023 01:53 AM |
2,805 |
Edit |
03/14/2024 |
Jesse Straeter |
Mike Straeter |
04/08/2023 |
Dr. John Marvel |
Dr. John Marvel |
|
|
|
|
|
|
771 E 800 S |
|
Fairmount |
IN |
46928 |
Grant |
765-661-1862 |
|
N |
07/08/2022 |
|
Heliene |
144M-530-HC-M10-BF-SL |
Enphase |
IQ8H |
36 |
|
|
2 |
|
|
|
|
2 |
36 |
12 |
71 |
13.82 |
19.08 |
|
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
X |
Y |
Y |
N |
N |
N |
CW – needs variance – sent variance paperwork to County 6/9. Co said no July variance meeting, will be pushed out to august. When time gets closer, Co will notify to update. 6/29
2/14 Called Grant County to schedule inspections. Had to leave a message. |
|
04/10/2023 01:53 AM |
2,806 |
Edit |
12/12/2023 |
Jesse Straeter |
Patty/Steve |
04/08/2023 |
Liechty Farms Inc |
Liechty Farms Inc |
4748 S 000 Rd |
|
Berne |
IN |
46,711 |
Adams |
635 W 450 S |
|
Berne |
IN |
46711 |
Adams |
|
|
N |
|
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
QT2 480 |
96 |
|
|
|
|
16 |
|
|
16 |
384 |
128 |
89 |
172.80 |
203.52 |
|
|
|
|
|
Finalize |
N |
N |
N |
N |
N |
X |
N |
Y |
N |
N |
N |
|
|
04/10/2023 01:53 AM |
2,807 |
Edit |
07/09/2024 |
Jesse Straeter |
Patty/Steve |
04/08/2023 |
Brent Blythe |
Brent Blythe (Farm) |
|
|
|
|
|
|
13630 Spencerville Road |
|
Spencerville |
OH |
45887 |
Allen |
|
|
N |
02/07/2023 |
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
QT2 480 |
36 |
|
|
|
|
6 |
|
|
6 |
144 |
48 |
116 |
|
|
|
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
X |
N |
Y |
N |
N |
N |
|
MUST BE IN BY END OF MAY FOR GRANT. |
04/10/2023 01:53 AM |
2,808 |
Edit |
06/06/2023 |
Jesse Straeter |
Patty/Steve |
04/08/2023 |
Brent Blythe |
Brent Blythe (house) |
13630 Spencerville Rd |
|
Spencerville |
OH |
45,887 |
|
13630 Spencerville Road |
|
Spencerville |
OH |
45887 |
Allen |
419-234-1750 |
|
N |
02/07/2023 |
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
15 |
1 |
|
1 |
|
|
|
|
2 |
30 |
10 |
116 |
12.32 |
|
|
|
|
|
|
Finalize |
Y |
Y |
Y |
Y |
Y |
X |
Y |
Y |
N |
N |
N |
|
|
04/10/2023 01:53 AM |
2,809 |
Edit |
07/09/2024 |
Jesse Straeter |
Patty/Steve |
04/08/2023 |
Andy Sarka |
Andy Sarka (ground mount install) |
|
|
|
|
|
|
15702 Rd 16-0 |
|
Columbus Grove |
OH |
45830 |
Putnam |
|
|
N |
11/20/2022 |
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
9 |
|
|
1 |
|
|
|
|
1 |
18 |
6 |
128 |
|
|
|
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
X |
N |
Y |
N |
N |
N |
|
|
04/10/2023 01:53 AM |
2,810 |
Edit |
07/09/2024 |
Jesse Straeter |
Patty/Steve |
04/08/2023 |
Andy Sarka |
Andy Sarka (roof mount, supplying parts) |
|
|
|
|
|
|
15702 Rd 16-0 |
|
Columbus Grove |
OH |
45830 |
Putnam |
|
|
N |
11/20/2022 |
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
10 |
|
|
|
|
|
|
|
0 |
0 |
0 |
128 |
|
|
|
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
X |
N |
Y |
N |
N |
N |
|
|
04/10/2023 01:53 AM |
2,811 |
Edit |
12/03/2024 |
Jesse Straeter |
Patty/Steve |
04/08/2023 |
Goyings Farm |
Goyings Farm |
12152 Road 162 |
|
Paulding |
OH |
45,879 |
Paulding |
12571 US Route 127 |
|
Paulding |
OH |
45879 |
Paulding |
419-769-4469 |
|
N |
10/22/2024 |
|
Heliene |
Heliene 144HC M10 Bifacial 540 |
AP Systems |
DS3 |
27 |
|
|
3 |
|
|
|
|
3 |
54 |
18 |
102 |
|
29.16 |
|
|
|
|
|
Finalize |
Y |
Y |
N |
Y |
Y |
X |
N |
N |
N |
N |
N |
|
|
04/10/2023 01:53 AM |
2,812 |
Edit |
05/16/2023 |
Jesse Straeter |
Curt Dambman |
04/08/2023 |
Don Rolen |
Don Rolen |
25060 Como Road |
|
Como |
IL |
61,081 |
Whiteside |
25060 Como Road |
|
Como |
IL |
61081 |
Whiteside |
815-499-8004 |
|
N |
03/02/2023 |
05/04/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
12 |
2 |
|
|
|
|
|
|
2 |
24 |
8 |
235 |
10.56 |
12.72 |
ComEd |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
|
|
04/10/2023 01:53 AM |
2,813 |
Edit |
04/29/2023 |
Jesse Straeter |
Curt Dambman |
04/08/2023 |
I.V. Enterprises |
I.V. Enterprises c/o Wayne Wilhelm |
2111 Timbershore Dr |
|
Lanark |
IL |
61,046 |
Carroll |
13999 Maple Grove Raod |
|
Shannon |
IL |
61078 |
Carroll |
815-238-4541 |
|
N |
03/29/2023 |
01/19/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
60 |
|
|
|
|
|
|
5 |
5 |
140 |
40 |
253 |
52.80 |
63.60 |
ComEd |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
must provide mechanics lien waiver upon final payment. Need private locate, verifying. |
Final system price $144,100.00 |
04/10/2023 01:53 AM |
2,814 |
Edit |
08/16/2023 |
Jesse Straeter |
Curt Dambman |
04/08/2023 |
Art Garcia |
Art Garcia |
8726 S Massbach Rd |
|
Elizabeth |
IL |
61,028 |
Joe Daviess |
8726 S Massbach Rd |
|
Elizabeth |
IL |
61028 |
Jo Daviess |
815-677-8172 |
|
N |
02/03/2023 |
05/30/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
9 |
|
|
1 |
|
|
|
|
1 |
18 |
6 |
275 |
7.92 |
|
Jo-Carroll Energy |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
Y |
Y |
CW – Co emailed customer for directory photos. I sent email to Curt to see if he had what he needed. 7/25 |
Jo-Carroll Energy requires directory placards at array and meter. |
04/10/2023 01:53 AM |
2,815 |
Edit |
12/12/2023 |
Jesse Straeter |
Curt Dambman |
04/08/2023 |
Richard Hoff |
Richard Hoff - Black Rd |
19716 Acker Road |
|
Fulton |
IL |
61,252 |
Whiteside |
13180 Black Rd. |
|
Morrison |
IL |
61270 |
Whiteside |
563-249-2579 |
|
N |
06/30/2022 |
11/30/2022 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
27 |
|
|
3 |
0 |
|
|
|
3 |
54 |
18 |
246 |
23.76 |
28.62 |
ComEd |
|
|
|
|
Finalize |
Y |
N |
N |
Y |
Y |
Y |
Y |
Y |
N |
Y |
Y |
All remittance Carbon Credits, etc. go to: Jeff Hoff, 17811 Frog Pond Road, Garden Plain, IL 61252 |
Inverter was reverted back to DS3 after transformer installation was determined. Single phase service acts as three phase. |
04/10/2023 01:53 AM |
2,816 |
Edit |
06/03/2023 |
Jesse Straeter |
Doug Smith |
04/08/2023 |
Bryan and Katy Ideus |
Bryan and Katy Ideus |
815 Co Rd 3150 North |
|
Dewey |
IL |
61,840 |
Champaign |
8150 Co Rd 3150 North |
|
Dewey |
IL |
61840 |
Champaign |
217-714-6689 |
|
N |
10/19/2022 |
03/28/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
18 |
1 |
|
|
|
1 |
|
|
2 |
36 |
12 |
154 |
15.84 |
19.08 |
Eastern Illini |
|
|
|
|
Finalize |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
|
|
04/10/2023 01:53 AM |
2,817 |
Edit |
12/04/2023 |
Jesse Straeter |
Doug Smith |
04/08/2023 |
Cris Harris |
Cris Harris |
8781 N 25th St |
|
Oblong |
IL |
62,449 |
|
8781 N 25th St |
|
Oblong |
IL |
62449 |
Crawford |
618-553-2611 |
|
N |
11/09/2022 |
04/10/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 & DS3-L |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
230 |
10.00 |
12.72 |
Norris Electric Coop |
|
|
|
|
Finalize |
Y |
Y |
Y |
Y |
Y |
Y |
N |
Y |
Y |
Y |
Y |
|
|
04/10/2023 01:53 AM |
2,818 |
Edit |
06/03/2023 |
Jesse Straeter |
Doug Smith |
04/08/2023 |
Greg Hevron |
Greg Hevron |
12773 E 325th Ave |
|
Flat Rock |
IL |
62,427 |
Crawford |
12773 E 325th Ave |
|
Flat Rock |
IL |
62427 |
Crawford |
281-891-0200 |
|
N |
02/24/2023 |
06/04/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 & DS3-L |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
222 |
10.00 |
12.72 |
Norris Electric Coop |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
N |
Y |
N |
N |
Y |
|
|
04/10/2023 01:53 AM |
2,819 |
Edit |
12/06/2023 |
Jesse Straeter |
Doug Smith |
04/08/2023 |
Palestine CUSD#3 |
Palestine Grade School |
203 S Washington Street |
Grade School |
Palestine |
IL |
62,451 |
Crawford |
203 S Washington St |
|
Palestine |
IL |
62451 |
Crawford |
618-586-2711 |
|
Y |
07/18/2022 |
04/10/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
QT2 480 |
72 |
|
|
|
|
12 |
|
|
12 |
288 |
96 |
211 |
129.60 |
152.64 |
Ameren Illinois |
|
|
|
|
Finalize |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
12/5 - Interconnection (construction complete) |
L-shaped Site Plan is final. |
04/10/2023 01:53 AM |
2,820 |
Edit |
06/29/2023 |
Jesse Straeter |
Doug Smith |
04/08/2023 |
Dustin Clark |
Dustin Clark |
469 E 400th Ave. |
|
Oblong |
IL |
62,449 |
Crawford |
469 E 400th Ave. |
|
Oblong |
IL |
62449 |
Crawford |
618-553-0069 |
|
N |
01/09/2023 |
05/09/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 & DS3-L |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
234 |
10.00 |
12.72 |
Norris Electric Cooperative |
Option 1 |
Option 1 |
1 |
18.5 |
Finalize |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
Customer added battery. Schematic and one line diagram need uploaded to ABP Part II application.
5/11 Norris Electric interconnection submitted. ET
5/23 Interconnection approved. ET |
Battery schematic and one line diagram need to be uploaded to ABP Part II application. |
04/10/2023 01:53 AM |
2,821 |
Edit |
08/16/2023 |
Jesse Straeter |
Gary Rosen |
04/08/2023 |
Brad and Dawn Becker |
Brad and Dawn Becker |
9280 Kohrmann Rd |
|
Bartelso |
IL |
62,218 |
Clinton |
9280 Kohrmann Rd |
|
Bartelso |
IL |
62218 |
Clinton |
618-363-2939 |
|
N |
11/02/2022 |
03/27/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
24 |
|
|
|
|
2 |
|
|
2 |
48 |
16 |
312 |
21.10 |
25.40 |
|
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
N |
Y |
N |
N |
Y |
|
|
04/10/2023 01:53 AM |
2,822 |
Edit |
06/14/2023 |
Jesse Straeter |
Gary Rosen |
04/08/2023 |
Cory Gebke |
Cory Gebke |
|
|
|
|
|
|
702 Green Street |
|
Germantown |
IL |
62245 |
Clinton |
618-910-4578 |
|
N |
05/12/2023 |
04/07/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
24 |
|
|
|
|
2 |
|
|
2 |
48 |
16 |
318 |
21.12 |
25.44 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
N |
Y |
N |
N |
Y |
|
|
04/10/2023 01:53 AM |
2,823 |
Edit |
08/16/2023 |
Jesse Straeter |
Gary Rosen |
04/08/2023 |
Jason Cooper |
Jason Cooper |
|
|
|
|
|
|
11537 Sugar Fork Dr |
|
Alhambra |
IL |
62001 |
Madison |
|
|
N |
09/27/2022 |
03/20/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
15 |
1 |
|
1 |
|
|
|
|
2 |
30 |
10 |
311 |
|
|
|
|
|
|
|
Cold |
N |
N |
N |
Y |
Y |
Y |
N |
N |
N |
N |
Y |
|
|
04/10/2023 01:53 AM |
2,824 |
Edit |
06/14/2023 |
Jesse Straeter |
Gary Rosen |
04/08/2023 |
Renee and Timothy Moore |
Renee and Timothy Moore |
|
|
|
|
|
|
501 Parkview Lane |
|
Bartelso |
IL |
62218 |
Clinton |
618-972-7666 |
|
N |
10/26/2022 |
04/03/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
24 |
|
|
|
|
2 |
|
|
2 |
48 |
16 |
314 |
|
|
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
N |
Y |
Y |
N |
Y |
N |
N |
Y |
|
|
04/10/2023 01:53 AM |
2,825 |
Edit |
12/04/2023 |
Jesse Straeter |
Gary Rosen |
04/08/2023 |
Sugar Creek Fire Department |
Sugar Creek Fire Dept |
1001 W Broadway St |
|
Trenton |
IL |
62,293 |
Clinton |
1001 West Broadway St |
|
Trenton |
IL |
62293 |
Clinton |
618-593-3036 |
|
Y |
|
05/11/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
15 |
1 |
|
1 |
|
|
|
|
2 |
30 |
10 |
317 |
13.20 |
|
Ameren |
|
|
|
|
Finalize |
Y |
N |
N |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
CW – waiting for Ameren approval. Ameren needs updated one-line. Sent email to Brit/Liz to be able to open app to upload 5/3 – 5/18 Ameren approved for construction.
Building permits went to the City of Trenton not Clinton County. |
Clinton Co did not indicate the Fire Department is in the City of Trenton Jurisdiction. 5/17 – found out a permit must be submitted to the City of Trenton and will need to be signed off on by an engineer. Gary to follow up with Mark Ritter of WRF Engineering to get this done. LL (there will not be signed BOS on this system as there is a special system purchase agreement with Ag Tech. F/U with Jim on this) LL |
04/10/2023 01:53 AM |
2,826 |
Edit |
08/16/2023 |
Jesse Straeter |
Gary Rosen |
04/08/2023 |
Norman Horenkamp |
Norman Horenkamp |
1919 Mill Rd |
|
Trenton |
IL |
62,293 |
Clinton |
1919 Mill Rd |
|
Trenton |
IL |
62293 |
Clinton |
61824-7218 |
|
N |
09/15/2022 |
03/01/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 & DS3-L |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
318 |
|
|
|
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
|
|
04/10/2023 01:53 AM |
2,827 |
Edit |
12/04/2023 |
Jesse Straeter |
Jim Straeter |
04/08/2023 |
Beck's Superior Hybrids |
Becks - El Paso Plant |
6767 E 276th Street |
|
Atlanta |
IN |
|
|
187 N. Fayette Street |
|
El Paso |
IL |
61738 |
Woodford |
317-376-3651 |
317-565-4172 |
N |
|
02/08/2021 |
Heliene |
144M-530-HC-M10-BF-SL |
|
|
|
|
|
|
|
104 |
|
|
104 |
2,496 |
832 |
167 |
|
|
Ameren Illinois |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
|
*This project was waitlisted at the time Prevailing Wages were put into effect and it is still being determined if PW is applicable. LL |
04/10/2023 01:53 AM |
2,828 |
Edit |
05/16/2024 |
Jesse Straeter |
Jim Straeter |
04/08/2023 |
Caitlin Klaybor |
Caitlin Klaybor |
10010 Old US 13 |
|
Murphysboro |
IL |
62,966 |
|
10010 Old Highway 13 |
|
Murphysboro |
IL |
62966 |
Jackson |
618-967-4180 |
|
N |
|
12/30/2022 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
15 |
1 |
|
1 |
|
|
|
|
2 |
30 |
10 |
361 |
|
|
|
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
|
|
04/10/2023 01:53 AM |
2,829 |
Edit |
01/15/2024 |
Jesse Straeter |
Justin Detmer |
04/08/2023 |
Darron VanDorn |
Darron Vandorn |
|
|
|
|
|
|
4518 Van Buren Road |
|
Oakdale |
IL |
62268 |
Washington |
|
|
N |
09/21/2023 |
03/21/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
328 |
|
|
Tri County Elec Coop |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
CW-started utility app, need to do site plan, 1-line. Need parcel boundaries from homeower, Co doesn’t have public GIS and won’t email boundaries. Sent email to Justic to get the boundaries 6/9 sent f/u email to Justin 6/20 received paper boundaries. Have question out to County for measurements which are not on the paper. 6/30 No response from Co, will proceed like normal. 7/7 No signed BOS/SCA, Jim to talk to Justin 7/17 |
|
04/10/2023 01:53 AM |
2,830 |
Edit |
05/18/2023 |
Jesse Straeter |
Justin Detmer |
04/08/2023 |
John Detmer |
John Detmer |
8025 4th Street |
|
Breese |
IL |
62,230 |
Clinton |
8025 4th Street |
|
Breese |
IL |
62230 |
Clinton |
618-973-3587 |
|
N |
09/26/2022 |
03/16/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
18 |
3 |
|
|
|
|
|
|
3 |
36 |
12 |
309 |
15.80 |
19.08 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
|
|
04/10/2023 01:53 AM |
2,831 |
Edit |
08/16/2023 |
Jesse Straeter |
Justin Detmer |
04/08/2023 |
Mark and Mary Green |
Mark and Mary Green |
|
|
|
|
|
|
6014 Highbanks Rd |
|
Mascoutah |
IL |
62258 |
St. Clair |
|
|
N |
|
03/22/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 & DS3-L |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
331 |
|
|
|
|
|
|
|
Cold |
N |
N |
N |
N |
N |
Y |
N |
N |
N |
N |
Y |
Not moving forward |
have not signed BOS or SCA |
04/10/2023 01:53 AM |
2,832 |
Edit |
07/19/2023 |
Jesse Straeter |
Justin Detmer |
04/08/2023 |
Mark Litteken |
Mark Litteken (CSG) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
N |
|
|
|
|
Enphase |
IQ7+ |
130 |
|
|
|
|
|
5 |
|
5 |
130 |
40 |
|
|
|
|
|
|
|
|
Draft |
N |
N |
N |
N |
N |
Y |
N |
N |
N |
N |
Y |
CW - Most recent info is from 3/23 no current signed BOS.SCA and no other needed docs, email out to Justin for status 7/19 |
Off waitlist, waiting on USDA Grant paperwork, CSG needs update. |
04/10/2023 01:53 AM |
2,833 |
Edit |
08/16/2023 |
Jesse Straeter |
Mark Luedke |
04/08/2023 |
Aaron Sensel |
Aaron Sensel |
5520 South Fork Rd |
|
Prairie Du Rocher |
IL |
62,277 |
Monroe |
5520 South Fork Rd |
|
Prairie Du Rocher |
IL |
62277 |
Monroe |
618-977-0005 |
|
N |
06/23/2022 |
11/16/2022 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
21 |
|
|
1 |
|
1 |
|
|
2 |
42 |
14 |
372 |
18.48 |
22.26 |
Monroe County Electric Cooperative |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
|
|
04/10/2023 01:53 AM |
2,834 |
Edit |
06/20/2023 |
Jesse Straeter |
Mark Luedke |
04/08/2023 |
Adam and Lori Young |
Adam and Lori Young |
2758 EAst 1100 North Road |
|
Homer |
IL |
61,849 |
Champaign |
2758 County Rd 1100 N |
|
Homer |
IL |
61849 |
Champaign |
217-918-3045 |
|
N |
10/19/2022 |
02/01/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 & DS3-L |
30 |
|
|
2 |
|
1 |
|
|
3 |
60 |
20 |
137 |
24.83 |
31.80 |
Ameren Illinois |
|
|
|
|
Finalize |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Customer has two systems located on the same parcel. One serves the shop and the other serves the home. The IL Shines app is combined. |
One 18-panel array to serve the shop. One 18-panel array and one 24-panel array to serve the home. Systems located on same parcel. Combined IL Shines app. |
04/10/2023 01:53 AM |
2,835 |
Edit |
06/20/2023 |
Jesse Straeter |
Mark Luedke |
04/08/2023 |
Claus Schultz |
Claus Schultz |
511 N CR 475 E |
|
Bourbon |
IL |
61,953 |
Douglas |
511 N CR 475 E |
|
Bourbon |
IL |
61953 |
Douglas |
217-254-0708 |
|
N |
11/28/2022 |
02/08/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
9 |
|
|
1 |
|
|
|
|
1 |
18 |
6 |
190 |
7.92 |
9.54 |
Ameren |
|
|
|
|
Finalize |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
50% Tax Exempt Sale. Get IL ST-587 (tax exempt form) on file. |
Installed |
04/10/2023 01:54 AM |
2,836 |
Edit |
12/04/2023 |
Jesse Straeter |
Mark Luedke |
04/08/2023 |
Heritage FS Inc |
Heritage FS (Cissna Park) |
424 N State Rt 49 |
|
Cissna Park |
IL |
60,942 |
Iroquois |
424 N State Rt 49 |
|
Cissna Park |
IL |
60924 |
Iroquois |
815-265-4751 |
|
Y |
06/22/2022 |
08/10/2022 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
QT2 480 |
24 |
|
|
4 |
|
|
|
|
4 |
72 |
24 |
111 |
|
|
Ameren |
|
|
|
|
Finalize |
Y |
N |
N |
Y |
Y |
Y |
N |
Y |
N |
N |
Y |
|
|
04/10/2023 01:54 AM |
2,837 |
Edit |
03/14/2024 |
Jesse Straeter |
Mark Luedke |
04/08/2023 |
Heritage FS Inc |
Heritage Gilman Terminal meter 1 |
|
|
|
|
|
|
1643 N US Highway 45 |
|
Gilman |
IL |
60938 |
Iroquois |
|
|
Y |
06/22/2022 |
07/25/2022 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
QT2 480 |
156 |
|
|
|
|
26 |
|
|
26 |
624 |
208 |
112 |
|
|
|
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
|
|
04/10/2023 01:54 AM |
2,838 |
Edit |
12/04/2023 |
Jesse Straeter |
Mark Luedke |
04/08/2023 |
Heritage FS Inc |
Heritage Gilman Terminal meter 2 |
|
|
|
|
|
|
1643 N US Highway 45 |
|
Gilman |
IL |
60938 |
Iroquois |
|
|
Y |
06/22/2022 |
07/26/2022 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
QT2 480 |
24 |
|
|
|
|
4 |
|
|
4 |
96 |
32 |
112 |
|
|
Ameren |
|
|
|
|
Finalize |
Y |
N |
N |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
9/19 811 called for site. X232621829 |
|
04/10/2023 01:54 AM |
2,839 |
Edit |
06/20/2023 |
Jesse Straeter |
Mark Luedke |
04/08/2023 |
Jeff Clements |
Jeff Clements |
822 IL Rt 121 |
|
Mt. Pulaski |
IL |
62,548 |
Logan |
822 IL Rt 121 |
|
Mt. Pulaski |
IL |
62548 |
Logan |
217-871-0849 |
|
N |
10/11/2022 |
03/23/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
21 |
|
|
1 |
|
1 |
|
|
2 |
42 |
14 |
218 |
18.48 |
22.26 |
Ameren Illinois |
|
|
|
|
Finalize |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
N |
Y |
|
|
04/10/2023 01:54 AM |
2,840 |
Edit |
06/20/2023 |
Jesse Straeter |
Mark Luedke |
04/08/2023 |
Kevin Green |
Kevin Green |
17938 N 680 E Rd |
|
Fithian |
IL |
61,844 |
Vermilion |
17938 N 680 E Rd |
|
Fithian |
IL |
61844 |
Vermilion |
217-778-4030 |
|
N |
06/29/2022 |
11/29/2022 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
18 |
|
|
2 |
|
|
|
|
2 |
36 |
12 |
129 |
15.84 |
19.08 |
Ameren |
|
|
|
|
Finalize |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
|
|
04/10/2023 01:54 AM |
2,841 |
Edit |
08/16/2023 |
Jesse Straeter |
Mark Luedke |
04/08/2023 |
Mike and Kay |
Mike and Kay House |
22633 Edgewood Road |
|
Ashmore |
IL |
61,912 |
Coles |
22631 Edgewood Rd |
|
Ashmore |
IL |
61912 |
Coles |
217-218-6750 |
|
N |
10/13/2022 |
03/10/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 & DS3-L |
24 |
|
|
|
|
2 |
|
|
2 |
48 |
16 |
182 |
10.00 |
12.72 |
|
|
|
|
|
Cold |
N |
N |
Y |
N |
S |
Y |
N |
N |
N |
N |
Y |
CW – no permit. In technical review as of 4/12. Jim w/Coles Moultrie has issue with SLD. Mike is helping with this & has sent an email to Mark re: SLD 4/27
Not moving forward. |
|
04/10/2023 01:54 AM |
2,842 |
Edit |
06/29/2023 |
Jesse Straeter |
Mark Luedke |
04/08/2023 |
Olen Frahm |
Olen Frahm - 24.832kW |
610 North Co Rd 475 E |
|
Tuscola |
IL |
61,953 |
Douglas |
610 North Co Rd 475 E |
|
Tuscola |
IL |
61953 |
Douglas |
217-202-8099 |
|
N |
10/10/2022 |
03/06/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
(16)DS3/(14)DS3L |
30 |
0 |
0 |
2 |
|
1 |
0 |
0 |
3 |
60 |
20 |
189 |
24.83 |
31.80 |
Ameren Illinois |
|
|
|
|
Finalize |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
|
Customer downsized system to 24.832. Reapplying to ABP and notifying Ameren. |
04/10/2023 01:54 AM |
2,843 |
Edit |
06/20/2023 |
Jesse Straeter |
Mark Luedke |
04/08/2023 |
Scott and Heather Martin |
Scott and Heather Martin |
|
|
|
|
|
|
1650 2250th St |
|
Atlanta |
IL |
61723 |
Logan |
217-871-1595 |
|
N |
11/02/2022 |
03/13/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
24 |
|
|
|
|
2 |
|
|
2 |
48 |
16 |
203 |
21.12 |
25.44 |
Ameren |
|
|
|
|
Finalize |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
N |
Y |
|
|
04/10/2023 01:54 AM |
2,844 |
Edit |
06/29/2023 |
Jesse Straeter |
Mark Luedke |
04/08/2023 |
Tim Kraft |
Tim Kraft |
502 County Rd 1700 East |
|
Philo |
IL |
61,864 |
Champaign |
502 County Rd 1700 East |
|
Philo |
IL |
61864 |
Champaign |
217-552-2079 |
|
N |
10/12/2022 |
02/07/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
24 |
|
|
|
|
2 |
|
|
2 |
48 |
16 |
157 |
21.12 |
25.44 |
EIEC |
|
|
|
|
Finalize |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
|
|
04/10/2023 01:54 AM |
2,845 |
Edit |
08/02/2023 |
Jesse Straeter |
Mark Luedke |
04/08/2023 |
Danny Shutt |
Danny J Shutt |
402 S Leney St |
|
Ogden |
IL |
61,859 |
|
402 S Leney St |
|
Ogden |
IL |
61859 |
Champaign |
2172027834 |
|
N |
12/28/2022 |
05/08/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
|
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
139 |
|
|
Ameren |
|
|
|
|
Finalize |
Y |
Y |
Y |
Y |
Y |
Y |
N |
Y |
N |
N |
Y |
There is not a signed BOS on file, but he signed the Solar Contract Agreement.
CW – heard from Village, b/c he is going across a Village rd, the mayor and a committee will decide if they will allow going across the rd. Village will get back to me. 4/28
7/14 Danny called and said they went to the Village Board meeting 7/13 and were approved. He will be sending us the actual signed approval. ET |
|
04/10/2023 01:54 AM |
2,846 |
Edit |
06/21/2023 |
Jesse Straeter |
Mark Luedke |
04/08/2023 |
Tony Mulholland |
Tony Mulholland |
|
|
|
|
|
|
9575 Harbaugh Lane |
|
Red Bud |
IL |
62278 |
Randolph |
|
|
N |
06/27/2022 |
11/07/2022 |
|
144HC-M6-450 BIFACIAL MAX SERIES |
Enphase |
IQ8H |
|
|
|
|
|
|
1 |
|
1 |
26 |
8 |
355 |
|
|
|
|
|
|
|
Cold |
N |
N |
N |
N |
N |
Y |
N |
N |
N |
N |
Y |
Customer not going forward with system. |
Need site plan. |
04/10/2023 01:54 AM |
2,847 |
Edit |
06/21/2023 |
Jesse Straeter |
Mark Luedke |
04/08/2023 |
Matt Ringstrom |
Matt Ringstrom |
|
|
|
|
|
|
15094 North 1070 East |
|
Catlin |
IL |
61817 |
Vermilion |
|
|
N |
|
05/20/2021 |
Q Cells |
Q.PEAK DUO L G6.2 430W |
Enphase |
IQ7+ |
34 |
|
1 |
|
1 |
|
|
|
2 |
34 |
10 |
123 |
|
|
|
|
|
|
|
Cold |
N |
N |
N |
Y |
Y |
Y |
N |
N |
N |
N |
Y |
Not following through with system. |
ON HOLD. I made the assumption this is using part # Q.PEAK DUO L G6.2 430W based on it saying QCell430 on the spreadsheet. - Jesse |
04/10/2023 01:54 AM |
2,848 |
Edit |
06/30/2023 |
Jesse Straeter |
Mark Luedke |
04/08/2023 |
Penny Butler |
Penny Butler |
148 N 700 East Rd |
|
McLean |
IL |
61,754 |
|
148 N 700 East Road |
|
McLean |
IL |
61754 |
McLean |
309-830-1707 |
|
N |
02/27/2023 |
05/29/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
21 |
|
|
1 |
|
1 |
|
|
2 |
42 |
14 |
190 |
18.48 |
22.20 |
Ameren |
|
|
|
|
Finalize |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
Mark to remove trees where solar is to be located!!! |
|
04/10/2023 01:54 AM |
2,849 |
Edit |
09/18/2023 |
Jesse Straeter |
Mark Luedke |
04/08/2023 |
Aaron Galloway |
Aaron Galloway |
8270 N 1900 E |
|
Fairbury |
IL |
61,739 |
Livingston |
8270 N 1900 E Rd |
|
Fairbury |
IL |
61739 |
Livingston |
618-419-7002 |
|
N |
12/10/2023 |
05/23/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
21 |
|
|
1 |
|
1 |
|
|
2 |
42 |
14 |
143 |
18.48 |
22.26 |
Ameren Illinois |
|
|
|
|
Finalize |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
|
|
04/10/2023 01:54 AM |
2,850 |
Edit |
11/10/2023 |
Jesse Straeter |
Mark Luedke |
04/08/2023 |
Jim Darr |
Jim Darr |
8306 E 1100 N Road |
|
Fairmount |
IL |
61,841 |
|
8306 E 1100 N Rd |
|
Fairmount |
IL |
61841 |
Vermilion |
217-304-2311 |
|
N |
02/08/2023 |
05/23/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
9 |
|
|
1 |
|
|
|
|
1 |
18 |
6 |
130 |
|
|
Ameren |
|
|
|
|
Finalize |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
8/4 Mark is checking on the grant status for this project and will let us know when to put it on the build schedule. Ameren deadline is 10/2/23. ET
10/27 Requested a second extension on construction from Ameren. |
System located in Vermilion County. No permits required. |
04/10/2023 01:54 AM |
2,851 |
Edit |
11/10/2023 |
Jesse Straeter |
Mark Luedke |
04/08/2023 |
David Green |
David Green |
12378 E 580 N Rd |
|
Georgetown |
IL |
61,846 |
Carroll |
12378 E 580 N Rd |
|
Georgetown |
IL |
61846 |
Carroll |
217-412-7783 |
|
N |
11/29/2022 |
03/03/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
(7)DS3 & (5)DS3-L |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
134 |
10.00 |
12.72 |
Ameren Illinois |
|
|
|
|
Finalize |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
|
|
04/10/2023 01:54 AM |
2,852 |
Edit |
11/10/2023 |
Jesse Straeter |
Mark Luedke |
04/08/2023 |
Aaron Patten - Shop |
Aaron Patten - Shop |
25266 St Rt 1 |
|
Bismarck |
IL |
61,814 |
Vermilion |
25266 State Route 1 |
|
Bismarck |
IL |
61814 |
Vermilion |
217-497-9382 |
|
N |
04/05/2023 |
08/03/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 & DS3-L |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
117 |
10.00 |
|
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
No permit required.
8/2 customer waiting on grant application. LL |
Ameren Acct# 9747000739
Ameren DER-19799
Ameren Construction deadline 10/28/2023 |
04/10/2023 01:54 AM |
2,853 |
Edit |
04/29/2023 |
Jesse Straeter |
Ron Tombaugh |
04/08/2023 |
Brian Defenbaugh |
Brian Defenbaugh |
30808 North 900 East Road |
|
Manville |
IL |
61,319 |
Livingston |
30808 North 900 East Road |
|
Manville |
IL |
61319 |
Livingston |
815-257-7777 |
|
N |
06/24/2023 |
11/21/2022 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
48 |
|
|
|
|
4 |
|
|
4 |
96 |
32 |
148 |
42.20 |
50.88 |
ComEd |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
|
|
04/10/2023 01:54 AM |
2,854 |
Edit |
07/19/2023 |
Doug Smith |
Doug Smith |
04/10/2023 |
J and K Stafford Farms LLC |
Stafford Farms |
10558 W State Rte 28 |
|
Kempton |
IN |
46,049 |
Tipton |
2287 S 975 W |
|
Tipton |
IN |
46072 |
Tipton |
765-438-1722 |
|
N |
04/07/2023 |
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
15 |
1 |
|
1 |
|
|
|
|
2 |
30 |
10 |
65 |
13.20 |
15.90 |
Duke |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
X |
Y |
Y |
N |
N |
N |
Customer applied for a USDA REAP Grant
6/7 Duke interconnection submitted. Requested app fee from Melinda. ET
6/12 Submitted Tipton Co permit. ET 6/27 Tipton Co approved permit. ET |
|
04/10/2023 07:30 PM |
2,855 |
Edit |
07/19/2023 |
Doug Smith |
Doug Smith |
04/10/2023 |
Steve Freshour |
Freshour |
1233 W 1500 N |
|
Silver Lake |
IN |
46,982 |
Kosciusko |
1233 W 1500 N |
|
Silver Lake |
IN |
46982 |
Kosciusko |
(260) 901-0958 |
|
N |
04/10/2023 |
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
15 |
1 |
|
1 |
|
|
|
|
2 |
30 |
10 |
25 |
13.20 |
15.90 |
KREMC |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
X |
Y |
Y |
N |
N |
N |
6/1 Sent KREMC interconnection app to customer for signature. ET
6/13 Submitted KREMC interconnection app. Submitted drawings to County Plan Director. ET
7/10 Sent email to KREMC about interconnection and County Plan Director since we have not received any feedback. ET |
|
04/10/2023 07:42 PM |
2,856 |
Edit |
08/07/2023 |
|
Jim Straeter |
04/11/2023 |
William Lappin |
|
26200 State Road 4 |
|
North Liberty |
IN |
46,554 |
St Joseph |
26200 State Road 4 |
|
North Liberty |
IN |
46554 |
St Joseph |
574-279-2639 |
|
N |
04/07/2023 |
06/30/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
18 |
|
|
2 |
|
|
|
|
2 |
36 |
12 |
40 |
15.84 |
19.08 |
NIPSCO |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
X |
Y |
Y |
Y |
N |
N |
Farm Site installation single phase energy
CW – Will need electrical permit
4/19 NIPSCO requested William Lappin’s name be on the interconnection application instead of Martin’s. That was revised and resubmitted. ET
5/11 Sent an email to NIPSCO requesting update on application. ET
5/30 NIPSCO requested a different site plan which was submitted. ET
6/5 NIPSCO approved interconnection. ET |
|
04/11/2023 03:29 PM |
2,858 |
Edit |
08/16/2023 |
Laura Lewis |
Gary Rosen |
04/12/2023 |
Craig and Chelsie Deiters |
|
4173 Hidden Hills Lane |
|
Aviston |
IL |
62,216 |
Clinton |
4173 Hidden Hills Lane |
|
Aviston |
IL |
62216 |
Clinton |
618-520-2122 |
|
N |
04/12/2023 |
08/17/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
21 |
0 |
0 |
1 |
0 |
1 |
0 |
0 |
2 |
42 |
14 |
320 |
18.48 |
22.26 |
Clinton County Electric Cooperative Inc. |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
|
Solar install will be connected to 320 amp service with a generator. Line side tap inside the 400 amp transfer switch. There is an electrical bulkhead with the service and generator on the left side of the driveway that supplies the house. |
04/12/2023 04:25 PM |
2,860 |
Edit |
08/18/2023 |
|
Mark Luedke |
04/12/2023 |
Charles and Marsha Hedrick |
Charles Hedrick |
2775 E Co Rd 2700 N |
|
Penfield |
IL |
61,862 |
Champaign |
2775 E County Road 2700 N |
|
Penfield |
IL |
61862 |
Champaign |
217-841-3861 |
|
N |
04/12/2023 |
08/21/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
18 |
|
|
2 |
|
|
|
|
2 |
36 |
12 |
133 |
15.84 |
19.08 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
5/26 Ameren interconnection submitted (DER-21338). ET
6/13 Revised one-line diagram sent to Ameren. ET |
Ameren acct#6858035718
meter# 72391969 |
04/12/2023 08:10 PM |
2,861 |
Edit |
02/14/2024 |
Ericka Tyler |
Mark Luedke |
04/13/2023 |
Kenton Carley |
Kenton Carley House |
1649 E 1300 N |
|
Milford |
IL |
60,953 |
Iriquois |
1649 E 1300 N |
|
Milford |
IL |
60953 |
Iriquois |
815-867-6150 |
|
N |
04/16/2023 |
08/21/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
|
10.00 |
12.72 |
Eastern Illini Coop |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
Iroquois County spelled wrong in drop down.
No permit required.
6/2 Interconnection under engineer review. ET
6/5 Interconnection approval. ET |
System has 7 DS3 and 5 DS3-L inverters. System will be installed to the SE corner of existing shed and tie in to the 200amp breaker box on the NE corner of the shed. |
04/13/2023 02:31 PM |
2,862 |
Edit |
06/29/2023 |
Laura Lewis |
Curt Dambman |
04/19/2023 |
Ray Vos - Home |
Ray Vos - Home |
18917 Clark Road |
|
Chadwick |
IL |
61,014 |
Carroll |
18917 Clark Road |
|
Chadwick |
IL |
61014 |
Carroll |
815-631-1110 |
|
N |
12/12/2022 |
08/08/2022 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
12 |
0 |
0 |
0 |
0 |
1 |
0 |
0 |
1 |
24 |
8 |
258 |
18,210.00 |
|
Jo-Carroll Energy |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
N |
Y |
Y |
N |
Y |
Y |
|
System to be installed on parcel where home is located. |
04/19/2023 01:46 PM |
2,863 |
Edit |
06/26/2023 |
Jim Straeter |
Jim Straeter |
04/19/2023 |
Adam Dollarhide |
|
1198 N 225 W |
|
Rushville |
IN |
46,173 |
Rush/City of Rushville |
1198 N 225 W |
|
Rushville |
IN |
46173 |
Rush/City of Rushville |
765-570-6269 |
765-932-7205 |
N |
04/19/2023 |
07/31/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
110 |
10.56 |
12.72 |
Duke |
|
|
|
|
Finalize |
Y |
N |
N |
Y |
Y |
X |
Y |
Y |
N |
N |
N |
Mr. Dollarhide is the manager of the Trane plant in Rushville |
|
04/19/2023 06:54 PM |
2,864 |
Edit |
08/07/2023 |
Ericka Tyler |
Mark Luedke |
04/20/2023 |
Aaron Patten - House |
Aaron Patten - House |
15177 S Markley Rd |
|
Danville |
IL |
61,834 |
Vermilion |
15177 S Markley Rd |
|
Danville |
IL |
61834 |
Vermilion |
217-497-9382 |
|
N |
04/22/2023 |
08/27/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
21 |
|
|
1 |
|
1 |
|
|
2 |
42 |
14 |
|
18.48 |
22.26 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
Permit not required.
5/19 Ameren requested new one line. Sent to Mike. ET
6/8 Sent revised one line to Ameren. ET
6/8 Ameren approved interconnection. ET |
Ameren Acct# 5107713015
Ameren DER-20116 |
04/20/2023 07:07 PM |
2,865 |
Edit |
06/13/2024 |
Ericka Tyler |
Mark Luedke |
04/20/2023 |
Patten Hospitality |
Patten Hospitality |
255 Heritage Trace |
|
Danville |
IL |
61,834 |
Vermilion |
616 8th Ave |
|
Hoopeston |
IL |
60942 |
Vermilion |
217-474-6384 |
|
N |
04/26/2023 |
08/29/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
18 |
|
|
2 |
|
|
|
|
2 |
36 |
12 |
|
15.84 |
19.08 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
Apartment complex. Prevailing wages apply.No other mailing address given. LLNo permit required.5/19 Ameren needs new one line. Sent to Mike. ET6/8 Submitted revised one line to Ameren. ET6/8 Ameren interconnection approved. ET7/12 Had to create drawings and submit to the City of Hoopeston, IL.7/22 City of Hoopeston is now writing an ordinance for solar and will get back to us as to what else is needed for permitting. ET8/21 Spoke with Tom Bookwalter through email. He states that the City has still not created an ordinance for solar so he is giving us permission to proceed with construction. He wants notified when we are going to be there. ET |
Ameren Acct# 126010092Ameren DER-20120 |
04/20/2023 08:42 PM |
2,866 |
Edit |
12/01/2023 |
Ericka Tyler |
Gary Rosen |
04/21/2023 |
Leanna Stechmesser |
Leanna Stechmesser |
4351 KK Road |
|
Waterloo |
IL |
62,298 |
Monroe |
4351 KK Road |
|
Waterloo |
IL |
62298 |
Monroe |
618-304-2546 |
|
N |
04/28/2023 |
09/07/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 & DS3-L |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
|
10.00 |
12.72 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
5/30 Ameren approved interconnection. ET
CW – waiting to submit permit – need deed. Email from gary saying she’s working on it 7/19; sent email to Gary b/c still no deed as of 7/26
8/9 Submitted County permit. ET |
5/4 Ameren interconnection submitted (DER-20409). ET |
04/21/2023 03:03 PM |
2,867 |
Edit |
12/15/2023 |
Ericka Tyler |
Mark Luedke |
04/24/2023 |
Shanell Inc. - Steve Diveley |
Shanell Inc |
|
|
|
|
|
|
12164 E 2300 N Rd, Lot B |
|
Danville |
IL |
61834 |
Vermilion |
217-304-0208 |
|
N |
04/26/2023 |
09/06/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
9 |
|
|
1 |
|
|
|
|
1 |
18 |
6 |
|
7.92 |
9.54 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
Verifying proposed site location with Vermilion County Supervisor of Assessments office. Survey was given and is good to move foward.
8/2 customer waiting on grant application. LL
9/21 Ameren construction deadline 11/19/23.
10/24 Asked for an extension on construction deadline. Granted extension until 5/23/24. |
5/23 Resubmittted one-line diagram for Ameren interconnection application. (DER-20144) ET
5/24 Ameren approved construction. ET |
04/24/2023 03:17 PM |
2,868 |
Edit |
07/28/2023 |
Laura Lewis |
Mark Luedke |
04/24/2023 |
Don Archer & Barbara Delanois |
Barbara Delanois |
9402 East 2045 North Road |
|
Oakwood |
IL |
61,858 |
Vermilion |
9402 East 2045 North Road |
|
Oakwood |
IL |
61858 |
Vermilion |
217-474-5256 |
|
N |
04/28/2023 |
09/11/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
24 |
0 |
0 |
0 |
0 |
2 |
0 |
0 |
2 |
48 |
16 |
132 |
21.12 |
25.44 |
Ameren Illinois |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
N |
Y |
N |
N |
Y |
Barbara is the contact on customer Ameren utility bill. Don’s email is [email protected] for backup comms. Acct# 6251295007 Meter#72716579. The customer file is listed under Barbara Delanois’ name.
5/30 Ameren approved interconnection. ET |
5/4 Ameren interconnection submitted (DER-20413). ET |
04/24/2023 08:05 PM |
2,869 |
Edit |
08/07/2023 |
Laura Lewis |
Mark Luedke |
04/24/2023 |
Dale and Donna Brooks |
Donna Brooks |
6693 North 1250 East Road |
|
Georgetown |
IL |
61,846 |
Vermilion |
6693 North 1250 East Road |
|
Georgetown |
IL |
61846 |
Vermilion |
217-260-0403 |
|
N |
04/28/2023 |
09/18/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
18 |
0 |
0 |
2 |
0 |
0 |
0 |
0 |
2 |
36 |
12 |
134 |
15.84 |
19.08 |
Ameren Illinois |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
New Customer! Ready for contracts to be generated.
5/30 Ameren approved interconnection. ET |
Tie in goes back to the generator transfer switch located on the NE corner of the house, 100 amp fused disconnect located adjacent to the tie in point. Ameren Acct#9657887694. Mark says he’ll get the meter number.
5/4 Ameren interconnection submitted (DER-20412). ET |
04/24/2023 08:42 PM |
2,870 |
Edit |
09/21/2023 |
Laura Lewis |
Mark Luedke |
04/24/2023 |
Andy and Dana Busch |
Andy Busch 5.28kW |
2397 County Road 675 E |
|
Champaign |
IL |
61,822 |
Champaign |
2397 County Road 675 E |
|
Champaign |
IL |
61822 |
Champaign |
217-778-1947 |
|
N |
05/10/2023 |
09/19/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
6 |
1 |
0 |
0 |
0 |
0 |
0 |
0 |
1 |
12 |
4 |
163 |
6.36 |
5.28 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
New Customer! Added 4/24;
6/1 Ameren approved interconnection. ET |
5/15 Ameren interconnection application submitted (DER-20800). ET |
04/24/2023 09:02 PM |
2,871 |
Edit |
08/07/2023 |
Laura Lewis |
Mark Luedke |
04/24/2023 |
John Bruns |
John Bruns |
1743 East 500 North Road |
|
Cissna Park |
IL |
60,924 |
Iriquois |
1743 East 500 North Road |
|
Cissna Park |
IL |
60924 |
Iriquois |
815-383-1474 |
|
N |
05/03/2023 |
09/20/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
24 |
0 |
0 |
0 |
0 |
2 |
0 |
0 |
2 |
48 |
16 |
110 |
21.12 |
25.44 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
N |
Y |
N |
N |
Y |
6/1 Ameren approved interconnection. ET |
acct#3679031216 meter#72773028, stacked arrays (north and south). Located on south side of shed. Tie in wire will go back to the house meter on north side of house. 100 amp fused solar disconnect beside meter. |
04/24/2023 09:09 PM |
2,872 |
Edit |
10/02/2023 |
Ericka Tyler |
Mark Luedke |
05/01/2023 |
Dan Sodam |
Dan Sodam |
6038 State Route 3 |
|
Waterloo |
IL |
62,298 |
Monroe |
6038 State Route 3 |
|
Waterloo |
IL |
62298 |
Monroe |
618-304-7271 |
|
N |
05/03/2023 |
09/27/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
|
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
|
10.00 |
12.72 |
Monroe Co Electric Co-Op |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
60AMP fused disconnect on the array, tie in goes to a 200AMP breaker box inside the shop. Array is shown as approximate (not to scale) on rough site drawing. Monroe County Co-Op acct #326008.
CW Permit started, need deed and FD approval. Rest of docs uploaded 7/26 |
5/11 Interconnection app sent to Monroe County Electric Co-Operative. ET
5/23 Sent a new one line diagram to Monroe County per their request. ET |
05/01/2023 07:01 PM |
2,873 |
Edit |
10/13/2023 |
Laura Lewis |
Mark Luedke |
05/01/2023 |
Michael Beaird II |
Michael Beaird Jr. |
1073 CR 1200 E |
|
Tolono |
IL |
61,880 |
Champaign |
1073 CR 1200 E |
|
Tolono |
IL |
61880 |
Champaign |
217-417-5498 |
|
N |
05/02/2023 |
09/20/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
(7)DS3 / (5)DS3L |
12 |
0 |
0 |
0 |
0 |
1 |
0 |
0 |
1 |
24 |
8 |
160 |
10.00 |
12.72 |
Ameren Illinois |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
Michael Beaird’s son. 5/15 Ameren interconnection application submitted (DER-20801). ET 5/31 Transformer upgrade needed. ET
6/15 Ameren approved. ET
CW Permit submitted 7/25
8/1 Building permit approved. Village of Savoy will need 24-48hrs notice prior to construction. ET
9/19 Called Orie Turnbill to let him know that the crews would be onsite to construct on 9/22. ET
10/13 Need to call Orie Turnbill once electrical is done ET |
|
05/01/2023 09:31 PM |
2,875 |
Edit |
08/16/2023 |
Jim Straeter |
Jerry Klopfenstein |
05/04/2023 |
Leon Klopfenstein |
|
10136 Road 60 |
|
Haviland |
OH |
45,851 |
Dekalb/Stueben |
10136 Road 60 |
|
Haviland |
OH |
45851 |
Paulding |
415-786-0060 |
|
N |
05/03/2023 |
07/01/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
QT2 480 |
30 |
|
|
|
|
5 |
|
|
5 |
120 |
40 |
100 |
54.00 |
63.60 |
AEP |
|
|
|
|
Finalize |
Y |
N |
Y |
S |
Y |
X |
N |
Y |
N |
N |
N |
Customer is in the middle of getting a three phase service. AEP Still shows him on single phase
CW-per Mike’s call with AEP it has been approved
CW Grant info: The application for Leon Ray Klopfenstein was received on June 15, 2023. We always encourage the applicant to not incur costs or start construction until the environmental review is completed. If the applicant starts construction or incurs costs prior to the completion of the environmental review, they would be at risk that the project may or may not receive the funding requested. The environmental review process will not begin until after the June 30, 2023 deadline for receiving applications and usually takes at least 30-45 days. |
|
05/04/2023 11:22 AM |
2,876 |
Edit |
10/31/2023 |
Laura Lewis |
Mark Luedke |
05/04/2023 |
Stein Excavating LLC |
Stein Excavating LLC |
1338 Mud Creek Road |
|
Marissa |
IL |
62,257 |
St Clair |
1338 Mud Creek Road |
|
Marissa |
IL |
62257 |
St Clair |
618-791-8374 |
|
Y |
05/08/2023 |
09/28/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
9 |
0 |
0 |
1 |
00 |
0 |
0 |
0 |
1 |
18 |
6 |
350 |
7.92 |
9.54 |
Ameren Illinois |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
This customer is located in St. Clair County IL. Verifying we can move forward with this as Mark’s customer.
6/1 Ameren requiring transformer upgrade. ET
6/19 Ameren approved proceed with construction. ET
8/2 Sent letter to FD for approval
8/10 County permit submitted. ET
9/1 St Clair County will not issue permit at this time said that owner has an illegal business on his property that they are not zoned for. I let Doug know and he is going to call the county to get it cleared up will let us know when all is done. ET |
This system will be installed on the same parcel as Doug Stein’s house system. The IL Shines application will be combined. We’ll show CTP for this project during Part II submission.
5/15 Ameren interconnection application submitted (DER-20804). ET |
05/04/2023 03:33 PM |
2,877 |
Edit |
10/02/2023 |
Laura Lewis |
Mark Luedke |
05/04/2023 |
Doug and Angie Stein |
Doug Stein House |
1338 Mud Creek Road |
|
Marissa |
IL |
62,257 |
St Clair |
1338 Mud Creek Road |
|
Marissa |
IL |
62257 |
St Clair |
618-791-8374 |
|
N |
05/05/2023 |
09/28/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
18 |
0 |
0 |
2 |
0 |
0 |
0 |
0 |
2 |
36 |
12 |
350 |
15.84 |
19.08 |
Ameren Illinois |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
This system will be located on the same parcel as the Stein Excavating site. The IL Shines applications will be combined into one. Prevailing wages are applicable to the Excavating site system.
6/1 Ameren requiring transformer upgrade. ET
6/21 Submitted revised one line. ET
8/10 Submitted St Clair County building permit. ET |
Prevailing wages are not applicable to this site. The house meter is separate from the excavating site meter.
5/15 Ameren interconnection application submitted (DER-20802). ET |
05/04/2023 03:45 PM |
2,878 |
Edit |
09/21/2023 |
Ericka Tyler |
Mark Luedke |
05/10/2023 |
Andy and Dana Busch |
Andy Busch - House |
|
|
|
|
|
|
2397 County Road 675 East |
|
Champaign |
IL |
61822 |
Champaign |
217-778-4081 |
|
N |
05/10/2023 |
09/25/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 & DS3-L |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
|
12.72 |
10.00 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
this is the home site, customer also has 12-panel array to the east farm site
6/1 Ameren requiring transformer upgrade. ET |
5/15 Ameren interconnection application submitted DER-20799. ET |
05/10/2023 07:15 PM |
2,879 |
Edit |
12/04/2023 |
Ericka Tyler |
Mark Luedke |
05/11/2023 |
Rossville Area Fire Protection District |
Rossville Fire Department |
617 N Chicago St |
|
Rossville |
IL |
60,963 |
Vermilion |
617 N Chicago St |
|
Rossville |
IL |
60963 |
Vermilion |
217-304-2295 |
|
Y |
05/10/2023 |
10/01/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
21 |
|
|
1 |
|
1 |
|
|
2 |
42 |
14 |
|
18.48 |
22.26 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
6/28 Ameren interconnection submitted (DER-22718). ET |
|
05/11/2023 01:03 PM |
2,881 |
Edit |
09/22/2023 |
Laura Lewis |
Curt Dambman |
05/12/2023 |
John Newcomer - Home |
John Newcomer - Home |
21668 Townline Road |
|
Lanark |
IL |
61,046 |
Carroll |
21668 Townline Road |
|
Lanark |
IL |
61046 |
Carroll |
815-716-0542 |
|
N |
05/10/2023 |
10/04/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
12 |
2 |
0 |
0 |
0 |
0 |
0 |
0 |
2 |
24 |
8 |
250 |
10.56 |
12.70 |
Jo-Carroll Energy |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
This customer has two systems. This one is for the residence which is tax exempt due to managing farm out of home office.
CW – need COI |
This system is for the residence and is located close enough to the house to use wifi. May need a booster. cell modem was not quoted. |
05/12/2023 01:47 PM |
2,882 |
Edit |
12/04/2023 |
Laura Lewis |
Curt Dambman |
05/12/2023 |
John Newcomer - Confinements |
John Newcomer - Confinements |
21668 Townline Road |
|
Lanark |
IL |
61,046 |
Carroll |
21470 Cyclone Ridge Road |
|
Mount Carroll |
IL |
61053 |
Carroll |
815-716-0542 |
|
Y |
05/10/2023 |
10/03/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3-L |
24 |
0 |
0 |
0 |
0 |
2 |
0 |
0 |
2 |
48 |
16 |
250 |
18.43 |
25.44 |
Jo-Carroll Energy |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
This solar system serves a hog barn. Prevailing wages are applicable. Obtain tax exempt form from customers.
8/15 Interconnection sent to Jo-Carroll Energy. ET |
Prevailing wages applied. Need CTP for Part II submission. EKM and cell modem included in quoted price. |
05/12/2023 01:58 PM |
|
|
|
|
|
|
Alan Elder |
|
PO Box 202 |
|
Hennig |
Illinois |
61,848 |
Perry |
7028 Aster Road |
|
Coulterville |
Illinois |
62237 |
Perry |
217-274-2357 |
|
|
|
|
Heliene |
144HC M10 Bifacial 530 |
AP Systems |
16 DS3 17 DS3L |
|
|
|
2 |
|
2 |
|
|
|
|
|
|
248.32 |
31.80 |
Ameren |
|
|
|
|
Draft |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Alan Elder |
|
PO Box 202 |
|
Hennig |
Illinois |
61,848 |
Perry |
7028 Aster Road |
|
Coulterville |
Illinois |
62237 |
Perry |
217-274-2357 |
|
|
|
|
Heliene |
144HC M10 Bifacial 530 |
AP Systems |
16 DS3 17 DS3L |
|
|
|
2 |
|
2 |
|
|
|
|
|
|
248.32 |
31.80 |
Ameren |
|
|
|
|
Draft |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Alan Elder |
|
PO Box 202 |
|
Hennig |
Illinois |
61,848 |
Perry |
7028 Aster Road |
|
Coulterville |
Illinois |
62237 |
Perry |
217-274-2357 |
|
|
|
|
Heliene |
144HC M10 Bifacial 530 |
AP Systems |
16 DS3 17 DS3L |
|
|
|
2 |
|
2 |
|
|
|
|
|
|
248.32 |
31.80 |
Ameren |
|
|
|
|
Draft |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2,883 |
Edit |
11/27/2023 |
Laura Lewis |
Mark Luedke |
05/16/2023 |
Ezell Excavating Inc |
Hunter Ezell |
1801 E County Road 1450 North |
|
Villa Grove |
IL |
61,956 |
Douglas |
1801 E County Road 1450 North |
|
Villa Grove |
IL |
61956 |
Douglas |
217-369-5203 |
|
N |
06/27/2023 |
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
18 |
0 |
0 |
2 |
0 |
0 |
0 |
0 |
2 |
36 |
12 |
162 |
15.84 |
19.08 |
Ameren Illinois |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
CW We don’t hand out solar permits so if anyone has complaints they can call me anytime at the number below. Just let me know when they plan to start install . Please send pictures of installed system. 7/27
Michael Broeker
Building Inspector
City of Villa Grove
Cell – 217-714-9188
8/10 Just to clarify a building permit was filed and approved with Michael and the City of Villa Grove. They do not send any type of permit it is all just verbal which was done on the phone with Michael and myself today. He does ask that we notify him prior to construction and then send pictures of the completed project when done. ET |
|
05/16/2023 01:59 PM |
2,884 |
Edit |
03/14/2024 |
Laura Lewis |
Mark Luedke |
05/16/2023 |
Andy Kim |
Andy Kim |
1075 Co Rd 1200 E |
|
Tolono |
IL |
61,880 |
Champaign |
1075 Co Rd 1200 E |
|
Tolono |
IL |
61880 |
Champaign |
443-931-2491 |
|
N |
07/12/2023 |
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
(16)DS3/(14)DS3L |
30 |
0 |
0 |
2 |
0 |
1 |
0 |
0 |
3 |
60 |
20 |
162 |
24.83 |
31.80 |
Ameren Illinois |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
Customer ready for solar contracts to sign.
6/15 Sent SDF, SCA and BOS to customer for signature. ET
7/26 Submitted Ameren interconnection (DER-24113) and Champaign County permit. ET
7/27 Had to resubmit permit to Village of Savoy. ET
8/1 Village of Savoy has approved building permit. Need 24-48hrs notice prior to construction, contact Orie Turnbull. ET |
|
05/16/2023 02:16 PM |
2,790 |
Edit |
08/16/2023 |
Jesse Straeter |
Jim Straeter |
04/08/2023 |
Kevin Lippelt |
Kevin Lippelt daughter TUNIS |
|
|
|
|
|
|
7246 N 575 W |
|
Winamac |
IN |
46966 |
Pulaski |
|
|
N |
|
|
Heliene |
144M-530-HC-M10-BF-SL |
|
|
|
1 |
|
|
|
|
|
|
1 |
12 |
4 |
34 |
|
|
|
|
|
|
|
Cold |
N |
N |
N |
Y |
Y |
X |
N |
N |
N |
N |
N |
|
Permits marked Y on spreadsheet with a date of 8/23 |
04/10/2023 01:53 AM |
2,885 |
Edit |
10/02/2023 |
Christine Walsh |
Justin Detmer |
06/02/2023 |
Charles and Marian Cooley |
|
20616 Boulder Road |
|
Shattuc |
IL |
62,231 |
Clinton |
20616 Boulder Road |
|
Shattuc |
IL |
62231 |
Clinton |
618-541-0631 |
|
N |
05/08/2023 |
06/18/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
291 |
10.56 |
12.72 |
Clinton County Electric Coop |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
CW – customer said he needs to work through snail mail and will send COI out, as of 7/10 have not received anything. send Justin email 7/10 & 7/26
CW Co said OK to send in docs I have and they will hold until we get utility approval 7/27
Chuck took COI to utility. Ahren is out until 8/7. Need him to confirm he has everything and approve interconnection.
8/8 Sent email to Kay Thole at Clinton County with utility approval. She is out of the office until 8/14. ET |
See revised one line for specific details requested by utility. |
06/02/2023 01:01 AM |
2,886 |
Edit |
08/25/2023 |
Christine Walsh |
Mark Luedke |
06/02/2023 |
John Clamors - DON'T USE THIS ONE DUPLICATE |
|
5267 State Route 156 |
|
Waterloo |
IL |
62,298 |
Monroe |
|
|
|
|
|
|
618-719-5114 |
|
N |
03/27/2023 |
07/04/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 & DS3L |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
359 |
10.00 |
12.72 |
MCEC |
|
|
|
|
Finalize |
Y |
N |
Y |
S |
Y |
Y |
N |
Y |
N |
N |
Y |
Monroe Co said needs to be 50′ from front line & requires snow/wind info |
|
06/02/2023 01:22 PM |
2,887 |
Edit |
07/20/2023 |
Doug Smith |
Doug Smith |
06/03/2023 |
Robert Walker |
Walker |
2235 County Road 39 |
|
Waterloo |
IN |
46,973 |
Dekalb/Stueben |
290 W |
|
Waterloo |
IN |
46793 |
Dekalb/Stueben |
|
260-837-7268 |
N |
|
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
9 |
|
|
1 |
|
|
|
|
1 |
18 |
6 |
90 |
7.92 |
9.54 |
NIPSCO |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
X |
N |
Y |
N |
N |
N |
CW – utility permit approved 7/5; Need health dept approval for Co – sent waiver 6/30 |
|
06/03/2023 01:57 PM |
2,888 |
Edit |
06/08/2023 |
Ericka Tyler |
Jim Straeter |
06/08/2023 |
Christopher Koester |
Christopher Koester |
6972 White Swan Lane |
|
Red Bud |
IL |
62,278 |
Randolph |
6972 White Swan Lane |
|
Red Bud |
|
|
|
317-740-3635 |
|
N |
|
01/19/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
Enphase |
IQ8H |
24 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
|
9.22 |
12.72 |
Egyptian Electric Cooperative Association |
|
|
|
|
Finalize |
Y |
N |
N |
Y |
Y |
Y |
N |
Y |
Y |
N |
Y |
Matt Cowell – MC Electric is Salesperson |
|
06/08/2023 08:05 PM |
2,889 |
Edit |
07/11/2023 |
Christine Walsh |
Jim Straeter |
06/12/2023 |
Dale Overmyer |
Dale Overmyer |
6410 N 150 W |
|
Rochester |
IN |
46,975 |
Fulton |
4620 W 700 N |
|
Rochester |
IN |
46975 |
Fulton |
574-298-3948 |
574-223-6621 |
N |
06/29/2023 |
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
|
10.56 |
12.72 |
Fulton County REMC |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
X |
Y |
Y |
N |
N |
N |
Has a grant.
6/27 Jim obtained Fulton County building permit. ET
6/28 Still waiting on customer signature for interconnection with REMC. ET
6/29 Submitted REMC interconnection and got approval same day. ET |
|
06/12/2023 02:51 PM |
2,893 |
Edit |
06/21/2023 |
Christine Walsh |
Mark Luedke |
06/15/2023 |
Julie Catlett |
|
3322 E 800 N Rd |
|
Fairmount |
IL |
61,841 |
Vermilion |
3322 E 800 N Rd |
|
Fairmount |
IL |
61841 |
Vermilion |
2174749405 |
|
N |
09/09/2022 |
|
|
|
|
|
|
|
|
|
|
1 |
|
|
1 |
24 |
8 |
|
|
|
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
N |
Y |
|
|
06/15/2023 01:35 PM |
2,896 |
Edit |
02/07/2024 |
Ericka Tyler |
Jim Straeter |
06/19/2023 |
New Holland Rossville Inc |
New Holland Rossville Inc |
PO Box 577, 3340 W St Rd 26 |
|
Rossville |
IN |
46,065 |
Clinton |
PO Box 577, 3340 W St Rd 26 |
|
Rossville |
IN |
46065 |
Clinton |
765-379-3331 |
|
N |
|
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
54 |
1 |
|
|
|
4 |
|
|
5 |
108 |
36 |
|
47.52 |
57.24 |
Duke |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
X |
Y |
Y |
N |
N |
N |
6/19 Started Duke interconnection application. Had to have name changed on account from Rodkey Brothers Inc to New Holland Rossville Inc. New acct# 910146919742. ET
7/3 Waiting on one-line diagram and COI. Notified Jim. ET
8/3 Called Samantha Ruckel with Clinton County IN plan commission for an update on building permit. Had to leave a message. ET
8/10 County permit approved still waiting on interconnection from Duke. ET
8/28 Duke wants to have transformer upgrade. Jim is aware and is working on this. ET |
|
06/19/2023 07:31 PM |
2,898 |
Edit |
09/12/2023 |
Ericka Tyler |
Jim Straeter |
06/22/2023 |
Clauson Farms |
Clauson Farms |
741 N 400 E |
|
Rochester |
IN |
46,975 |
Fulton |
787 W 50 N |
|
Rocheser |
IN |
46975 |
Fulton |
574-835-1248 |
|
N |
06/27/2023 |
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
QT2 208 |
60 |
|
|
|
|
3 |
|
|
3 |
72 |
24 |
|
28.80 |
31.80 |
Fulton County REMC |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
X |
Y |
Y |
N |
N |
N |
6/22 Submitted interconnection to FCREMC. Submitting paperwork to WVPA. ET
6/27 Jim obtained Fulton County building permit. ET
6/28 Paperwork submitted to WVPA for PPA. ET
7/10 Clausons have decided to upgrade system to 3-24arrays. Will have to do revise all paperwork once Jim has made corrections to BOS and Quote. ET
Need a variance from Fulton County BZA hearing on 8/9 |
|
06/22/2023 06:32 PM |
2,899 |
Edit |
11/29/2023 |
Ericka Tyler |
Jim Straeter |
07/03/2023 |
New Holland Richmond Inc |
|
1260 E 100 S |
|
Rochester |
IN |
46,975 |
|
3100 Industries Rd |
|
Richmond |
IN |
47374 |
Wayne |
765-962-7724 |
|
N |
|
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
54 |
1 |
|
|
|
4 |
|
|
5 |
108 |
36 |
|
47.52 |
57.24 |
Richmond Power & Light Company |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
X |
Y |
Y |
Y |
N |
N |
9/14 Talked with Christine Sittloh at the City of Richmond to verify all permits were good to move forward with construction. Electrician has to go in and get electrical permit, they have to be licensed with the City of Richmond. ET |
Richmond Power & Light Company will be the utility. There will be a PPA with Indiana Municipal Power Agency. |
07/03/2023 03:54 PM |
2,900 |
Edit |
02/16/2024 |
Christine Walsh |
Doug Smith |
07/07/2023 |
Mitch Aschliman K and K Swine Farms |
|
7119 E 100 N |
|
Craigville |
IN |
46,731 |
Wells |
|
|
|
|
|
|
260-273-0303 |
|
N |
06/09/2023 |
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
132 |
|
|
|
|
11 |
|
|
11 |
264 |
88 |
73 |
116.16 |
139.92 |
AEP |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
X |
Y |
Y |
N |
N |
Y |
CW – permit approved
8/8 had to revise AEP interconnection application. ET
10/11 AEP pushed install date to 6/1/24 per Doug’s request.
12/21 AEP requiring transformer upgrade. Customer agreed to upgrade. |
|
07/07/2023 06:17 PM |
2,901 |
Edit |
04/23/2024 |
Christine Walsh |
Jim Straeter |
07/07/2023 |
New Holland Logansport |
|
|
|
|
|
|
|
|
|
|
|
|
|
5748350351 |
574-753-6291 |
N |
|
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
42 |
1 |
|
|
|
3 |
|
|
4 |
84 |
28 |
|
36.96 |
44.52 |
|
|
|
|
|
Finalize |
Y |
N |
N |
Y |
Y |
X |
N |
Y |
N |
N |
N |
CW- Permit sent in but needed utility acknowledgement. Sent to City 7/10
8/3 Contacted Jamey Harper, zoning admin, at 574-753-7775 for an update they stated that the permit has been sent to the building commission in the City. LM for the building commissioner to call back with an update. Logansport utilities does not require an interconnection permit.
3/13/24 – Called Logansport building commissioner for final inspection. |
|
07/07/2023 08:11 PM |
2,902 |
Edit |
01/16/2024 |
Laura Lewis |
Curt Dambman |
07/10/2023 |
Robert Tekampe |
Tekampe - Gold Mine Rd |
12896 Gold Mine Road |
|
Shannon-Forreston |
IL |
61,078 |
Carroll |
12896 Gold Mine Road |
|
Shannon-Forreston |
IL |
61078 |
Carroll |
815-266-4840 |
|
N |
|
11/02/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
(7)DS3 & (5)DS3-L |
12 |
0 |
0 |
0 |
0 |
1 |
0 |
0 |
1 |
24 |
8 |
240 |
10.00 |
12.72 |
ComEd |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
7/10 sent customer contracts to sign. Robert Tekampe is a repeat customer.
7/19 Submitted interconnection to Comed. ET |
7/10 waiting on signed contracts to start interconnection and permit. |
07/10/2023 03:56 PM |
2,903 |
Edit |
12/06/2023 |
Ericka Tyler |
Doug Smith |
07/10/2023 |
Donald and Velma Goupil |
Donald Goupil |
14126 State Highway 1 |
|
Robinson |
IL |
62,454 |
Crawford |
14126 State Highway 1 |
|
Robinson |
IL |
62454 |
Crawford |
618-421-3994 |
|
N |
06/26/2023 |
10/23/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
15 |
1 |
|
1 |
|
|
|
|
2 |
30 |
10 |
206 |
13.20 |
15.90 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
7/24 Ameren interconnection submitted (DER-23975). ET
There is currently no zoning in Crawford County no building permit needed.
12/6 – Interconnection submitted (Construction complete) |
|
07/10/2023 05:34 PM |
2,904 |
Edit |
02/24/2024 |
Ericka Tyler |
Gary Rosen |
07/10/2023 |
American Legion Mondt Lampe Post 1239 |
Aviston American Legion |
601 S Clinton St |
|
Aviston |
IL |
62,216 |
Clinton |
601 S Clinton St |
|
Aviston |
IL |
622166 |
Clinton |
618-541-8104 |
|
Y |
07/12/2023 |
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
QT2 - 240V 3 Phase |
39 |
1 |
|
|
|
6 |
|
|
7 |
156 |
52 |
|
67.39 |
82.68 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
7/10 Gary is checking on the sales tax. Jim has put in BOS that sales tax is exempt, but Gary is not sure that it is. Hold off until we hear back from Gary. ET
7/11 Gary found that the Legion is not tax exempt, so the quote and BOS was revised to show sales tax. Submitted SDF, BOS and SCA for customer signature. ET
7/24 Submitted Ameren interconnection (DER-23969). Still waiting to hear back from Village of Aviston on zoning/building permitting. Have called and left a message three times. ET
7/25 Gary said project on hold until we find out if Ameren will approve interconnection. If too much more cost involved with variance and interconnection, they may scarp whole deal. ET
10/3 Village of Aviston approved variance for project. Waiting for official permit from Village. ET |
|
07/10/2023 06:41 PM |
2,905 |
Edit |
09/12/2023 |
Christine Walsh |
Doug Smith |
07/10/2023 |
Brian Goss |
|
2550 S Paxton Dr |
|
Warsaw |
IN |
46,580 |
Kosciusko |
2550 S Paxton Dr |
|
Warsaw |
IN |
46580 |
Kosciusko |
574-835-4400 |
|
N |
06/29/2023 |
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
1 |
|
|
1 |
|
|
|
|
1 |
18 |
6 |
|
15.84 |
19.08 |
NIPSCO |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
X |
Y |
Y |
N |
N |
Y |
|
|
07/10/2023 08:14 PM |
2,906 |
Edit |
11/10/2023 |
Ericka Tyler |
Justin Detmer |
07/10/2023 |
Justin Detmer - New Home |
Justin Detmer - New Home |
6100 Iberg Rd |
|
Higland |
IL |
62,249 |
Clinton |
6100 Iberg Rd |
|
Highland |
IL |
62249 |
Clinton |
618-292-9940 |
|
N |
06/30/2023 |
10/30/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
24 |
|
|
|
|
2 |
|
|
2 |
48 |
16 |
|
21.12 |
25.44 |
Clinton Co Electric Coop |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
7/18 Justin is combining his two parcels now so that he will not have as large of a setback. Will let us know when this is done so we can continue with County permit process. ET |
9/5 Clinton Co Coop is requesting more info on one-line. Sent email to Mike and Jim. ET
9/19 Sent second email to Mike and Jim about one-line for project. ET |
07/10/2023 08:23 PM |
2,907 |
Edit |
03/13/2024 |
Ericka Tyler |
Curt Dambman |
07/11/2023 |
Terry & Christine Charles |
Terry Charles |
19431 Elizabeth Road |
|
Mount Carroll |
IL |
61,053 |
Carroll |
19431 Elizabeth Road |
|
Mount Carroll |
IL |
61053 |
Carroll |
815-541-2285 |
|
N |
07/26/2023 |
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 & DS3-L |
24 |
|
|
|
|
2 |
|
|
2 |
48 |
16 |
|
19.55 |
25.44 |
Jo-Carroll Energy |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
8/9 waiting for customer signature for utility. ET
8/15 Interconnection sent to Jo-Carroll Energy. ET |
|
07/11/2023 08:43 PM |
2,908 |
Edit |
05/16/2024 |
Ericka Tyler |
Doug Smith |
07/18/2023 |
Steven Clark |
|
3229 N 2300th St |
|
Oblong |
IL |
62,449 |
Crawford |
3229 N 2300th St |
|
Oblong |
IL |
62449 |
Crawford |
618-562-4086 |
|
N |
07/25/2023 |
12/19/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 & DS3-L |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
223 |
10.00 |
12.72 |
Norris Electric Cooperative |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Crawford County currently has no zoning 7/2023
9/12 Need to call Norris Electric for inspection once installed. ET |
|
07/18/2023 05:53 PM |
2,909 |
Edit |
11/10/2023 |
Ericka Tyler |
Doug Smith |
07/18/2023 |
Dana and Judy Jolley - Home |
Jolley Home |
4347 E 1490 North Rd |
|
Fithian |
IL |
61,844 |
|
14720 N 400 E |
|
Fairmount |
IL |
61841 |
Vermilion |
217-474-3780 |
|
N |
07/25/2023 |
12/20/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
15 |
1 |
|
1 |
|
|
|
|
2 |
30 |
10 |
135 |
13.20 |
15.90 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
7/31 – Submitted Ameren interconnection app (DER-24320). Project is in Vermillion County no building/zoning permit needed. ET |
Ameren service address listed on Solar Contract Agreement as site address. Mailing address works best. |
07/18/2023 06:35 PM |
2,910 |
Edit |
10/31/2023 |
Ericka Tyler |
Gary Rosen |
07/21/2023 |
Brian and Chelsea Simonton |
|
16595 Post Oak Rd |
|
Carlyle |
IL |
62,231 |
Clinton |
16595 Post Oak Rd |
|
Carlyle |
IL |
62231 |
Clinton |
618-973-3055 |
|
N |
08/01/2023 |
12/26/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
24 |
|
|
|
|
2 |
|
|
2 |
48 |
16 |
306 |
21.12 |
25.44 |
Ameren Illinois |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
8/7 Need more info from Gary about site plan, where AC Disconnect is going and if utility meter or H Panel on pole. ET
8/8 Sent letter to Carlyle FD for approval. County permit and interconnection started, need one line diagram sent to Doug. ET
8/9 Ameren interconnection submitted (DER-24757). Have to wait for FD approval and Interconnection to come back prior to submitting county permit. ET
8/17 Sent county permit to customer for signature. ET
9/12 Called customer to remind them need county permit signed to move forward with process. ET |
|
07/21/2023 06:50 PM |
2,911 |
Edit |
10/12/2023 |
Ericka Tyler |
Mark Luedke |
07/21/2023 |
Dave Volk |
|
402 Kentucky St |
|
Hindsboro |
IL |
61,930 |
Douglas |
402 Kentucky St |
|
Hindsboro |
IL |
61930 |
Douglas |
217-276-0565 |
|
N |
|
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 & DS3-L |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
|
10.00 |
12.72 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
Ameren acct# 2145170229, meter# 72521740
7/27 sent SDF, BOS and SCA for customer signature. ET
8/18 This property is in the Village of Hindsboro. Have left a message to get info on building permits. Started interconnection app need one-line. ET
8/21 Ameren interconnection submitted (DER-25301). ET
9/1 John Olinger from the Village of Hindsboro called and stated the have no regulations or permits for ground mounted solar in their area. He said as long as it’s not blocking any roads or alleys and not crossing property lines they are fine with it. Sent him a site plan to show the Village Board so everyone was aware but we are good to construct. ET |
|
07/21/2023 07:15 PM |
2,912 |
Edit |
01/23/2024 |
Ericka Tyler |
Mark Luedke |
07/21/2023 |
AJ Sprague |
|
1328 N 2185th Ave |
|
Beason |
IL |
62,512 |
|
1328 N 2185th Ave |
|
Beason |
IL |
62512 |
Logan |
815-826-0432 |
|
N |
07/31/2023 |
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 & DS3-L |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
|
10.00 |
12.72 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
N |
Y |
N |
N |
Y |
Ameren acct# 4991949297, meter# 723187117/27 sent SDF, SCA and BOS to customer to sign. ET8/18 Confirming with Mark the site address. County info says 1326 if it is we will need to redo paperwork. ET8/21 Ameren interconnection submitted (DER-25296). ET12/13 – CALLED IN LOCATE FOR 12/15 AT 11:15 – A233470727 approved. |
|
07/21/2023 07:57 PM |
2,913 |
Edit |
10/02/2023 |
Ericka Tyler |
Gary Rosen |
07/24/2023 |
James Jansen |
|
5309 Court Rd |
|
Germantown |
IL |
62,245 |
Clinton |
5309 Court Rd |
|
Germantown |
IL |
62245 |
Clinton |
618-420-8262 |
|
N |
07/31/2023 |
12/27/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
18 |
|
|
2 |
|
|
|
|
2 |
36 |
12 |
320 |
15.84 |
19.08 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
8/9 Need Ameren Acct# from Gary. Sent Email. ET
8/10 Submitted Ameren interconnection (DER-24828). ET
8/17 Clinton County requires FD approval and utility approval prior to submitting permit. Have sent out for both approvals. County permit and drawings ready to go sent permit to customer for signature. ET
9/6 Submitted FD approval and utility approval to Clinton County. ET |
|
07/24/2023 05:57 PM |
2,914 |
Edit |
12/01/2023 |
Ericka Tyler |
Gary Rosen |
07/24/2023 |
Milton Sauer Jr. |
|
6044 State Rt 3 |
|
Waterloo |
IL |
62,298 |
Monroe |
6044 State Rt 3 |
|
Waterloo |
IL |
62298 |
Monroe |
618-939-8876 |
|
N |
08/02/2023 |
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
21 |
|
|
1 |
|
1 |
|
|
2 |
42 |
14 |
|
18.48 |
22.26 |
Monroe Co Electric Co-Op |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
8/25 Interconnection app submitted. Fire department approval received. Monroe County building permit started just need utility approval to submit. ET
9/25 Sent f/u message to Keith Jones with Monroe Co Electric for interconnection update. ET |
|
07/24/2023 06:08 PM |
2,915 |
Edit |
07/28/2023 |
Ericka Tyler |
Mark Luedke |
07/24/2023 |
Lee and Michelle Reifsteck |
|
726 CR 1000 N |
|
Tolono |
IL |
61,880 |
Champaign |
726 CR 1000 N |
|
Tolono |
IL |
61880 |
Champaign |
217-841-0985 |
|
N |
|
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
21 |
|
|
1 |
|
1 |
|
|
2 |
42 |
14 |
|
18.48 |
22.26 |
Ameren |
|
|
|
|
Cold |
N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
Y |
7/12 New customer. Ameren Acct# 8835036615, Meter# 72532084
7/28 Mark stated customer is not moving forward at this time. ET |
|
07/24/2023 06:47 PM |
2,916 |
Edit |
02/14/2024 |
Ericka Tyler |
Mark Luedke |
07/24/2023 |
Kenton Carley - Farm Site |
|
1649 E 1300 N |
|
Milford |
IL |
60,953 |
|
1798 E 1300 N |
|
Milford |
IL |
60953 |
Iriquois |
815-867-6150 |
|
N |
|
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
36 |
|
|
|
|
3 |
|
|
3 |
72 |
24 |
|
31.68 |
38.16 |
Eastern Illini Coop |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
7/12 New customer. Eastern Illini Co-Op.
8/18 Sent out SDF, BOS and SCA for customer signature. ET
9/11 Interconnection application ready to submit need acct # from Mark and customer signature. ET
9/14 Sent interconnection to customer for signature. ET
12/13 – LOCATE SCHEDULED FOR 12/15 – Cleared (A233471377) |
|
07/24/2023 07:23 PM |
2,917 |
Edit |
02/07/2024 |
Ericka Tyler |
Mark Luedke |
07/24/2023 |
Gregory Groves |
|
1234 1525 E |
|
Toledo |
IL |
62,468 |
Cumberland |
1234 1525 E |
|
Toledo |
IL |
62468 |
Cumberland |
217-232-1404 |
|
N |
|
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 & DS3-L |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
|
10.00 |
12.72 |
Coles-Moultrie Electric Coop |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
9/26 sent interconnection for signature.
10/6 interconnection submitted.
11/10 sent follow up email to Coles Moultrie for update on interconnection.
11/16 – Let Coles Moultrie know after install and eclectically wired. |
|
07/24/2023 07:31 PM |
2,918 |
Edit |
02/16/2024 |
Ericka Tyler |
Mark Luedke |
07/24/2023 |
Rodney Ryan Vredenburgh |
|
11923 E 1750 N Rd |
|
Oakwood |
IL |
61,858 |
|
11923 E 1750 N Rd |
|
Oakwood |
IL |
61858 |
Vermilion |
217-304-4663 |
|
N |
08/08/2023 |
01/10/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 & DS3-L |
30 |
|
|
2 |
|
1 |
|
|
3 |
60 |
20 |
|
24.83 |
31.80 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
7/13 New customer. Ameren Acct# 6040591006, Meter# 72831003.
8/9 Sent customer documents to sign. ET
8/28 Signed documents back ready to start permits. ET
9/8 Interconnection submitted. DER-26256 |
|
07/24/2023 07:41 PM |
2,919 |
Edit |
10/24/2023 |
Ericka Tyler |
Mark Luedke |
07/24/2023 |
Troy Pate |
|
13617 E 820 N Rd |
|
Georgetown |
IL |
61,846 |
|
13617 E 820 N Rd |
|
Georgetown |
IL |
61846 |
Vermilion |
217-497-8237 |
|
N |
08/28/2023 |
01/23/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
18 |
|
|
2 |
|
|
|
|
2 |
36 |
12 |
130 |
15.84 |
19.08 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
7/13 New customer. Ameren Acct# 7158270093, Meter# 72606575.
9/8 Interconnection started in need of one line. ET
9/19 Interconnection submitted DER-26722. Property in Georgetown Township no building permit needed. ET |
|
07/24/2023 08:01 PM |
2,920 |
Edit |
11/14/2023 |
Ericka Tyler |
Mark Luedke |
07/24/2023 |
Dale Stock |
|
39144 State Route 1 |
|
Hoopeston |
IL |
60,942 |
|
39144 State Route 1 |
|
Hoopeston |
IL |
60942 |
Vermilion |
217-495-0801 |
|
N |
08/18/2023 |
01/24/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
24 |
|
|
|
|
2 |
|
|
2 |
48 |
16 |
110 |
21.12 |
25.44 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
N |
Y |
N |
N |
Y |
7/13 New customer. Ameren Acct# 2639035217, Meter# 72617500.
9/22 started interconnection, need one-line diagram.
9/26 Interconnection submitted DER#27177-Paid
10/3 No building permit needed. ET
10/4 Interconnection Approved |
|
07/24/2023 08:34 PM |
2,921 |
Edit |
02/05/2024 |
Ericka Tyler |
Mark Luedke |
07/25/2023 |
Toby Wiley |
|
16302 N CR 100 E |
|
Arthur |
IL |
61,911 |
|
16302 N CR 100 E |
|
Arthur |
IL |
61911 |
Coles |
217-254-8627 |
|
N |
|
01/25/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 & DS3-L |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
200 |
10.00 |
12.72 |
Coles-Moultrie Electric Coop |
|
|
|
|
Cold |
Y |
N |
Y |
Y |
Y |
Y |
N |
N |
N |
N |
Y |
7/13 New customer. Coles Moultrie Co-op need acct# and meter#.
9/26 sent interconnection for signature.
10/3 No building permit needed.
11/18 Coles-Moultrie received the application and COI – need one line and fee paid.
11/20 One-line is sent over and fee has been paid (check).
12/12 – Utility has been approved. |
|
07/25/2023 12:40 PM |
2,922 |
Edit |
10/24/2023 |
Ericka Tyler |
Mark Luedke |
07/25/2023 |
John Knollenberg |
|
1630 2080th St |
|
Lincoln |
IL |
62,656 |
|
1630 2080th St |
|
Lincoln |
IL |
62656 |
Logan |
217-306-4613 |
|
N |
|
01/31/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
24 |
|
|
|
|
2 |
|
|
2 |
48 |
16 |
200 |
21.12 |
25.44 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
N |
Y |
N |
N |
Y |
7/13 New customer. Ameren Acct# 9458401612, Meter# 72376146.
9/22 started interconnection, need one-line diagram.
9/26 Interconnection submitted DER#27181-paid
10/4 Interconnection Approved |
|
07/25/2023 12:47 PM |
2,923 |
Edit |
03/21/2024 |
Ericka Tyler |
Mark Luedke |
07/25/2023 |
Gary Emmert - Farm |
Farm |
7545 N 1450 E Rd |
|
Georgetown |
IL |
61,846 |
|
7545 N 1450 E Rd |
|
Georgetown |
IL |
61846 |
Vermilion |
217-497-6317 |
|
N |
|
02/07/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
128 |
10.56 |
12.72 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
7/14 New customer. Ameren Acct# 2502007033, Meter# 72593629. Solar disconnect will be on the array, panel box is inside shed where shown on rough site plan.
9/11 Interconnection app started waiting on one-line. ET
9/19 Interconnection submitted DER-26716. Property is located in Georgetown Township so no building permits needed. ET
11/10 Ameren is requiring transformer upgrade. Customer is waiting for site visit. |
|
07/25/2023 01:18 PM |
2,924 |
Edit |
03/21/2024 |
Ericka Tyler |
Mark Luedke |
07/25/2023 |
Gary Emmert - House |
House |
8545 N 1450 E Rd |
|
Georgetown |
IL |
61,846 |
|
8545 N 1450 E Rd |
|
Georgetown |
IL |
61846 |
Vermilion |
217-497-6317 |
|
N |
|
02/07/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
24 |
|
|
|
|
2 |
|
|
2 |
48 |
16 |
218 |
21.12 |
25.44 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
7/19 New customer. Ameren Acct# 2161281614, Meter# 72835587.
9/11 Interconnection started waiting on one-line. ET
9/19 Interconnection submitted DER-26720. Property located in Georgetown Township no building permit needed. ET |
|
07/25/2023 01:36 PM |
2,925 |
Edit |
05/21/2024 |
Ericka Tyler |
Mark Luedke |
07/25/2023 |
Theresa Parr |
|
9202 Blue Needles Dr |
|
Farimount |
IL |
61,841 |
|
9202 Blue Needles Dr |
|
Fairmount |
IL |
61841 |
Vermilion |
217-840-8299 |
|
N |
|
02/13/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
48 |
|
|
|
|
4 |
|
|
4 |
96 |
32 |
128 |
42.24 |
50.88 |
Ameren |
|
|
|
|
Cold |
Y |
N |
Y |
Y |
S |
Y |
N |
N |
N |
N |
Y |
7/19 New customer. Ameren Acct# 6198270018, Meter# 72410789.
9/22 interconnection started need one-line diagram.
10/2 Interconnection submitted. DER-27432
10/4 Property is in Catlin Twp will need a building permit. ET
10/4 Interconnection paid
12/4 Customer is not going to sign interconnection agreement at this point. She does not know if she wants to continue with project now. Mark will follow up. |
|
07/25/2023 01:46 PM |
2,926 |
Edit |
03/21/2024 |
Ericka Tyler |
Mark Luedke |
07/25/2023 |
Charles Ballinger |
|
1798 2250th St |
|
Atlanta |
IL |
61,723 |
|
1798 2250th St |
|
Atlanta |
IL |
61723 |
Logan |
217-737-1142 |
|
N |
|
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
24 |
|
|
|
|
2 |
|
|
2 |
48 |
16 |
|
21.12 |
25.44 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
7/19 New customer. Ameren Acct# 9164321007, Meter# 72395129
9/11 Customer only wants his email used for monitoring purposes. Do not email customer anything either send to Mark or call customer. Sent paperwork to Mark. ET
10/3 need email and one-line diagram – left voicemail to see if he would like to use his email or a faux email.
10/9 Interconnection submitted DER-27873- 10/11 interconnection paid. |
|
07/25/2023 01:52 PM |
2,927 |
Edit |
10/24/2023 |
Ericka Tyler |
Mark Luedke |
07/25/2023 |
James Coogan |
|
1533 900th St |
|
Mount Pulaski |
IL |
62,548 |
|
1533 900th St |
|
Mount Pulaski |
IL |
62548 |
Logan |
217-855-6186 |
|
N |
|
03/26/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
18 |
|
|
2 |
|
|
|
|
2 |
36 |
12 |
220 |
15.84 |
15.90 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
N |
Y |
N |
N |
Y |
7/19 New customer. Ameren Acct# 3837122005, Meter# 72395218
9/11 sent SDF, BOS, SCA for signature.
9/12 received signed SDF, BOS, SCA via email.
9/22 Interconnection started waiting for one-line diagram.
9/26 Interconnection submitted DER#27184
10/4 Interconnection Approved |
|
07/25/2023 02:15 PM |
2,928 |
Edit |
05/09/2024 |
Ericka Tyler |
Mark Luedke |
07/25/2023 |
Mark & Roy Douglas |
|
4612 S Philo Rd |
|
Urbana |
IL |
61,802 |
|
4612 S Philo Rd |
|
Urbana |
IL |
61802 |
Champaign |
217-841-0785 |
|
N |
|
02/20/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
17 DS3 & 13 DS3-L |
30 |
2 |
|
2 |
|
|
|
|
4 |
60 |
20 |
154 |
31.80 |
23.94 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
There are going to be 4 arrays at this site. The breakdown of those is on the System Tab.
9/28 interconnection submitted for Mark soybean building DER#27301, Interconnection for House submitted DER#27310- Both interconnections approved 10/13.
9/28 Interconnection submitted for Roy (shop) DER# 27347- 10/11 Roy Douglas Interconnection approved.
5/9/24 Contacted Champaign County to let them know that construction was complete.
12/1 Champaign Co is still waiting on approval from the City of Urbana in regard to the illegal lot split that was done on this property. Until this is solved, they cannot issue the building permit for solar. Charlie at Champaign Co said he sent a f/u email to the City of Urbana and will keep us posted on updates. Charlie’s phone #217-384-3708. |
House will have 2-18panel arrays with 7DS3L and 11DS3 inverters. Ameren Acct# 3828421002
Seed Shed will have 1-12panel array with 6DS3 inverters. Ameren Acct# 4476095004
Shop will have 1-12panel array with 6DS3L inverters. Ameren Acct# 8469955013 |
07/25/2023 03:54 PM |
2,929 |
Edit |
03/25/2024 |
Ericka Tyler |
Mark Luedke |
07/25/2023 |
Brad Osborne |
|
648 N CR 1760 E |
|
Tuscola |
IL |
61,953 |
Douglas |
648 N CR 1760 E |
|
Tuscola |
IL |
61953 |
Douglas |
217-840-3871 |
|
N |
|
02/12/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
6 |
1 |
|
|
|
|
|
|
1 |
12 |
4 |
|
5.28 |
6.36 |
Eastern Illini Coop |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
7/25 New customer. Eastern Illini Coop
9/28 Interconnection submitted- Paid
10/5 EIEC added to distribution energy resource queue. System will undergo an engineering study. Upon completion of study we will be notified if they need more info or approved.
10/10 EIEC sent email for Interconnection approval – After system and docs are all signed and installed let EIEC know so they can coordinate an interconnection witness test. |
|
07/25/2023 05:29 PM |
2,930 |
Edit |
10/27/2023 |
Ericka Tyler |
Doug Smith |
07/26/2023 |
Patrick and Bonnie Chaplin |
|
4288 E Tank Farm Ln |
|
Olney |
IL |
62,450 |
Richland |
4288 E Tank Farm Ln |
|
Olney |
IL |
62450 |
Richland |
618-843-6886 |
|
N |
07/25/2023 |
11/01/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 & DS3-L |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
231 |
10.00 |
12.72 |
Norris Electric Cooperative |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
7/27 Called City of Olney to find out what rules and regulations are for ground mounted solar. Dallas Colwell with the City of Olney stated that there are no permits for residential ground mounted solar in the City of Olney or the county of Richland. ET
8/23 Submitted interconnection to Norris Electric. ET |
|
07/26/2023 05:57 PM |
2,931 |
Edit |
11/16/2023 |
Laura Lewis |
Gary Rosen |
07/27/2023 |
Ryan and Tricia Singler |
Tricia Singler |
13918 Old Carlyle Rd |
|
Carlyle |
IL |
62,231 |
Clinton |
13918 Old Carlyle Rd |
|
Carlyle |
IL |
62231 |
Clinton |
618-974-8797 |
|
N |
07/27/2023 |
12/29/2023 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
15 |
1 |
|
1 |
|
|
|
|
2 |
30 |
10 |
311 |
13.20 |
15.90 |
Ameren Illinois |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
7/27 submitted solar contracts and SDF to customer for signature. LL
9/22 interconnection started, need one-line diagram.
9/26 county permit started, need customer signature and one-line diagram. ET
9/28 interconnection submitted (DER-27307), county permit submitted, still need FD approval and utility approval ET
10/4 FD approval received. ET
10/9 Interconnection was approved |
|
07/27/2023 02:45 PM |
2,932 |
Edit |
02/27/2024 |
Doug Smith |
Doug Smith |
08/15/2023 |
Darrin Keiser |
|
6443 S. Jonesville Rd. |
|
Columbus |
IN |
47,201 |
Bartholomew |
6443 S. Jonesville Rd. |
|
Columbus |
IN |
47201 |
Bartholomew |
(765) 546-4968 |
|
N |
08/08/2023 |
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
148 |
10.56 |
12.72 |
Duke |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
X |
Y |
Y |
N |
N |
N |
8/31 Need one-line diagram, electrician information, Duke acct #. County permit and interconnection app started. ET
9/11 Sent interconnection app to customer for signature. Electrician will not sign county permit until they have verified that they have the job. CMR Electric has a site visit planned on 9/25 and will send permit back to us once they verify work. ET |
|
08/15/2023 01:30 PM |
2,933 |
Edit |
05/20/2024 |
Doug Smith |
Doug Smith |
08/15/2023 |
George Vlachos |
|
8705 W Laraway Rd |
|
Frankfort |
IL |
60,423 |
Will |
8705 W Laraway Rd |
|
Frankfort |
IL |
60423 |
Will |
708-528-0332 |
|
N |
08/16/2023 |
01/16/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
24 |
|
|
|
|
2 |
|
|
2 |
48 |
16 |
120 |
21.12 |
25.44 |
Com Ed |
|
|
|
|
Cold |
N |
N |
Y |
N |
Y |
Y |
N |
N |
N |
N |
Y |
8/29 Submitted interconnection app to ComEd. Need one line and site plan from Doug. Also waiting on Village of Frankfort to call back with building permit details. We will have to be a registered contractor with the Village. ET
* Heard back from Village of Frankfort and found that they do not allow ground mounted solar only roof top there is not an option for a variance. Doug is going to call the customer and let him know and see how he would like to proceed. Once we know we may need to notify ComEd to withdraw the interconnection app. ET
Customer waiting on solar for another year. Will follow up then. 5/20/24 LL |
|
08/15/2023 01:42 PM |
2,934 |
Edit |
07/09/2024 |
Doug Smith |
Doug Smith |
08/15/2023 |
Ad-Vance Magnetics - DO NOT USE DUPLICATE |
DO NOT USE THIS ONE - DUPLICATE |
625 Monroe St. |
|
Rochester |
IN |
46,975 |
Fulton |
625 Monroe St. |
|
Rochester |
IN |
46975 |
Fulton |
|
574-223-3158 |
N |
06/16/2023 |
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
QT2 208 |
95 |
|
|
|
|
|
|
|
0 |
0 |
0 |
2 |
164.16 |
201.40 |
Duke |
|
|
|
|
Finalize |
N |
N |
Y |
N |
N |
N |
N |
N |
N |
N |
N |
Customer is working with a Structural Engineer to determine capacity and potential upgrades needed for the roof where solar will be installed |
Roof top System – 380 Panels with Solar Stack Stands affixed to roof with adhesive foam |
08/15/2023 02:00 PM |
2,935 |
Edit |
12/15/2023 |
Laura Lewis |
Curt Dambman |
08/15/2023 |
Jeff Waite |
|
|
|
|
|
|
|
21618 Buell Rd |
|
Sterling |
IL |
61081 |
Whiteside |
815-631-6177 |
|
N |
08/28/2023 |
01/19/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
21 |
|
|
1 |
|
1 |
|
|
2 |
42 |
14 |
235 |
18.48 |
22.26 |
ComEd |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
Customer signed forms received 8/28
9/22 Interconnection submitted to ComEd. Still need one-line diagram. Need to confirm location of system, county stated that customer cannot cross property lines. Sent message to customer and Curt asking how to proceed. ET |
|
08/15/2023 03:44 PM |
2,939 |
Edit |
10/12/2023 |
Ericka Tyler |
Patty/Steve |
08/29/2023 |
Berne Hi-Way Hatchery |
|
656 US Hwy 27 |
|
Berne |
IN |
46,711 |
|
6040 S 600 E |
|
Berne |
IN |
46711 |
|
260-589-2197 |
|
N |
08/29/2023 |
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3-L |
150 |
1 |
|
|
|
12 |
|
|
13 |
300 |
100 |
|
|
|
|
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
N |
N |
Y |
N |
N |
N |
|
|
08/29/2023 05:45 PM |
2,940 |
Edit |
08/30/2023 |
Ericka Tyler |
Curt Dambman |
08/29/2023 |
Tom Tessendorf-DO NOT USE THIS ONE-DUPLICATE |
|
13516 W Dublin Rd |
|
Kent |
IL |
61,044 |
Stephenson |
13516 W Dublin Rd |
|
Kent |
IL |
61044 |
Stephenson |
815-291-6750 |
|
N |
08/14/2023 |
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
24 |
|
|
|
|
2 |
|
|
2 |
48 |
16 |
|
21.12 |
25.44 |
ComEd |
|
|
|
|
Finalize |
N |
N |
Y |
N |
N |
Y |
N |
N |
N |
N |
Y |
|
|
08/29/2023 06:57 PM |
2,941 |
Edit |
10/17/2023 |
Laura Lewis |
Curt Dambman |
08/29/2023 |
Tom Tessendorf |
|
|
|
|
|
|
|
13516 W Dublin Road |
|
Kent |
IL |
61044 |
Stephenson |
8152916750 |
|
N |
08/28/2023 |
01/15/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
24 |
0 |
0 |
0 |
0 |
2 |
0 |
0 |
2 |
48 |
16 |
260 |
21.12 |
25.44 |
ComEd |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
signed paperwork received 8/28 |
|
08/29/2023 07:35 PM |
2,942 |
Edit |
03/25/2024 |
Laura Lewis |
Doug Smith |
08/29/2023 |
Michael Briggs |
|
|
|
|
|
|
|
12385 East 400th Avenue |
|
Flat Rock |
IL |
62427 |
Crawford |
618-707-6453 |
|
N |
|
02/02/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
(7)DS3/(5)DS3L |
12 |
0 |
0 |
0 |
0 |
1 |
0 |
0 |
1 |
24 |
8 |
220 |
10.00 |
12.72 |
Norris Electric Cooperative |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
Submitted SDF to customer 8/28
9/13 Crawford County currently has no zoning or building department. Sent interconnection application to customer for signature. Need one-line diagram from Doug. ET |
|
08/29/2023 08:06 PM |
2,943 |
Edit |
03/18/2024 |
Laura Lewis |
Doug Smith |
08/29/2023 |
Greg Tissier |
Greg Tissier - Home |
3708 Randy Ln |
|
Danville |
IL |
61,832 |
Vermilion |
3708 Randy Lane |
|
Danville |
IL |
61832 |
Vermilion |
217-799-3421 |
|
N |
|
02/05/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
(7)DS3/(5)DS3L |
12 |
0 |
0 |
0 |
0 |
1 |
0 |
0 |
1 |
24 |
8 |
124 |
10.00 |
12.72 |
Ameren Illinois |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
Sent customer SDF 8/29
9/13 Ameren interconnection started waiting on confirmation on inverters. SO
9/14 No county or zoning permit needed. ET
9/20 submitted interconnection- DER#26767-paid |
|
08/29/2023 08:13 PM |
2,944 |
Edit |
11/10/2023 |
Laura Lewis |
Justin Detmer |
08/31/2023 |
Allen and Melissa Faust |
Al Faust |
|
|
|
|
|
|
4000 Rocky Ford Road |
|
Aviston |
IL |
62216 |
Clinton |
618-973-7766 |
|
N |
08/11/2023 |
01/09/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
6 |
1 |
|
|
|
|
|
|
1 |
12 |
4 |
319 |
5.28 |
6.36 |
Ameren Illinois |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
9/22 County permit and interconnection started. Need one-line diagram, FD approval and utility approval to move forward with building permit. ET
9/28 interconnection submitted- paid
10/11 interconnection Approved |
|
08/31/2023 08:21 PM |
2,946 |
Edit |
11/20/2023 |
Laura Lewis |
Gary Rosen |
09/08/2023 |
Marc Lindauer |
Marc Lindauer |
|
|
|
|
|
|
5506 Turner Hall Road |
|
Smithton |
IL |
62285 |
St Clair |
314-791-4733 |
|
N |
|
02/08/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
(7)DS3 / (5)DS3L |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
350 |
10.00 |
12.72 |
Monroe County Electric Cooperative |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
Customer referral from Mark to Gary.
9/27 interconnection and building permit submitted, FD acknowledgement sent. ET |
|
09/08/2023 03:07 PM |
2,947 |
Edit |
02/16/2024 |
Sarah Ousley |
Mark Luedke |
09/08/2023 |
Jim Hixson |
|
|
|
|
|
|
|
263 CR 500 N |
|
Ivesdale |
IL |
61851 |
Champaign |
217-202-6536 |
|
N |
|
02/19/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
18 |
|
|
2 |
|
|
|
|
2 |
36 |
12 |
178 |
15.40 |
18.55 |
Eastern Illin Electric Cooperative |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
9/8 sent SDF, BOS,SCA for signature.
9/20 received signed documents via email
10/3 Need utility bill sent email- Interconnection started- need 1-line
10/6 interconnection sent for signature.
11/27 Sent interconnection to customer for signature again.
2/15 Sent email to Champaign Co to let them know that the system has been built. |
“* Customer wanted 2- 18 panel systems. In an email thread, this is stated to be a special case.
The customers utility limited his DC kw rating. So, it is actually a 35 panel with 18 DS3 inverters using 17.5” |
09/08/2023 07:39 PM |
2,948 |
Edit |
11/14/2023 |
Sarah Ousley |
Mark Luedke |
09/11/2023 |
Larry Messmore |
|
27426 Shake Rag Road |
|
Danville |
IL |
61,834 |
Vermilion |
|
|
|
|
|
|
217-474-5818 |
|
N |
09/14/2023 |
03/06/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 (7) DS3-L (5) |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
119 |
10.00 |
12.72 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
9/11 SDF, BOS, SCA for signature.
9/13 Received signed SDF and BOS via email- waiting for SCA.
9/14 Received all signed documents.
9/20 Interconnection submitted – DER#-26788-paid- Approved
11/14 Level 1 – Approved |
|
09/11/2023 04:08 PM |
2,949 |
Edit |
07/17/2024 |
Laura Lewis |
Mark Luedke |
09/11/2023 |
Jeff Mueller |
Jeff Mueller - Home |
1222 N 3000 E Road |
|
Strawn |
IL |
61,775 |
Livingston |
1222 N 3000 E Road |
|
Strawn |
IL |
61775 |
Livingston |
217-249-9543 |
|
Y |
12/08/2023 |
02/26/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 & DS3-L |
114 |
1 |
|
|
|
9 |
|
|
10 |
228 |
76 |
135 |
99.98 |
120.84 |
Eastern Illini Electric Cooperative |
|
|
|
|
Cold |
Y |
N |
Y |
Y |
Y |
Y |
Y |
N |
N |
N |
Y |
This is his home. |
|
09/11/2023 06:19 PM |
2,950 |
Edit |
07/17/2024 |
Laura Lewis |
Mark Luedke |
09/11/2023 |
Jeff Mueller - Sibley, IL |
349 E 1100 N Rd, Sibley, IL |
1222 N 3000 E Road |
|
Strawn |
IL |
61,775 |
Livingston |
349 E 1100 N Rd |
|
Sibley |
IL |
61773 |
Ford Co |
217-249-9543 |
|
Y |
|
03/11/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 & DS3-L |
114 |
1 |
|
|
|
9 |
|
|
10 |
228 |
76 |
140 |
99.98 |
120.84 |
Eastern Illini Electric Cooperative |
|
|
|
|
Cold |
Y |
N |
Y |
Y |
Y |
Y |
Y |
N |
N |
N |
Y |
12/14 EIEC required DC size to be lowered. Had to revise all paperwork and resubmit to EIEC and IL Shines. |
111 DS3 and 3 DS3L |
09/11/2023 06:25 PM |
2,951 |
Edit |
07/17/2024 |
Laura Lewis |
Mark Luedke |
09/11/2023 |
Jeff Mueller |
County Line Road |
1222 N 3000 E Road |
|
Strawn |
IL |
61,775 |
Livingston |
29073 E 00 N Road |
|
Strawn |
IL |
61775 |
Livingston |
217-249-9543 |
|
Y |
|
03/18/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
84 |
|
|
|
|
7 |
|
|
7 |
168 |
56 |
138 |
73.92 |
89.04 |
Eastern Illini Electric Cooperative |
|
|
|
|
Cold |
Y |
N |
Y |
Y |
Y |
Y |
Y |
N |
N |
N |
Y |
This site has two meters being interconnected to. No meter numbers on file.
1 24-panel array to the small shop
6 24-panel arrays to the large barn |
This site is made up of two systems interconnecting to two separate meters.
1 24-panel array to small shop.
6 24-panel arrays to large barn.
No meter numbers on file |
09/11/2023 06:41 PM |
2,952 |
Edit |
03/25/2024 |
Sarah Ousley |
Mark Luedke |
09/12/2023 |
Blake Lindauer |
|
821 Lunch Rd |
|
Smithton |
IL |
62,285 |
St Clair |
821 Lunch Rd |
|
Smithon |
IL |
62285 |
St Clair |
618-558-5992 |
|
N |
09/13/2023 |
04/03/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
18 |
|
|
2 |
|
|
|
|
2 |
36 |
12 |
345 |
15.84 |
19.08 |
Monroe Co Electric Co-Op |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
9/12 SDF, BOS, SCA for signature
9/13 received signed SDF, BOS, SCA via email.
9/15 Received Signed unavailability of net metering form.
9/27 Interconnection submitted (MCEC) via email. – payment sent via check
10/31 Sent follow up email to Keith Jones about interconnection. He sent email stating approved. |
|
09/12/2023 03:51 PM |
2,953 |
Edit |
11/20/2023 |
Laura Lewis |
Gary Rosen |
09/12/2023 |
Todd Fix |
|
|
|
|
|
|
|
10560 Rieder Road |
|
Lebanon |
IL |
62254 |
St Clair |
618-580-8052 |
|
N |
|
03/04/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
(7)DS3 / (5)DS3L |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
326 |
10.00 |
12.72 |
Ameren Illinois |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
10/5 Interconnection submitted DER-27662.
10/5 Sent Fire Dept plans and permit. Have to have utility approval and FD approval before submitting building permit. ET |
|
09/12/2023 05:55 PM |
2,954 |
Edit |
12/11/2023 |
Sarah Ousley |
Mark Luedke |
09/13/2023 |
Sharon Clark |
|
16168 south Markley Road |
|
Danville |
IL |
61,834 |
Vermilion |
|
|
|
|
|
|
217-474-6821 |
|
N |
09/18/2023 |
04/08/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
18 |
|
|
2 |
|
|
|
|
2 |
36 |
12 |
|
15.84 |
19.08 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
9/12 sent SDF, BOS, SCAs for signature.
9/18 received signed documents via email.
9/22/23 Interconnection started Need one-line
9/26 Interconnection submitted DER#27187-paid
10/4 Interconnection Approved
12/8 - approved witness test. |
|
09/13/2023 12:58 PM |
2,955 |
Edit |
03/19/2024 |
Sarah Ousley |
Mark Luedke |
09/13/2023 |
Steven Lustfeldt |
|
1186 North 100 East Road |
|
Thawville |
IL |
60,968 |
Iriquois |
|
|
|
|
|
|
|
|
N |
09/18/2023 |
04/11/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
15 |
1 |
|
1 |
|
|
|
|
2 |
30 |
10 |
123 |
13.20 |
15.90 |
Eastern Illini Electric Co-op |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
9/13 sent SDF, BOS, SCAs for signature.9/15 received signed SDF, SCA, and signed BOS.9/26 interconnection started sent over for signature10/6 received signed interconnection waiting for proof of insurance10/18 Phone number on hand requested we dont contact anymore. Reached out via email to see if wrong phone number is on hand10/26 Interconnection sent to EIEC.12/6 EIEC approved need to notify them once complete with signage.12/13 – scheduled for locate on 12/16 – approved #A233471571 |
Notify EIEC once system is built and placards are installed. |
09/13/2023 08:18 PM |
2,956 |
Edit |
12/15/2023 |
Sarah Ousley |
Mark Luedke |
09/14/2023 |
Mark Ifft |
|
22900 East 1225 North |
|
Fairbury |
IL |
61,739 |
Livingston |
22900 E 1225 N |
|
Fairbury |
IL |
617939 |
Livingston |
8156749126 |
|
N |
09/15/2023 |
04/16/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
24 |
|
|
|
|
2 |
|
|
2 |
48 |
16 |
140 |
21.12 |
25.44 |
ComEd |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
9/14- sent SDF,BOS,SCAs for signature
9/15 all paperwork signed.
10/11 Interconnection approved. |
|
09/14/2023 01:41 PM |
2,957 |
Edit |
12/18/2023 |
Sarah Ousley |
Mark Luedke |
09/15/2023 |
David Trowbridge |
|
9655 East 2150 North Road |
|
Danville |
IL |
61,834 |
Vermilion |
|
|
|
|
|
|
|
|
N |
09/15/2023 |
04/22/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 (16) DS3-L (14) |
30 |
|
|
2 |
|
1 |
|
|
3 |
60 |
20 |
130 |
24.83 |
31.80 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
9/15 sent SDF, BOS, SCA for signature.
9/18 Received signed documents via email.
9/20 Interconnection submitted DER#-26780
9/22 Interconnection DER#-26780 Paid for and Approved
In Vermillion County no building permit needed.
12/18 approved to operate. |
|
09/15/2023 02:27 PM |
2,958 |
Edit |
12/15/2023 |
Sarah Ousley |
Mark Luedke |
09/15/2023 |
Megan Kelsey |
|
12704 E. 2200 N. Rd |
|
Danville |
IL |
61,834 |
Vermilion |
12704 E 2200 N Rd |
|
Danville |
IL |
61834 |
Vermilion |
217-260-0939 |
|
N |
09/18/2023 |
04/18/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
24 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
125 |
21.12 |
25.44 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
9/15 sent SDF, BOS, SCA for signature.
9/20 Received Signes BOS, SCA but waiting for signed SDF – email was sent as reminder and new request for e-signature.
9/22 interconnected started waiting for one line diagram
9/26 interconnection submitted DER#27237
10/4 interconnection paid
10/9 Interconnection Approved |
|
09/15/2023 07:34 PM |
2,959 |
Edit |
12/03/2024 |
Sarah Ousley |
Mark Luedke |
09/18/2023 |
Michael Hamilton |
|
1030 2000th Ave. |
|
Chestnut |
IL |
62,518 |
Logan |
1030 2000th Ave |
|
Chestnut |
IL |
62518 |
Logan |
309-208-4981 |
|
N |
09/20/2023 |
05/06/2024 |
Heliene |
Heliene 144HC M10 Bifacial 535 |
AP Systems |
DS3 |
17 |
|
|
2 |
|
|
|
|
2 |
36 |
12 |
200 |
15.84 |
19.26 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
9/18- sent SDF,SCA,BOS for signature.
9/20 received signed Documents via email.
10/4 interconnection started need 1-line diagram
10/9 Interconnection submitted DER-27865- 10/11 interconnection paid.
10/18 interconnection was turned down – requested to downsize or upgrade to a bigger meter sent email to Mark and Mike on how to proceed
10/25 Customer has decided to move forward with transformer upgrade.
12/18 Customer has decided to wait for construction until March or April of 2024. |
|
09/18/2023 07:18 PM |
2,960 |
Edit |
11/10/2023 |
Sarah Ousley |
Mark Luedke |
09/19/2023 |
John Brasel |
|
3310 North Bowman Ave. |
|
Danville |
IL |
61,834 |
Vermilion |
|
|
|
|
|
|
|
|
N |
09/21/2023 |
05/08/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
9 |
|
|
1 |
|
|
|
|
1 |
18 |
6 |
120 |
7.92 |
9.54 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
9/19- Sent SDF,BOS, SCA for signature.
9/21 Received Signed BOS, SCA, SDF
9/22 Interconnection started waiting for one line diagram
9/26 Interconnection submitted DER# 27192
10/4 interconnection approved |
|
09/19/2023 01:01 PM |
2,961 |
Edit |
12/04/2023 |
Sarah Ousley |
Mark Luedke |
09/19/2023 |
Rick Hill |
|
2610 Hedge Lane Road |
|
Springfield |
IL |
62,707 |
Sangamon |
|
|
|
|
|
|
217-725-3649 |
|
N |
09/20/2023 |
05/10/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
8 |
|
|
0 |
|
|
|
|
0 |
0 |
0 |
235 |
7.92 |
9.54 |
CWLP (City, Water, Light and Power) |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
9/19- Sent SDF, BOS, SCA for signature.
9/20 Received Signed Documents
10/5 Interconnection was sent for signature.
10/6 interconnection submitted
10/18 need updated one- line diagram sent out email.
11/1 sent revised single line diagram to City of Springfield and utility
12/4 Left message for Heather Williams at CWLP to do witness test to commission system. |
|
09/19/2023 08:42 PM |
2,962 |
Edit |
12/18/2023 |
Sarah Ousley |
Mark Luedke |
09/21/2023 |
Chet Stock |
|
42618 N 670 East Rd |
|
Rankin |
IL |
60,960 |
Vermilion |
42618 N 670 East Rd |
|
Rankin |
IL |
60960 |
Vermilion |
217-495-2676 |
|
N |
09/21/2023 |
05/08/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
6 |
|
|
|
|
|
|
|
0 |
0 |
0 |
115 |
5.28 |
6.36 |
Eastern Illini Electric Co-op |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
9/21- sent SDF,SCA,BOS
9/21 received signed documents
10/3 sent interconnection via email for signature- Need 1-line
10/6 Interconnection Submitted and email to send check sent to melinda |
|
09/21/2023 06:10 PM |
2,963 |
Edit |
06/03/2024 |
Ericka Tyler |
Curt Dambman |
09/27/2023 |
Lee Charles |
|
|
|
|
|
|
|
12868 IL Rte 78 |
|
Mount Carroll |
IL |
61053 |
Carroll |
8155414044 |
8155415187 |
N |
04/18/2024 |
08/08/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 & DS3-L |
24 |
|
|
0 |
|
2 |
|
|
2 |
48 |
16 |
|
19.78 |
25.44 |
Jo-Carroll Energy |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
9/27 interconnection ready to submit need one-line
9/28 need clarification on location of arrays, have to be 100′ from the center of IL 78 and 10′ off of side/rear property lines ET
9/29 interconnection submitted to Jo Carroll Energy. ET
10/2 submitted county permit #2023200. ET
10/19 Jo Carroll Energy is requiring a transformer upgrade. Sent message to Curt and customer to see if they want to proceed.
4/16 Revised paperwork and sent to customer for signature. |
|
09/27/2023 12:28 PM |
2,964 |
Edit |
12/06/2023 |
Sarah Ousley |
Gary Rosen |
09/28/2023 |
Jeff Ottenschnieder |
|
7148 Old State Road |
|
Breese |
IL |
62,230 |
Clinton |
7148 Old State Road |
|
Breese |
IL |
62230 |
Clinton |
618-973-8584 |
|
N |
09/20/2023 |
04/16/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
15 |
1 |
|
1 |
|
|
|
|
2 |
30 |
10 |
315 |
13.20 |
15.90 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
N |
Y |
9/28 interconnection started- need 1-line
10/3 letter sent to Breese FD, sent permit to customer for signature. ET
10/4 FD approval received.
10/5 Interconnection submitted DER-27663.- 10/9 Interconnection Paid.
10/16 interconnection approved. |
|
09/28/2023 08:58 PM |
2,965 |
Edit |
01/09/2024 |
Sarah Ousley |
Doug Smith |
09/29/2023 |
Maddie Darling |
|
832 County Road 3150 North |
|
Dewey |
IL |
61,840 |
Champaign |
832 County Road 3150 North |
|
Dewey |
IL |
61840 |
Champaign |
217-418-0903 |
|
N |
|
06/03/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
15 |
1 |
|
1 |
|
|
|
|
2 |
30 |
10 |
146 |
13.20 |
15.90 |
Eastern Illini Electric CO-OP |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
10/3 Need proof of Utility in her name to start interconnection application.
10/4 – Received all documents needed. Submitted Interconnection via email to EIEC – On hold EIEC is requiring downsize.
10/16- EIEC agreed to move forward with the application.
10/31 – EIEC approved interconnection. Need to notify them when system and signage are installed for witness test.
12/19 – Champaign Co need to go out for inspection after built.
1/9 - Sent notification to Champaign Co that structure was done but not electrical. |
|
09/29/2023 12:36 PM |
2,966 |
Edit |
08/16/2024 |
Sarah Ousley |
Curt Dambman |
09/29/2023 |
Doug Nehrkorn |
|
23134 US Hwy 52 |
|
Lanark |
IL |
61,046 |
Carroll |
23134 US Hwy 52 |
|
Salem |
IL |
61046 |
Carroll |
815-541-2614 |
|
Y |
|
05/20/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
QT2 208 |
30 |
|
|
|
|
5 |
|
|
5 |
120 |
40 |
250 |
51.84 |
63.60 |
ComEd |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
11/7 – Permit was submitted online.
11/9 – Created new BOS, site map and Solar Contract for QT2 inverters.
11/10 – called us about an invoice about the zoning board through Carroll County. Emailing us the receipt to pay
11/21 – ComEd sent app back for an updated one-line.
11/28 – Revised one-line for interconnection update.
2/2 – Doug Nehrkorn possibly adding a grain dryer which will require a transformer upgrade and may negate the need for an upgraded transformer for solar. Waiting for confirmation of this. Need to know by 2/23 since signed IA is due 30 days from 1/26/24
3/1 – Agreement sent to customer. Signed and sent in 3/5 |
Updated inverters to meet 3p service – 11/9 |
09/29/2023 12:59 PM |
2,967 |
Edit |
05/15/2024 |
Sarah Ousley |
Curt Dambman |
09/29/2023 |
Tom Nehrkorn Farms |
|
14445 Brethren Road |
|
Lanark |
IL |
61,046 |
Carroll |
14445 Brethren RD |
|
Lanark |
IL |
61046 |
Carroll |
815-821-5180 |
|
Y |
11/01/2023 |
05/28/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
QT2 208 |
42 |
|
|
|
|
7 |
|
|
7 |
168 |
56 |
250 |
72.58 |
89.04 |
ComEd |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
11/10 – started interconnection application.
Paperwork has been signed.
11/20 – Waiting on one-line diagram for permit.
11/28 Received one-line diagram.
11/28 Uploaded interconnection (pd.) and permit application
1/29 – ComEd under review
2/28 – modified application for correct inverters – ComEd still not agreeing with that data?
2/29 – ComEd requesting payment for supplemental review – check sent because online would not work.
3/11 – approval – email saved in their file |
|
09/29/2023 01:12 PM |
2,968 |
Edit |
03/21/2024 |
Sarah Ousley |
Curt Dambman |
09/29/2023 |
Howard Herrell |
|
16877 Corbett Rd |
|
Mount Carroll |
IL |
61,053 |
Carroll |
16877 Corbett Dr |
|
Mount Carroll |
IL |
61053 |
Carroll |
815-441-2200 |
|
N |
|
06/04/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
260 |
10.56 |
12.72 |
Jo- Carroll Energy |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
9/29 sent SDF, BOS, SCA for signature.
10/4 interconnection started need 1-line
10/6 interconnection sent for signature
10/9 Building permit submitted 2023206
10/18 Interconnection submitted and emailed Melinda to send check
2/1/24 Got verbal confirmation from John Scott that interconnection has been approved. They will get us the official documentation this week. When construction done send COC to Jo Carroll. |
|
09/29/2023 06:39 PM |
2,971 |
Edit |
03/29/2024 |
Sarah Ousley |
Mark Luedke |
10/02/2023 |
LWH- Curtis Root |
|
702 East Court Street |
|
Paris |
IL |
61,944 |
Edgar |
|
|
|
IL |
|
|
2173694055 |
217-369-4055 |
Y |
|
05/29/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
54 |
|
|
2 |
|
3 |
|
|
5 |
108 |
36 |
157 |
47.52 |
57.24 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
10/2 interconnection submitted – DER#27448
11/7 – reviewed and sent over interconnection agreement to Curtis Root.
11/9 – There are no side and rear setbacks as long as the solar panels do not overhang onto someone else’s property. Arrays have to be 25feet off of the centerline of Eads Ave.
11/9 – Ameren cleared for construction. |
|
10/02/2023 04:44 PM |
2,972 |
Edit |
01/12/2024 |
Sarah Ousley |
Mark Luedke |
10/03/2023 |
John Sandusky |
|
9878 E 2150 N Road |
|
Danville |
IL |
61,834 |
Vermilion |
|
|
|
|
|
|
217-504-2749 |
|
N |
|
04/25/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 (7) DS3-L (5) |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
120 |
10.00 |
12.72 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
10/3 – Need account # and meter #, and 1-line diagram to submit interconnection. Sent email to get copy.
10/6 Interconnection submitted DER-27866- 10/11 interconnection paid.
10/16 Interconnection approved
10/18 No building permit needed.
1/12 - approval to operate |
|
10/03/2023 07:28 PM |
2,973 |
Edit |
06/08/2024 |
Ericka Tyler |
Jim Straeter |
10/04/2023 |
Fair Oaks Farms/Curtis Creek Dairy LLC |
|
5431 E 600 N |
|
Fair Oaks |
IN |
47,943 |
Newton |
5431 E 600 N |
|
Fair Oaks |
IN |
47943 |
Newton |
8289892673 |
|
N |
|
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
QT2 480 |
276 |
|
|
|
|
46 |
|
|
46 |
1,104 |
368 |
|
|
|
NIPSCO |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
X |
Y |
Y |
N |
N |
Y |
10/4 submitted revised interconnection application to cnbniscource.com and [email protected]. I have reached out to Jack Kurfman as well with no response. ET
Caleb Harper is the contact for this project his email is above. His phone number is 617-304-4112.
5/14 Carl Ramsey needs to pick up county permits. Need EDG agreements signed, and COI sent to NIPSCO. |
|
10/04/2023 01:59 PM |
2,974 |
Edit |
12/03/2024 |
Sarah Ousley |
Mark Luedke |
10/04/2023 |
Hendricks Warner Contracting |
|
2867 East Route 9 |
|
Rankin |
IL |
60,960 |
Vermilion |
|
|
|
IL |
|
|
217-918-5179 |
|
N |
|
05/16/2024 |
Heliene |
Heliene 144HC M10 Bifacial 540 |
AP Systems |
QT2 480 |
5 |
|
|
1 |
|
|
|
|
1 |
18 |
6 |
117 |
9.54 |
9.72 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
N |
N |
N |
N |
Y |
10/4 Interconnection started need 1-line
10/9 Interconnection submitted DER-27867- 10/11 interconnection paid. |
|
10/04/2023 04:13 PM |
2,979 |
Edit |
10/17/2024 |
Ericka Tyler |
Mark Luedke |
10/11/2023 |
Ted Meharry |
Quanset |
|
|
|
|
|
|
686 County Road 1300 E |
|
Tolono |
IL |
61880 |
Champaign |
217-369-4810 |
|
N |
09/22/2023 |
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
QT2 208 |
14 |
|
|
2 |
|
1 |
|
|
3 |
60 |
20 |
|
24.19 |
31.80 |
Ameren |
|
|
|
|
Review |
Y |
N |
Y |
Y |
Y |
Y |
N |
N |
N |
N |
Y |
11/2 Ameren interconnection submitted DER-29522. Building permit submitted.5/21 Sent SREC Contract for customer to sign. His Part I app for IL Shines has been verified and ICC approved. If he does not build he will owe us collateral. |
|
10/11/2023 12:46 PM |
2,983 |
Edit |
01/08/2024 |
Ericka Tyler |
Jim Straeter |
10/17/2023 |
EVAPAR |
|
9000 N Kentucky Ave |
|
Evansville |
IN |
47,725 |
Vanderburgh |
9000 N Kentucky Ave |
|
Evansville |
IN |
47725 |
Vanderburgh |
812-454-5728 |
|
N |
|
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
QT2 480 |
66 |
|
|
|
|
11 |
|
|
11 |
264 |
88 |
|
118.80 |
139.92 |
CenterPoint Energy |
|
|
|
|
Finalize |
Y |
N |
N |
Y |
Y |
X |
Y |
Y |
N |
N |
N |
10/17 Sent interconnection app to CenterPoint Energy. Sent building permit to customer for signature.
11/17 City of Evansville has approved building permit but electrician has to go in and pull the electrical permit we cannot do that. Still waiting on interconnection approval from Centerpoint. |
|
10/17/2023 02:33 PM |
2,984 |
Edit |
01/10/2024 |
Ericka Tyler |
Jim Straeter |
10/23/2023 |
Nathan Dazey |
|
7611 Jenner Rd |
|
Chandler |
IN |
47,610 |
Warrick |
7611 Jenner Rd |
|
Chandler |
IN |
47610 |
Warrick |
812-454-5702 |
|
N |
|
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
23 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
|
10.56 |
12.72 |
CenterPoint Energy |
|
|
|
|
Finalize |
Y |
N |
N |
Y |
Y |
X |
Y |
Y |
N |
N |
N |
11/27 Spoke with Angie Lutz at the Warrick County Building Department and she said that a residential building permit has already been obtained for this project. Building permit #01-35171.
12/7 Need to call 812-431-4391 per Angie Lutz before CenterPoint will turn system on for final inspection. Also need to notify CenterPoint Energy. |
|
10/23/2023 03:44 PM |
2,985 |
Edit |
02/07/2024 |
Laura Lewis |
Doug Smith |
10/23/2023 |
Duck It Farms |
Duck it Farms |
1307 N 1000 W |
|
Cromwell |
IN |
46,732 |
Noble |
|
|
|
|
|
|
260-402-5023 |
|
N |
10/09/2023 |
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
60 |
1 |
|
|
|
5 |
|
|
6 |
132 |
44 |
55 |
52.80 |
69.96 |
Noble County REMC |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
X |
Y |
Y |
N |
N |
N |
Signed BOS on file for 10/9/2023
12/1 Sent interconnection application to customer for signature. Have submitted complete set of plans to Noble County Plan Commission for review.
1/24 Noble County Plan Commission has given the go ahead to apply for building permit.
1/30 Building permit has been approved. Customer will have to upgrade utility service and has asked for 30 day notice prior to construction to get this done. |
|
10/23/2023 07:23 PM |
2,986 |
Edit |
12/18/2024 |
Ericka Tyler |
Mike Straeter |
11/02/2023 |
Freedom Pork Farms LLC |
|
|
|
|
|
|
|
|
9710 S 100 E |
Claypool |
IN |
46510 |
Kosciusko |
|
|
N |
|
|
Heliene |
144HC M10 Bifacial 540W |
AP Systems |
DS3 |
96 |
|
|
|
|
8 |
|
|
8 |
192 |
64 |
|
84.48 |
103.68 |
|
|
|
|
|
Finalize |
N |
N |
N |
Y |
Y |
X |
N |
Y |
N |
N |
N |
11/2 Mike had asked for this to be put in the portal. Scott Sands is waiting on grant approval before committing.
3/7 Got the green light on interconnection and permitting
3/14 – began work on permit and interconnection
7/15 – paid for approved Building Permit – waiting for copy of it |
|
11/02/2023 06:22 PM |
2,987 |
Edit |
03/14/2024 |
Ericka Tyler |
Homan Inc |
11/09/2023 |
Ben Wenning |
|
4861 State Rt 219 |
|
Coldwater |
OH |
45,828 |
Mercer |
4861 State Rt 219 |
|
Coldwater |
OH |
45828 |
Mercer |
419-305-6883 |
|
N |
|
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
27 |
|
|
3 |
|
|
|
|
3 |
54 |
18 |
|
23.76 |
28.62 |
AES Ohio |
|
|
|
|
Finalize |
Y |
N |
N |
Y |
Y |
X |
Y |
Y |
N |
N |
N |
11/9 This project is in Mercer County but permits are handled through the township of Bulter. Need one-line diagram. Sent interconnection application to customer for signature.
11/16 Submitted interconnection app to AES Ohio. AES-OH-00750 |
|
11/09/2023 03:59 PM |
2,989 |
Edit |
12/03/2024 |
Kacie Pugh |
Homan Inc |
11/13/2023 |
Schmidt Swine Farms |
|
4748 State Route 122 W |
|
Eaton |
OH |
45,320 |
Preble |
509 Borradaile Rd |
|
Eaton |
OH |
45320 |
Preble |
765-220-2343 |
|
N |
|
|
Heliene |
Heliene 144HC M10 Bifacial 540 |
AP Systems |
DS3 |
72 |
|
|
|
|
6 |
|
|
6 |
144 |
48 |
170 |
63.36 |
77.76 |
AES Ohio |
|
|
|
|
Finalize |
N |
N |
N |
S |
S |
X |
N |
N |
N |
N |
N |
Site address is 509 Borradaile Rd. Eaton, OH 45320
Interconnection started – 11/13
Permit Application submitted 11/13
** GRANT APPROVED 9/17/24 ** |
|
11/13/2023 06:12 PM |
2,990 |
Edit |
10/14/2024 |
Kacie Pugh |
Mark Luedke |
11/16/2023 |
4 Illini Farms |
4 Illini |
1943 2150th Ave |
|
Beason |
IL |
62,512 |
Logan |
1943 2150th Ave |
|
Atlanta |
IL |
61723 |
Logan |
2178711209 |
|
Y |
|
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
84 |
|
|
|
|
7 |
|
|
7 |
168 |
56 |
203 |
73.92 |
89.04 |
Ameren |
|
|
|
|
Cold |
N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
Y |
Permit started – 11/15
Names: Dean – parcel owner; Allen – project starter; Jason Bragg – utility bill under his name.
11/22 – sent customer paperwork to sign.
11/24 – finished AutoCAD drawing = WAITING ON PAPERWORK TO SEND IN ALL NEEDED FOR COUNTY PERMIT.
12/13 – followed up for a 3rd time for signing paperwork.
12/14 – ON HOLD UNTIL JAN per Mark |
|
11/16/2023 07:44 PM |
2,992 |
Edit |
12/03/2024 |
Ericka Tyler |
Homan Inc |
11/17/2023 |
Hoosier Pride Farms LLC |
|
7188 N State Line Rd |
|
Bryant |
IN |
47,326 |
Jay |
7188 N State Line Rd |
|
Bryant |
IN |
47326 |
Jay |
419-852-0003 |
419-852-1434 |
N |
|
|
Heliene |
Heliene 144HC M10 Bifacial 535 |
AP Systems |
QT2 480 |
900 |
|
|
|
|
150 |
|
|
150 |
3,600 |
1,200 |
|
1,620.00 |
1,926.00 |
Jay County REMC |
|
|
|
|
Finalize |
N |
N |
N |
S |
S |
X |
N |
N |
N |
N |
N |
11/17 Sent interconnection application to customer for signature. |
|
11/17/2023 07:26 PM |
2,993 |
Edit |
12/03/2024 |
Kacie Pugh |
Doug Smith |
11/27/2023 |
James and Michelle Krintz |
Krintz Lawncare |
P.O. Box 451 |
|
Brookston |
IN |
47,923 |
White |
95 W 1250 S |
|
Brookston |
IN |
47923 |
White |
765-427-1015 |
|
N |
11/20/2023 |
|
Heliene |
Heliene 144HC M10 Bifacial 540 |
AP Systems |
DS3 |
42 |
1 |
|
|
|
3 |
|
|
4 |
84 |
28 |
56 |
36.96 |
45.36 |
Carroll White |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
X |
Y |
N |
N |
N |
N |
11/27 Permit and Interconnection started.
11/30 – Sent interconnection paperwork to sign.
12/1 – Permit submitted to White Co. through online portal.
12/22 – Submitted Ag Operations paper to White Co. Interconnection is almost ready.
1/3 – Submitted an Excess Energy payment.
1/3 – Sent Melinda information to pay the check to CWREMC for interconnection fee. Also let Michelle know about the charge applied on the account.
1/8 – Carroll White REMC received payment. Received email from Wabash Valley REMC about sending information to them. Waiting for Interconnection Agreement to be sent.
2/2 – sent WVPA application |
|
11/27/2023 03:56 PM |
2,995 |
Edit |
10/10/2024 |
Ericka Tyler |
Doug Smith |
11/28/2023 |
Advance Magnetics |
|
625 Monroe St |
|
Rochester |
IN |
46,975 |
Fulton |
625 Monroe St |
|
Rochester |
IN |
46975 |
Fulton |
|
574-223-3158 |
N |
08/15/2023 |
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
QT2 480 |
98 |
|
|
|
|
|
|
|
0 |
380 |
0 |
|
164.16 |
201.40 |
Duke |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
X |
N |
Y |
N |
N |
N |
11/28 Submitted interconnection application to Duke.
Paperwork submitted to Fulton County BZA. Meeting will be in February. |
Roof mount system, 380 Panels total |
11/28/2023 07:09 PM |
2,997 |
Edit |
08/27/2024 |
Laura Lewis |
Jim Straeter |
12/19/2023 |
Harford Farms Inc |
Harford Farms Inc. |
650 S Baker Rd |
|
Mazon |
IL |
60,444 |
|
1255 West Spring Rd |
|
Mazon |
IL |
60444 |
Grundy |
815-343-3878 |
815-448-2138 |
N |
12/22/2023 |
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
84 |
|
|
|
|
7 |
|
|
7 |
168 |
56 |
135 |
73.92 |
89.04 |
ComEd |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
N |
Y |
N |
N |
Y |
5/15 Need to find an electrician before customer will do the array installation. Customer has had a bad Spring with the weather and right now has his hands full. We may have an option for an electrician but that electrician can’t do the work until August, so we’d install in July if that’s what we have to live with. |
|
12/19/2023 02:54 PM |
2,998 |
Edit |
02/05/2024 |
Laura Lewis |
Matt Cowell |
12/21/2023 |
Terry Holcomb |
Terry Holcomb |
|
|
|
|
|
|
3932 State Route 3 |
|
Red Bud |
IL |
62278 |
Clinton |
618-977-3450 |
618-410-0381 |
N |
|
06/10/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
24 |
|
|
|
|
2 |
|
|
2 |
48 |
16 |
367 |
21.12 |
25.44 |
Monroe County Electric Cooperative |
|
|
|
|
Cold |
N |
N |
N |
N |
N |
Y |
N |
N |
N |
N |
Y |
Matt Cowell is the salesman, asking Jesse to add him to the Salesperson |
MC Electric is selling the system and there will not be signed BOS on file. |
12/21/2023 04:03 PM |
2,999 |
Edit |
12/11/2024 |
Laura Lewis |
Justin Detmer |
12/22/2023 |
James Mcdonald |
Jim Mcdonald |
|
|
|
|
|
|
2028 Queens Lake Rd |
|
New Baden |
IL |
62265 |
Clinton |
|
|
N |
11/04/2024 |
12/03/2024 |
Heliene |
144HC M10 Bifacial 540W |
AP Systems |
DS3 |
|
|
|
1 |
|
2 |
|
|
3 |
66 |
22 |
329 |
27.60 |
35.64 |
Ameren Illinois |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
N |
Y |
N |
N |
Y |
12/22 – need confirmation of system size moving fwd with and customer phone number to continue paperwork. LLCustomer ready to move forward, need to fast track applications to make net metering deadline. 7/23 |
installing two 18-panel arrays, one at each meter located on the same parcel (house and shop). 1 ABP app, 1 permit, 2 interconnection apps.Meter 72824646 Acct 4941116173Meter 25927702 Acct 5664744009
UPDATE 11/1/24 – installing 1-18 and 2-24s |
12/22/2023 02:10 PM |
3,000 |
Edit |
12/03/2024 |
Kacie Pugh |
Jim Straeter |
12/26/2023 |
MP3 Farms |
MP3 Farms (Martin Farms) |
526 S Williamsport Rd |
|
Williamsport |
IN |
47,993 |
Warren |
7860 N 900 W |
|
Ambia |
IN |
47917 |
Warren |
765-437-1384 |
|
N |
|
|
Heliene |
Heliene 144HC M10 Bifacial 540 |
AP Systems |
DS3 |
93 |
1 |
|
|
|
15 |
|
|
16 |
372 |
124 |
|
163.86 |
200.88 |
Warren County R.E.M.C. |
|
|
|
|
Finalize |
N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
12/22 – gave the OK to proceed with Interconnection and Permit process.
Account Number for Warren County R.E.M.C. – 804000
12/28 – Sq.Ft. is 10,462.5 and MW =0.1674 MW
1/3 – spoke with John from Zoning. Said just need to fill out the building permit and would have a fee of $200 unless told otherwise.
1/5 – sent John from Zoning the application with the one line, distance, and site pictures.
1/9 – Warren Co. REMC application sent in. Under review since system is larger than 25 kW. Will need to fill out a Wabash Valley APP
1/15 – ON HOLD until Jim speaks finds out the electrician for the change in the 3p to single phase
1-17 – John from Warren Co building sent out approved permit paperwork in the mail.
1/24- Got word to move forward. Interconnection needs updated – messaged WCREMC for turning in a new app
2/22 – Wabash Valley application submitted.
4/12 – Study needs to be done by engineers that will cost $5k. Jim reached out to Brian Martin to see what he would like to do.
5/10 – Brian talking to engineers about moving forward with the study. |
|
12/26/2023 04:44 PM |
3,005 |
Edit |
11/14/2024 |
Kacie Pugh |
Mark Luedke |
01/09/2024 |
Artesia Brewing |
Artesia Brewing |
|
|
|
|
|
|
384 E 1200 N Rd |
|
Thawville |
IL |
60969 |
Iriquois |
217-249-2509 |
|
N |
06/27/2024 |
11/20/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
24 |
|
|
|
|
2 |
|
|
2 |
48 |
16 |
123 |
21.12 |
25.44 |
Eastern Illini Electric Cooperative |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
Mark sent updated paperwork on 1/8
** no PW
1/11 – sent paperwork |
This is an expansion. There is an existing system on the roof of one of the buildings.
8/21 EIEC approved to construct |
01/09/2024 09:31 PM |
3,007 |
Edit |
03/29/2024 |
Laura Lewis |
Mark Luedke |
01/10/2024 |
Mark Waldbeser |
Mark Waldbeser |
|
|
|
|
|
|
716 E 300 N |
|
Loda |
IL |
60948 |
Iriquois |
815-383-2931 |
|
N |
01/10/2024 |
06/17/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
45 |
|
|
1 |
|
3 |
|
|
4 |
90 |
30 |
120 |
39.60 |
47.70 |
Eastern Illini Electric Cooperative |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
WORKING ON PERMIT – 2/2/24
1/10 – sent paperwork
1/10 Received signed paperwork
1/15 – Sent in interconnection to EIEC
1/22 – under an engineering study
2/1 – approval from EIEC. |
|
01/10/2024 05:59 PM |
3,008 |
Edit |
03/14/2024 |
Kacie Pugh |
Mark Luedke |
01/10/2024 |
Deb Draper |
|
125 Pawnee Dr |
|
Loda |
IL |
60,948 |
Iriquois |
|
|
|
|
|
|
217-898-6896 |
|
N |
|
06/20/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
6 |
1 |
|
|
|
|
|
|
1 |
12 |
4 |
124 |
5.28 |
6.36 |
EIEC |
|
|
|
|
Cold |
N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
Y |
1/10 – sent BOS, SDF, SCA, Going Solar flyer, and Unavailability of Net Metering Form |
|
01/10/2024 07:51 PM |
3,006 |
Edit |
01/15/2024 |
Kacie Pugh |
Mark Luedke |
01/10/2024 |
Mark Waldbeser |
DO NOT USE THIS ONE - DUPLICATE |
716 E 300 N Rd |
|
Loda |
IL |
60,948 |
Iriquois |
|
|
|
|
|
|
815-383-2931 |
|
N |
|
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
45 |
|
|
1 |
|
3 |
|
|
4 |
90 |
30 |
|
39.60 |
47.70 |
EIEC |
|
|
|
|
Draft |
N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
Y |
|
|
01/10/2024 04:53 PM |
3,009 |
Edit |
05/16/2024 |
Ericka Tyler |
Mark Luedke |
01/15/2024 |
Larry Moss |
|
16605 E 2650 N Rd |
|
Danville |
IL |
61,834 |
Vermilion |
16605 E 2650 N Rd |
|
Danville |
IL |
61834 |
Vermilion |
217-474-7305 |
|
N |
|
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 & DS3-L |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
|
10.00 |
12.72 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
1/11 Sent SDF, BOS and SCA to customer for signature. |
1/23/24 Interconnection submitted DER-33311 |
01/15/2024 02:12 PM |
3,010 |
Edit |
09/16/2024 |
Ericka Tyler |
Mark Luedke |
01/15/2024 |
Jerry Neukomm |
|
1167 E 700 N Rd |
|
Cissna Park |
IL |
60,924 |
Iriquois |
1167 E 700 N Rd |
|
Cissna Park |
IL |
60924 |
Iriquois |
815-867-0150 |
|
N |
01/17/2024 |
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
36 |
|
|
|
|
3 |
|
|
3 |
72 |
24 |
|
31.68 |
38.16 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
N |
Y |
N |
N |
Y |
1/11 Sent customer SDF, BOS and SCA to sign.
2/12 Interconnection submitted DER-34049 |
|
01/15/2024 02:20 PM |
3,011 |
Edit |
12/03/2024 |
Ericka Tyler |
Mark Luedke |
01/15/2024 |
Paul Doyle |
|
2489 County Road 550 E |
|
Dewey |
IL |
61,840 |
Champaign |
2489 County Road 550 E |
|
Dewey |
IL |
61840 |
Champaign |
815-474-5260 |
|
N |
01/17/2024 |
07/01/2024 |
Heliene |
Heliene 144HC M10 Bifacial 540 |
AP Systems |
DS3 & DS3-L |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
162 |
10.00 |
12.96 |
Eastern Illini Coop |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
N |
N |
N |
N |
Y |
|
|
01/15/2024 02:45 PM |
3,012 |
Edit |
04/23/2024 |
Ericka Tyler |
Mark Luedke |
01/15/2024 |
Robert Geddes |
Robert Geddes |
2382 E 00 N Rd |
|
Hoopeston |
IL |
60,942 |
Vermilion |
2382 E 00 N Rd |
|
Hoopeston |
IL |
60942 |
Iriquois |
217-495-1943 |
|
N |
|
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
|
10.56 |
12.72 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
1/15 Sent SDF, SCA and BOS to customer to sign. Customer has an existing solar system located north of where the new system will be placed.
1/30 Submitted Ameren application DER-33539. Still waiting on signed paperwork from customer. Mark has to take it to him to sign. |
|
01/15/2024 04:45 PM |
3,013 |
Edit |
02/16/2024 |
Kacie Pugh |
Mark Luedke |
01/16/2024 |
Kenneth and Bette Schmid |
Shmid |
713 Trego Dr. |
|
Hoopeston |
IL |
60,942 |
Vermilion |
|
|
|
IL |
|
|
217-304-3003 |
|
N |
|
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3(7) and DS3-L(5) |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
106 |
10.00 |
12.72 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
Ameren Acct# 9169039143
Ameren Meter #72453159
In Grant Township – no building setbacks
Ameren Approved 1/24 |
** HAS 7 DS3 inverters and 5 DS3-L inverters. |
01/16/2024 07:21 PM |
3,014 |
Edit |
08/07/2024 |
Ericka Tyler |
Mark Luedke |
01/17/2024 |
Erin and Christopher Soppet |
Erin Soppet |
2330 CR 2200 E |
|
Saint Joseph |
IL |
61,873 |
Champaign |
2330 CR 2200 E |
|
Saint Joseph |
IL |
61873 |
Champaign |
2176497200 |
|
N |
|
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
27 |
|
|
3 |
|
|
|
|
3 |
54 |
18 |
|
23.76 |
28.62 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
N |
Y |
N |
N |
Y |
1/17 sent IL Shines paperwork to customer for signature
2/4 Interconnection submitted to Ameren DER-34156
2/15 Site plan shows arrays sitting in the floodplain need to see if customer wants to move them or proceed with Floodplain permit. |
|
01/17/2024 07:10 PM |
3,016 |
Edit |
12/16/2024 |
Kacie Pugh |
Mark Luedke |
01/23/2024 |
David Baughman |
David Baughman |
1305 N CR 200 E |
2 Fieldcrest Dr Monticello Il 61856 |
Cisco |
IL |
61,830 |
Piatt |
1305 N CR 200 E |
|
Cisco |
IL |
61830 |
Piatt |
217-778-6751 |
|
N |
|
07/10/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3(7) and DS3-L(5) |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
183 |
10.00 |
12.72 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
N |
Y |
Ameren Acct. # 0973145840
Ameren meter #25906371
** House has not been built yet. David sent a rough drawn site plan of where structures will go!**
Mailing address line 2 is what the address is on the parcel card
1/22 – sent paperwork.
1/23 – received signed paperwork.
Interconnection sent in – 1/3
1/29 – interconnection has been resubmitted for review with correct account number. & payment was received at the building department.
2/20 -Resent the building permit/the fee has been paid |
|
01/23/2024 02:28 PM |
3,017 |
Edit |
02/08/2024 |
Kacie Pugh |
Mark Luedke |
01/23/2024 |
Rick White |
|
19696 E 3100 N Rd |
|
Rossville |
IL |
60,963 |
Vermilion |
|
|
|
|
|
|
2174743706 |
|
N |
|
|
Heliene |
144M-530-HC-M10-BF-SL |
|
|
|
|
|
1 |
|
1 |
|
|
2 |
42 |
14 |
112 |
|
|
EIEC |
|
|
|
|
Draft |
N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
Y |
EIEC #690300100
1/24 – BOS, EIEC App and Agreement, SDF Created
1/26 – paperwork sent |
|
01/23/2024 07:54 PM |
3,018 |
Edit |
04/12/2024 |
Ericka Tyler |
Patty/Steve |
01/29/2024 |
Franklin Electric |
Franklin Electric |
|
|
|
|
|
|
9255 Coverdale Rd |
|
Fort Wayne |
IN |
46809 |
|
|
|
N |
|
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
QT2 480 |
732 |
|
|
|
|
122 |
|
|
122 |
2,928 |
976 |
|
|
|
|
|
|
|
|
Draft |
N |
N |
N |
N |
N |
X |
N |
N |
N |
N |
N |
|
Found the system information on the proposed solar with Shambaugh Electric spreadsheet and Solar Quote Shambaugh Electric. |
01/29/2024 04:50 PM |
3,019 |
Edit |
02/05/2024 |
Ericka Tyler |
Jim Straeter |
01/29/2024 |
Pearl |
DO NOT USE THIS ONE - DUPLICATE |
|
|
|
|
|
|
248 W Main St |
|
Fort Wayne |
IN |
46802 |
|
|
|
N |
|
|
Heliene |
144M-530-HC-M10-BF-SL |
|
|
|
|
|
|
|
|
|
|
0 |
0 |
0 |
|
210.94 |
198.00 |
|
|
|
|
|
Draft |
N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
Y |
Patty and Steve are handling the permitting for this project. Information is under Jim’s prospects. |
398 Panels/110 Inverters – Roof mount system |
01/29/2024 05:09 PM |
3,020 |
Edit |
06/05/2024 |
Ericka Tyler |
Jim Straeter |
01/29/2024 |
Bridge of Grace Inc |
|
|
|
|
|
|
|
5100 Gaywood Drive |
|
Fort Wayne |
IN |
46826 |
|
|
|
N |
|
|
Heliene |
144M 530 HC M10 BF S |
AP Systems |
QT2 208 |
57 |
|
|
|
|
|
|
|
0 |
0 |
0 |
|
98.50 |
119.25 |
|
|
|
|
|
Finalize |
Y |
N |
N |
Y |
Y |
X |
Y |
Y |
N |
N |
N |
Jim’s customer but Patty & Steve are taking care of the paperwork. |
225 MN Panels, 57 QT2 208 Inverter |
01/29/2024 06:36 PM |
3,021 |
Edit |
06/05/2024 |
Ericka Tyler |
Jim Straeter |
01/29/2024 |
Pearl Street Arts Center |
PSAC |
|
|
|
|
|
|
234 Pearl Street |
|
Fort Wayne |
IN |
46802 |
Allen |
|
|
N |
|
|
Heliene |
144M 530 HC M10 BF S |
|
|
85 |
|
|
|
|
|
|
|
0 |
0 |
0 |
|
|
|
|
|
|
|
|
Finalize |
Y |
N |
N |
Y |
Y |
X |
Y |
Y |
N |
N |
N |
|
324 MN Panels, 85 QT2 Jim not sure of voltage 208 or 480 |
01/29/2024 06:56 PM |
3,022 |
Edit |
01/30/2024 |
Ericka Tyler |
Jim Straeter |
01/30/2024 |
Thieneman Construction - Portage Treatment Plant |
Portage Treatment Plant |
521 W 84th Dr |
|
Merrillville |
IN |
46,410 |
|
5500 Old Porter Rd |
|
Portage |
IN |
46368 |
|
574-249-2662 |
|
N |
|
|
Heliene |
144M-530-HC-M10-BF-SL |
|
QT2 480 |
438 |
|
|
|
|
73 |
|
|
73 |
1,752 |
584 |
|
788.40 |
937.52 |
|
|
|
|
|
Draft |
N |
N |
N |
N |
N |
X |
N |
N |
N |
N |
N |
|
This is a parts only job. |
01/30/2024 01:40 PM |
3,023 |
Edit |
07/09/2024 |
Ericka Tyler |
Mark Luedke |
01/30/2024 |
Louise Hogan |
Louise Hogan |
374 E 1200 N Rd |
|
Thawville |
IL |
60,968 |
Iriquois |
374 E 1200 N Rd |
|
Thawville |
IL |
60968 |
Iriquois |
317-294-2647 |
|
N |
|
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
6 |
1 |
|
|
|
|
|
|
1 |
12 |
4 |
|
5.28 |
6.36 |
Eastern Illini Coop |
|
|
|
|
Review |
N |
N |
Y |
N |
N |
Y |
N |
N |
N |
N |
Y |
On hold until parcel info is taken care of. 7/9 |
|
01/30/2024 04:33 PM |
3,024 |
Edit |
06/05/2024 |
Kacie Pugh |
Mike Straeter |
02/02/2024 |
Berne Hi-Way Hatchery |
Berne Hi-Way Hatchery |
|
|
|
|
|
|
127 E 800 S |
|
Geneva |
IN |
46740 |
Adams |
260-726-0898 |
|
N |
|
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
QT2 208 |
|
|
|
|
|
|
26 |
|
26 |
676 |
208 |
|
|
|
|
|
|
|
|
Finalize |
Y |
N |
N |
Y |
Y |
N |
N |
Y |
N |
N |
Y |
1/25 – invoice |
|
02/02/2024 01:23 PM |
3,026 |
Edit |
06/03/2024 |
Ericka Tyler |
Gary Rosen |
02/05/2024 |
Dennis Rakers |
Dennis Rakers |
11610 Chad St |
|
Aviston |
IL |
62,216 |
Clinton |
11610 Chad St |
|
Aviston |
IL |
62216 |
Clinton |
618-799-9986 |
|
N |
|
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
18 |
|
|
2 |
|
|
|
|
2 |
36 |
12 |
|
15.84 |
19.08 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
|
|
02/05/2024 04:34 PM |
3,027 |
Edit |
10/10/2024 |
Kacie Pugh |
Gary Rosen |
02/14/2024 |
Randy Maul |
|
6138 Triple Lakes Rd |
|
Millstadt |
IL |
62,260 |
St Clair |
|
|
|
|
|
|
|
|
N |
|
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3(7) and DS3-L(5) |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
|
10.00 |
12.72 |
Monroe County Electric Cooperative |
|
|
|
|
Cold |
N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
Y |
2/14 – received paperwork2/15 - sent paperwork, stated building permit |
|
02/14/2024 03:53 PM |
3,028 |
Edit |
08/22/2024 |
Kacie Pugh |
Mark Luedke |
02/19/2024 |
Chesterville Trucking LLC |
|
356 N County Rd 425 E |
|
Arthur |
IL |
61,911 |
Douglas |
420 E CR 370 N |
|
Arthur |
IL |
61911 |
Douglas |
2172543470 |
|
Y |
|
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
QT2 208 |
30 |
|
|
6 |
|
|
|
|
6 |
108 |
36 |
|
51.84 |
55.65 |
|
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
2/19 – Received quote
2/21 – SENT PAPERWORK
2/22 – need to revise all paperwork. Wrong address.
2/22 – sent revised paperwork back. Waiting on mark for Tie-in on property
** Property card does not have the 420 Address on it. Will need to use coordinates for IL Shines.
4/2 – under review for Ameren |
|
02/19/2024 03:54 PM |
3,029 |
Edit |
08/28/2024 |
Ericka Tyler |
Jim Straeter |
02/21/2024 |
Voss Automotive |
|
4640 Hillegas Rd |
|
Ft Wayne |
IN |
46,818 |
Allen |
4640 Hillegas Rd |
|
Ft Wayne |
IN |
46818 |
Allen |
|
260-446-3144 |
N |
|
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
QT2 480 |
|
|
|
|
|
27 |
|
|
27 |
648 |
216 |
|
|
|
|
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
X |
Y |
Y |
N |
N |
N |
|
|
02/21/2024 05:25 PM |
3,030 |
Edit |
07/19/2024 |
Laura Lewis |
Mark Luedke |
02/20/2024 |
Tony and Katie Brooks |
Tony and Katie Brooks |
|
|
|
|
|
|
194 Apache Drive |
|
Georgetown |
IL |
61846 |
Vermilion |
217-918-3828 |
|
N |
|
07/19/2024 |
Heliene |
144M-530-HC-M10-BF-S |
AP Systems |
DS3 |
21 |
0 |
0 |
1 |
0 |
1 |
0 |
0 |
2 |
42 |
14 |
|
18.48 |
22.26 |
Ameren Illinois |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
DER-39653 |
|
02/21/2024 08:36 PM |
3,031 |
Edit |
06/03/2024 |
Kacie Pugh |
Jim Straeter |
02/23/2024 |
Bruce Limbach |
|
3220 W Waupecan Rd |
|
Verona |
IL |
60,479 |
Grundy |
|
|
|
|
|
|
|
|
N |
|
|
Longi and Heliene |
36-LR4, 10-LR5, 2-Heliene 530 |
AP Systems |
DS3 |
24 |
|
|
|
|
2 |
|
|
2 |
48 |
16 |
|
21.12 |
21.76 |
ComEd |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
Using Longi Panels
Bruce doing electrical work
Longi LR4 (435W) qty.36; Longi LR5 (540W) qty.10; Heliene (530W) qty. 2
interconnection submitted 3/15 |
|
02/23/2024 05:12 PM |
3,032 |
Edit |
05/01/2024 |
Kacie Pugh |
Mark Luedke |
03/06/2024 |
Stephen and Christina Schilling |
Stephen Schilling |
1813 1000th Street |
|
Lincoln |
IL |
62,656 |
Logan |
|
|
|
|
|
|
217-737-0609 |
|
N |
|
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3(7) and DS3-L(5) |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
|
10.00 |
12.72 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
Ameren Account #2642442003
Ameren Meter #72 350 280
3/19 received signed paperwork. |
|
03/06/2024 04:01 PM |
3,033 |
Edit |
12/03/2024 |
Kacie Pugh |
Mark Luedke |
03/06/2024 |
David Jorgenson |
David Jorgenson |
2553 E 1170 N Rd |
|
Milford |
IL |
60,953 |
Iriquois |
|
|
|
|
|
|
815-471-4882 |
|
N |
|
|
Heliene |
Heliene 144HC M10 Bifacial 540 |
AP Systems |
DS3 |
21 |
|
|
1 |
|
1 |
|
|
2 |
42 |
14 |
|
18.48 |
22.68 |
EIEC |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
N |
N |
N |
N |
Y |
EIEC #
Paperwork sent 3/7, received signed SDF |
|
03/06/2024 07:51 PM |
3,034 |
Edit |
11/13/2024 |
Kacie Pugh |
Doug Smith |
03/22/2024 |
NRP of Indiana Inc. |
|
P.O. Box 394 |
|
Johnston |
IA |
50,131 |
Johnson |
4 McGeath Blvd. |
|
Montpelier |
IN |
47359 |
Blackford |
|
5152530943 |
N |
|
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
QT2 480 |
555 |
1 |
|
|
|
92 |
|
|
93 |
2,220 |
740 |
|
999.00 |
1,176.60 |
AEP |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
X |
Y |
Y |
N |
N |
N |
|
|
03/22/2024 03:50 PM |
3,035 |
Edit |
05/22/2024 |
Kacie Pugh |
Mark Luedke |
03/22/2024 |
Banner Farms Inc. |
Norbert Soltwedel |
18991 N 900th Street |
|
Shumway |
IL |
62,461 |
Effingham/City |
|
|
|
|
|
|
217-868-2833 |
|
N |
|
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
18 |
|
|
2 |
|
|
|
|
2 |
36 |
12 |
|
15.84 |
19.08 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
N |
Y |
N |
N |
Y |
Ameren Account #0007162009
Ameren Meter #71832816
Banner Farms Inc. – Who will be paying for the system!! 3/26 |
|
03/22/2024 05:02 PM |
3,036 |
Edit |
09/19/2024 |
Ericka Tyler |
Mark Luedke |
03/26/2024 |
Monticello Methodist Church |
|
2020 E Washington St |
|
Monticello |
IL |
61,856 |
Piatt |
2020 E Washington St |
|
Monticello |
IL |
61856 |
Piatt |
|
217-762-2579 |
Y |
05/22/2024 |
|
Heliene |
144HC-M6-450 BIFACIAL MAX SERI |
AP Systems |
QT2 480 |
84 |
|
|
|
|
14 |
|
|
14 |
336 |
112 |
|
151.20 |
178.08 |
Ameren |
|
|
|
|
Cold |
N |
N |
Y |
S |
Y |
Y |
N |
N |
N |
N |
Y |
* This project is in the City of Monticello IL so all permits will be through them not the County.
DER-39750
9/19 Church decided not to build solar at this time. They could not get the funding. |
|
03/26/2024 07:40 PM |
3,037 |
Edit |
10/16/2024 |
Kacie Pugh |
Mark Luedke |
04/09/2024 |
Reffett Properties, LLC |
Reffett Properties |
17503 E 3060 N |
|
Alvin |
IL |
61,811 |
Vermilion |
|
|
|
|
|
|
2179184120 |
|
N |
|
08/26/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
21 |
|
|
1 |
|
1 |
|
|
2 |
42 |
14 |
|
18.50 |
22.30 |
Ameren |
|
|
|
|
Cold |
N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
Y |
Ameren customer
Sent paperwork 4/9
Mark to meet with customer about plan and tie in |
|
04/09/2024 03:09 PM |
3,038 |
Edit |
12/03/2024 |
Kacie Pugh |
Mark Luedke |
04/09/2024 |
Christopher McMahon |
|
3141 E Main St. |
|
Danville |
IL |
61,834 |
Vermilion |
|
|
|
|
|
|
2173041249 |
|
N |
07/02/2024 |
08/27/2024 |
Heliene |
Heliene 144HC M10 Bifacial 535 |
AP Systems |
DS3 |
21 |
|
|
1 |
|
1 |
|
|
2 |
42 |
14 |
|
18.50 |
22.30 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
Ameren Acct #2487088011
Ameren Meter #72650521
4/8 – Mark meeting with customer this week for tie-in info |
|
04/09/2024 03:22 PM |
3,040 |
Edit |
09/19/2024 |
Kacie Pugh |
Curt Dambman |
04/13/2024 |
Ed Alber |
Ed Alber |
17564 Ridge Rd. |
|
Sterling |
IL |
61,081 |
Whiteside |
|
|
|
|
|
|
815-716-3659 |
|
N |
04/24/2024 |
08/27/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
9 |
|
|
1 |
|
|
|
|
1 |
18 |
6 |
|
7.92 |
9.54 |
ComEd |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
Sent paperwork – 4/10
4/11 – received SDF, but not the rest of the paperwork. |
|
04/13/2024 01:07 PM |
3,041 |
Edit |
08/16/2024 |
Kacie Pugh |
Curt Dambman |
04/13/2024 |
Dave and Sandy Shetler |
Shetler, Dave and Sandy |
28390 Knief Rd. |
|
Montmorency |
IL |
61,071 |
Whiteside |
|
|
|
|
|
|
815-441-2032 |
|
N |
04/24/2024 |
08/28/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
9 |
|
|
1 |
|
|
|
|
1 |
18 |
6 |
|
7.92 |
9.54 |
ComEd |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
Paperwork sent 4/10 |
|
04/13/2024 01:10 PM |
3,042 |
Edit |
06/24/2024 |
Ericka Tyler |
Curt Dambman |
04/17/2024 |
Brad Cate |
|
7225 Scenic Bluff Rd |
|
Savanna |
IL |
61,074 |
Carroll |
7225 Scenic Bluff Rd |
|
Savanna |
IL |
61074 |
Carroll |
302-856-1853 |
|
N |
|
|
Heliene |
144HC M10 Bifacial 530W |
AP Systems |
DS3 |
15 |
1 |
|
1 |
|
|
|
|
2 |
30 |
10 |
|
13.20 |
15.90 |
Jo-Carroll Energy |
|
|
|
|
Cold |
N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
Y |
Per Jim customer went with different installer 6/24/24 |
|
04/17/2024 05:55 PM |
3,043 |
Edit |
09/26/2024 |
Kacie Pugh |
Homan Inc |
04/18/2024 |
ERS Farms LLC |
Hog Barn - ERS Farm LLC |
|
|
|
|
|
|
2081Ellis Rd |
|
New Weston |
OH |
45348 |
Darke |
937-581-9545 |
|
N |
|
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
18 |
1 |
|
|
|
1 |
|
|
2 |
36 |
12 |
127 |
15.64 |
19.08 |
AEP Ohio |
|
|
|
|
Finalize |
Y |
N |
N |
Y |
Y |
X |
N |
Y |
N |
N |
Y |
Hog Barn |
|
04/18/2024 06:14 PM |
3,044 |
Edit |
05/16/2024 |
Kacie Pugh |
Homan Inc |
04/18/2024 |
Sean Gerber |
Sean Gerber (Part of Harrod group) |
|
|
|
|
|
|
2051 Ellis Rd |
|
New Weston |
OH |
45348 |
Darke |
|
|
N |
|
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
127 |
10.56 |
12.72 |
AEP Ohio |
|
|
|
|
Cold |
N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
Residential
Sean is Tom Harrod’s son-in-law |
Next door to the ERS Farm LLC install |
04/18/2024 06:21 PM |
3,045 |
Edit |
07/19/2024 |
Kacie Pugh |
Homan Inc |
04/18/2024 |
BCS Farms LLC |
Hog Barn - BCS Farm LLC |
|
|
|
OH |
|
|
2136 Brock Cosmos Rd. |
|
Rossburg |
OH |
43562 |
Darke |
9375819545 |
|
N |
|
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
36 |
|
|
|
|
3 |
|
|
3 |
72 |
24 |
128 |
31.68 |
38.16 |
Darke Electric Rural Cooperative |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
X |
Y |
Y |
N |
N |
Y |
|
|
04/18/2024 06:29 PM |
3,046 |
Edit |
12/11/2024 |
Laura Lewis |
Doug Smith |
04/19/2024 |
Kevin Bogard |
|
|
|
|
|
|
|
11871 N 1200th Street |
|
Robinson |
IL |
62454 |
Crawford |
419-889-0616 |
|
N |
|
09/05/2024 |
Heliene |
Heliene 144HC M10 Bifacial 540 |
AP Systems |
7DS3/5DS3L |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
212 |
10.00 |
12.96 |
Norris Electric Cooperative |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
N |
Y |
N |
N |
Y |
Site address is tillable land in Dodie Lynn Bogard Trust. See Property Record Card in customer file for more info. We will need a mailing address for SREC Incentive Payment delivery and customer contact. 4/19 LL |
|
04/19/2024 06:37 PM |
3,047 |
Edit |
05/20/2024 |
Ericka Tyler |
Jim Straeter |
04/24/2024 |
Michael Ruffatto |
|
728 State Route 126 |
|
Plainfield |
IL |
60,544 |
Kendall |
728 State Route 126 |
|
Plainfield |
IL |
60544 |
Kendall |
815-405-9954 |
|
N |
04/19/2024 |
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
18 |
|
|
2 |
|
|
|
|
2 |
36 |
12 |
|
15.84 |
19.08 |
ComEd |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
4/24/24 Added verbiage to contract that customer can decline to moved forward with project if system not installed by 12/1/24. Do not submit Part I to IL Shines until system installed. |
|
04/24/2024 02:02 PM |
3,048 |
Edit |
10/10/2024 |
Kacie Pugh |
Mark Luedke |
04/26/2024 |
VCCD - Gannet Ed Center |
|
22296 A Henning Rd |
|
Danville |
IL |
619,834 |
Vermilion |
20301 E 900 N Rd |
|
Westville |
IL |
61883 |
Vermilion |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Finalize |
N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
Y |
Address was given 5/2
Waiting on name change on Utility bill |
|
04/26/2024 05:39 PM |
3,049 |
Edit |
07/29/2024 |
Ericka Tyler |
Homan Inc |
04/30/2024 |
Harrod & Harrod Farms |
|
12169 Cochran Rd |
|
Rossburg |
OH |
43,562 |
Darke |
12169 Cochran Rd |
|
Rossburg |
OH |
43562 |
Darke |
937-581-9545 |
|
N |
|
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
60 |
2 |
|
|
|
4 |
|
|
6 |
120 |
40 |
|
|
|
Darke County REC |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
X |
Y |
Y |
N |
N |
N |
4/30 Interconnection has been started with Darke REC, need one line diagrams. There are two applications for utility since there are two separate meters.
*There will only be one building permit as the system will sit on one parcel in Darke County.
5/1 No bldg or zoning permit needed since property is AG. Will need electrical waiver form from utility. |
There are two utility meters being used. One system will have 1 12-panel and 1 24-panel array on it for a total AC size of 15.64kW and DC size of 19.08kW. The second system will have 1 12-panel and 3 24-panel arrays on it for a total AC size of 36.96kW and DC size of 44.52kW. |
04/30/2024 03:56 PM |
3,050 |
Edit |
07/09/2024 |
Ericka Tyler |
Mark Luedke |
05/03/2024 |
Randall Loschen |
|
2629 County Road 1800 N |
|
Ogden |
IL |
61,859 |
Champaign |
2629 County Road 1800 N |
|
Ogden |
IL |
61859 |
Champaign |
217-841-2961 |
|
N |
|
|
Heliene |
144HC-M6-450 BIFACIAL MAX SERI |
AP Systems |
DS3 |
21 |
|
|
1 |
|
1 |
|
|
2 |
42 |
14 |
|
18.48 |
22.26 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
5/7/24 – Submitted Ameren interconnection application DER-38665 |
|
05/03/2024 05:38 PM |
3,051 |
Edit |
11/18/2024 |
Ericka Tyler |
Mark Luedke |
05/03/2024 |
Kelly Brothers |
Grain Bin Site |
|
|
|
|
|
|
9336 E 2500 N Rd |
|
Cornell |
IL |
61319 |
Livingston |
8153434219 |
|
N |
05/08/2024 |
|
Heliene |
144HC-M6-450 BIFACIAL MAX SERI |
AP Systems |
QT2 208 |
12 |
|
|
|
|
2 |
|
|
2 |
48 |
16 |
|
20.74 |
25.44 |
ComEd |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
N |
Y |
N |
N |
Y |
|
|
05/03/2024 05:42 PM |
3,052 |
Edit |
11/13/2024 |
Kacie Pugh |
Curt Dambman |
05/06/2024 |
A.W. Alber |
Hog Barn |
17729 Tampico Rd |
|
Sterling |
IL |
61,083 |
White |
17855 Ridge Rd |
|
Sterling |
IL |
61081 |
Whiteside |
815-716-3666 |
|
Y |
05/14/2024 |
09/25/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
24 |
|
|
|
|
2 |
|
|
2 |
48 |
16 |
|
21.12 |
25.44 |
ComEd |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
Using Ed’s email as Albert does not have an email address. |
|
05/06/2024 06:24 PM |
3,053 |
Edit |
08/28/2024 |
Kacie Pugh |
Mark Luedke |
05/08/2024 |
David Sasse |
David Sasse |
1709 2000th Ave |
|
Beason |
IL |
62,512 |
Logan |
|
|
|
|
|
|
2177370074 |
|
N |
05/09/2024 |
09/18/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
24 |
|
|
|
|
2 |
|
|
2 |
48 |
16 |
197 |
21.12 |
25.44 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
Ameren Acct# 6149251372
Ameren Meter# 72319005 |
|
05/08/2024 12:34 PM |
3,054 |
Edit |
11/14/2024 |
Laura Lewis |
Doug Smith |
05/09/2024 |
Tim Wilcox |
Tim Wilcox |
1168 E 700 N |
|
Cissna Park |
IL |
60,924 |
Iriquois |
1168 E 700 N |
|
Cissna Park |
IL |
60924 |
Iriquois |
217-219-0375 |
|
N |
05/09/2024 |
10/01/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
48 |
|
|
|
|
4 |
|
|
4 |
96 |
32 |
120 |
42.24 |
50.88 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
N |
Y |
N |
N |
Y |
Tim Wilcox is the SIL of Greg Muehling. He has contact the Iroquois Co office regarding the array location on the property line and gotten the ok to place them there. They should know when we call in. |
Customer is combing house and farm meters and placing them in his name. |
05/09/2024 08:38 PM |
3,055 |
Edit |
07/19/2024 |
Kacie Pugh |
Mark Luedke |
05/10/2024 |
Madison Frerichs |
Frerichs |
2321 CR 1950 N |
|
Saint Joseph |
IL |
61,873 |
Champaign |
|
|
|
|
|
|
2172026447 |
|
N |
|
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
21 |
|
|
1 |
|
1 |
|
|
2 |
42 |
14 |
|
18.48 |
22.26 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
Ameren Account #5621298018
Ameren Meter 72832041 |
|
05/10/2024 06:49 PM |
3,056 |
Edit |
05/15/2024 |
Ericka Tyler |
Doug Smith |
05/13/2024 |
Kevin Bogard - DON'T USE THIS ONE IT IS A DUPLICATE |
|
|
|
|
|
|
|
11871 North 1200th St |
|
Robinson |
IL |
62454 |
Crawford |
4198890616 |
|
N |
|
10/08/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 & DS3-L |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
|
10.00 |
12.72 |
Norris Electric Cooperative |
|
|
|
|
Draft |
N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
Y |
|
|
05/13/2024 07:43 PM |
3,059 |
Edit |
05/23/2024 |
Laura Lewis |
Matt Cowell |
05/22/2024 |
Biehl Farm |
|
|
|
|
|
|
|
5420 Schmidt Lane |
|
Belleville |
IL |
62220 |
St Clair |
618-604-3716 |
|
N |
|
10/15/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
QT2 208 |
24 |
|
|
|
|
4 |
|
|
4 |
96 |
32 |
349 |
41.47 |
50.88 |
|
|
|
|
|
Draft |
N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
Y |
Matt confirming which quote to move forward with and customer utility. LL 5/22 |
Matt confirming customer utility. LL 5/22 |
05/23/2024 12:34 PM |
3,060 |
Edit |
10/28/2024 |
Kacie Pugh |
Gary Rosen |
06/04/2024 |
Ramsour's Hardware / Farm Supply Inc. |
Ramsour Farm Store |
25518 State Route 161 |
|
Centralia |
IL |
62,801 |
Clinton |
|
|
|
|
|
|
16185334497 |
|
Y |
06/18/2024 |
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
36 |
|
|
|
|
3 |
|
|
3 |
72 |
24 |
|
31.86 |
38.12 |
CCEI |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
N |
Y |
N |
N |
Y |
Clinton County Electric Cooperative, Inc. – #46171300
Meter Number – 149710275 |
|
06/04/2024 03:00 PM |
3,061 |
Edit |
08/27/2024 |
Kacie Pugh |
Gary Rosen |
06/05/2024 |
Tony Sudholt |
Tony Sudholt |
11204 Aviston Rd |
|
Aviston |
IL |
62,216 |
Clinton |
|
|
|
|
|
|
618-795-8115 |
|
N |
06/10/2024 |
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
24 |
|
|
|
|
2 |
|
|
2 |
48 |
16 |
|
21.12 |
25.44 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
S |
Y |
Y |
N |
Y |
N |
N |
Y |
Ameren – 1641108172 Meter #25931983 |
|
06/05/2024 02:45 PM |
3,062 |
Edit |
09/20/2024 |
Laura Lewis |
Doug Smith |
06/06/2024 |
Dana and Judy Jolley - Farm Expansion |
Jolley Farm Expansion |
|
|
|
|
|
|
4347 E 1490 North Road |
|
Fithian |
IL |
61844 |
Vermilion |
217-474-3780 |
|
N |
05/25/2024 |
10/09/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
36 |
|
|
|
|
3 |
|
|
3 |
72 |
24 |
|
31.68 |
38.16 |
Ameren Illinois |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
N |
Y |
N |
N |
Y |
This site is located on the same parcel has their home system, but it will serve the meter to the farm. |
|
06/06/2024 09:03 PM |
3,063 |
Edit |
08/28/2024 |
Ericka Tyler |
Mark Luedke |
06/11/2024 |
Ben McCutcheon |
|
450 800th Ave |
|
Elkhart |
IL |
62,634 |
Logan |
450 800th Ave |
|
Elkhart |
IL |
62634 |
Logan |
2176718951 |
|
N |
|
10/22/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 & DS3-L |
12 |
2 |
|
|
|
|
|
|
2 |
24 |
8 |
|
10.00 |
12.72 |
Menard Electric Coop |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
|
|
06/11/2024 07:07 PM |
3,064 |
Edit |
11/13/2024 |
Laura Lewis |
Curt Dambman |
06/15/2024 |
Joel Stover |
Joel Stover |
|
|
|
|
|
|
4399 Otter-Creek Drive |
|
Milledgeville |
IL |
61051 |
Carroll |
480-250-3720 |
|
N |
|
10/24/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
250 |
10.56 |
12.72 |
ComEd |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
Needing site plan and customer email address to draw up contracts. 6/15
Curt sent docs and site plan 8/26 |
Confirming AC size. 6/15 |
06/15/2024 02:06 PM |
3,065 |
Edit |
12/16/2024 |
Laura Lewis |
Mark Luedke |
06/18/2024 |
Jeff LIttle |
Jeff Little |
|
|
|
|
|
|
1287 CR 600 N |
|
Tolono |
IL |
61880 |
Champaign |
217-369-5895 |
|
N |
07/03/2024 |
10/25/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
(7)DS3 / (5)DS3L |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
160 |
10.00 |
12.19 |
Eastern Illini Electric Cooperative |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Need rough drawn site plan. 6/18
Contracts sent for signing. 6/18 |
Utility approved max DC size is 12.19kW (23 panels). One DS3L will be half power, actual system AC size 9.616kW. Cash Flow annual energy output reflects this. |
06/18/2024 01:01 PM |
3,066 |
Edit |
11/25/2024 |
Kacie Pugh |
Mark Luedke |
06/18/2024 |
Mike Haag & Jeff Stark |
Haag/Stark |
|
|
|
|
|
|
22134 N 3200 E Rd |
|
Emington |
IL |
60934 |
Livingston |
815-674-6471 |
|
N |
|
|
Heliene |
Heliene 144HC M10 Bifacial 535 |
AP Systems |
DS3 |
66 |
1 |
|
|
|
5 |
|
|
6 |
132 |
44 |
|
58.08 |
69.96 |
ComEd |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
N |
Y |
N |
N |
Y |
10/8/24 – Customer has reviewed and spoke with Mark on the transformer upgrade. He is wanting to move forward, but wanting to make sure he can be in the Net Metering program before years end.
– Contacted ComEd and they responded: Desired in service date should be 180 calendar days out. We will not start any engineering design until we receive signed contract and payment. Per availability in the supply chain, we cannot guarantee transformer will be upgraded before 12/31/24. A project manager will be assigned after payment to guide you to completion of upgrade.
– Speaking with Jim on this, as to how to move forward as how the customer has paid $1500 to further the study. |
10/2024 – have to have transformer upgrade
Approved for install 10/17; let customer know where to send payment for transformer. |
06/18/2024 07:05 PM |
3,067 |
Edit |
09/16/2024 |
Kacie Pugh |
Mark Luedke |
06/18/2024 |
Dewaine Haag |
Dewaine Haag |
31860 E 2100 N Rd |
|
Emington |
IL |
60,934 |
Livingston |
|
|
|
|
|
|
815-674-6471 |
|
N |
08/09/2024 |
11/11/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
66 |
1 |
|
|
|
5 |
|
|
6 |
132 |
44 |
|
58.08 |
69.96 |
ComEd |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
N |
Y |
N |
N |
Y |
|
|
06/18/2024 07:10 PM |
3,068 |
Edit |
08/27/2024 |
Laura Lewis |
Justin Detmer |
06/18/2024 |
Melinda Alberternst-Dall |
Melinda Alberternst-Dall |
|
|
|
|
|
|
6500 Lee Road |
|
Trenton |
IL |
62293 |
Clinton |
6189104695 |
|
N |
06/22/2024 |
10/28/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
18 |
|
|
2 |
|
|
|
|
2 |
36 |
12 |
312 |
15.84 |
19.04 |
Ameren Illinois |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
N |
Y |
N |
N |
Y |
|
Property and utility accounts were in Melinda’s mother’s name, Anna. Switched to Melinda and her son, 6/17. Her son will be living there, but Melinda’s name is to be on everything. |
06/18/2024 09:08 PM |
3,069 |
Edit |
08/28/2024 |
Kacie Pugh |
Mark Luedke |
06/19/2024 |
Del Wagner |
Del Wagner |
1367 County Rd. 2500 N |
|
Thomasboro |
IL |
61,878 |
Champaign |
|
|
|
|
|
|
217-621-2133 |
|
N |
|
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
9 |
|
|
1 |
|
|
|
|
1 |
18 |
6 |
|
7.92 |
9.54 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
Ameren |
|
06/19/2024 07:54 PM |
3,071 |
Edit |
11/07/2024 |
Laura Lewis |
Gary Rosen |
06/24/2024 |
Randall Lauf |
Randy Lauf |
|
|
|
|
|
|
4513 Boyd Road |
|
Belleville |
IL |
62223 |
St Clair |
618-207-9150 |
|
N |
06/27/2024 |
10/30/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
18 |
|
|
2 |
|
|
|
|
2 |
36 |
12 |
344 |
15.84 |
19.08 |
Ameren Illinois |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
N |
Y |
N |
N |
Y |
|
|
06/24/2024 08:55 PM |
3,072 |
Edit |
08/28/2024 |
Kacie Pugh |
Mark Luedke |
06/25/2024 |
Emil Lagerhausen - 402 Site |
402 Site |
19253 N 800th St |
|
Shumway |
IL |
62,461 |
Effingham/City |
402 W Main St. |
|
Shumway |
IL |
62461 |
Effingham/City |
217-821-5644 |
|
N |
07/11/2024 |
11/19/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 & DS3-L |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
|
10.00 |
12.72 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
N |
Y |
Y |
Y |
Y |
N |
N |
Y |
Ameren Acct. # 9781039065
Ameren Meter # 71832815 |
|
06/25/2024 05:57 PM |
3,073 |
Edit |
08/28/2024 |
Kacie Pugh |
Mark Luedke |
06/25/2024 |
Emil Lagerhausen - 405 Site |
405 site |
19253 N 800th St |
|
Shumway |
IL |
62,461 |
Effingham/City |
405 E Beecher St. |
|
Shumway |
IL |
62461 |
Effingham/City |
217-821-5644 |
|
N |
07/02/2024 |
11/19/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 & DS3-L |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
|
10.00 |
12.72 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
N |
Y |
Y |
Y |
Y |
N |
N |
Y |
|
|
06/25/2024 06:00 PM |
3,074 |
Edit |
12/03/2024 |
Kacie Pugh |
Joel Davis |
06/25/2024 |
Matt and Danyelle Harman |
|
10978 N Wilkinson Rd. |
|
Mooreland |
IN |
47,360 |
WAYNE |
|
|
|
|
|
|
765-967-5011 |
|
N |
|
|
Heliene |
Heliene 144HC M10 Bifacial 540 |
AP Systems |
DS3 |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
|
10.56 |
12.96 |
|
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
X |
Y |
N |
N |
N |
Y |
Henry Co. REMC # 112505001
Meter # 34573274
* Need approved building permit to submit with interconnection.
** 8/1/24 – will need county inspection prior to energization. |
|
06/25/2024 06:38 PM |
3,076 |
Edit |
09/12/2024 |
Kacie Pugh |
Gary Rosen |
07/05/2024 |
Dennis & Jeanne Kuhl |
Dennis Kuhl |
14967 Cattle Pen Rd. |
|
Okawville |
IL |
62,271 |
Washington |
|
|
|
|
|
|
618-971-4785 |
|
N |
|
|
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 & DS3-L |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
|
10.00 |
12.72 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
N |
Y |
N |
N |
Y |
Ameren |
|
07/05/2024 06:55 PM |
3,077 |
Edit |
12/18/2024 |
Ericka Tyler |
Mike Straeter |
07/09/2024 |
Hog Heaven LLC |
|
7779 S County Farm Rd |
|
Claypool |
IN |
46,510 |
|
9708 S 100 E |
|
Claypool |
IN |
46510 |
Kosciusko |
|
|
N |
|
|
Heliene |
Heliene 144HC M10 Bifacial 540 |
AP Systems |
DS3 |
96 |
|
|
|
|
8 |
|
|
8 |
192 |
64 |
|
84.48 |
103.68 |
KREMC |
|
|
|
|
Finalize |
Y |
N |
N |
Y |
Y |
X |
N |
Y |
N |
N |
N |
|
|
07/09/2024 06:17 PM |
3,078 |
Edit |
07/16/2024 |
Ericka Tyler |
Mark Luedke |
07/12/2024 |
Danny and Linda Jent |
|
902 N CR 800 E |
|
Tuscola |
IL |
61,953 |
Douglas |
902 N CR 800 E |
|
Tuscola |
IL |
61953 |
Douglas |
2174939005 |
|
N |
|
11/25/2024 |
Heliene |
144HC-M6-450 BIFACIAL MAX SERI |
AP Systems |
DS3 |
10 |
|
|
|
|
1 |
|
|
1 |
20 |
8 |
|
8.80 |
10.60 |
Eastern Illini Coop |
|
|
|
|
Cold |
N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
Y |
|
|
07/12/2024 08:48 PM |
3,079 |
Edit |
12/03/2024 |
Ericka Tyler |
Patty/Steve |
07/17/2024 |
GKS Farms LLC |
|
14756 Road 48 |
|
Haviland |
OH |
45,851 |
|
15399 Road 48 |
|
Haviland |
OH |
45851 |
|
419-786-9542 |
|
N |
|
|
Heliene |
144HC M10 Bifacial 540W |
AP Systems |
DS3 |
276 |
|
|
|
|
23 |
|
|
23 |
552 |
184 |
|
242.88 |
298.08 |
|
|
|
|
|
Finalize |
N |
N |
N |
Y |
S |
X |
N |
N |
N |
N |
Y |
[email protected] |
|
07/17/2024 03:04 PM |
3,080 |
Edit |
11/13/2024 |
Laura Lewis |
Matt Cowell |
07/17/2024 |
Jodie Seipp |
Jodie Seipp |
|
|
|
|
|
|
853 Scott Troy Road |
|
Lebanon |
IL |
62254 |
St Clair |
618-910-9431 |
|
N |
07/22/2024 |
11/27/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
22 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
325 |
21.12 |
25.44 |
Ameren Illinois |
|
|
|
|
Finalize |
Y |
N |
N |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
Submitted interconnection app DER-46459 8/7
Need to have FD and utility approval before obtaining bldg permit. |
*Potential 535W install, issue COR once panel model is determined |
07/17/2024 06:10 PM |
3,081 |
Edit |
12/16/2024 |
Kacie Pugh |
Mark Luedke |
07/22/2024 |
Todd and Chris Nobbe |
Todd Nobbe |
1009 State Route 121 |
|
Lincoln |
IL |
62,656 |
Logan |
|
|
|
|
|
|
217-737-2020 |
|
N |
07/30/2024 |
12/17/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
18 |
|
|
2 |
|
|
|
|
2 |
36 |
12 |
|
15.84 |
19.08 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
N |
Y |
Email updated 7/23
Ameren Acct: 1325819029
Ameren Meter: 72256374 |
|
07/22/2024 01:52 PM |
3,083 |
Edit |
12/06/2024 |
Kacie Pugh |
Mark Luedke |
07/29/2024 |
Bruce Musson - Shop |
|
|
|
|
|
|
|
8194 E 2100 N Rd. |
|
Oakwood |
IL |
61858 |
Vermilion |
217-304-1125 |
|
N |
07/27/2024 |
12/10/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
18 |
|
|
2 |
|
|
|
|
2 |
36 |
12 |
|
15.84 |
19.08 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
N |
Y |
N |
N |
Y |
Ameren Acct#
Ameren Meter # |
|
07/29/2024 03:11 PM |
3,084 |
Edit |
11/14/2024 |
Kacie Pugh |
Mark Luedke |
07/29/2024 |
Bruce Musson - Home |
Bruce Musson - Home |
20919 M 830 E Rd |
|
Oakwood |
IL |
61,858 |
Vermilion |
|
|
|
|
|
|
2173041125 |
|
N |
07/29/2024 |
07/29/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
24 |
|
|
|
|
2 |
|
|
2 |
48 |
16 |
|
21.12 |
25.44 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
N |
Y |
N |
N |
Y |
Ameren |
|
07/29/2024 03:56 PM |
3,085 |
Edit |
10/28/2024 |
Ericka Tyler |
Gary Rosen |
07/31/2024 |
KMA Properties - Tot Spot |
Tot Spot |
17600 Saint Rose Rd |
|
Saint Rose |
IL |
62,230 |
Clinton |
17600 Saint Rose Rd |
|
Saint Rose |
IL |
62230 |
Clinton |
6189205713 |
|
N |
|
|
Heliene |
144HC M10 Bifacial 535W |
AP Systems |
DS3 |
27 |
|
|
3 |
|
|
|
|
3 |
54 |
18 |
|
23.76 |
28.89 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
N |
Y |
N |
N |
Y |
DER-46029
Need to apply for variance on property line setbacks. Requirement 25′ customer wants to be 5′. |
|
07/31/2024 03:15 PM |
3,086 |
Edit |
10/28/2024 |
Ericka Tyler |
Gary Rosen |
07/31/2024 |
KMA Properties |
|
14616 Russland Rd |
|
Aviston |
IL |
62,216 |
Clinton |
14616 Russland Rd |
|
Aviston |
IL |
62216 |
Clinton |
6189205713 |
|
N |
07/25/2024 |
|
Heliene |
144HC M10 Bifacial 535W |
AP Systems |
DS3 |
15 |
1 |
|
1 |
|
|
|
|
2 |
30 |
10 |
|
13.20 |
16.05 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
N |
Y |
N |
N |
Y |
DER-46026
Need to apply for variance on property line setbacks. Requirement 25′ and customer wants to be 5′. |
|
07/31/2024 04:51 PM |
3,087 |
Edit |
11/22/2024 |
Ericka Tyler |
Mark Luedke |
07/31/2024 |
Raymond Stoerger |
|
163 CR 400 N |
|
Ivesdale |
IL |
61,851 |
Champaign |
163 CR 400 N |
|
Ivesdale |
IL |
61851 |
Champaign |
2178410373 |
|
N |
07/30/2024 |
|
Heliene |
144HC M10 Bifacial 535W |
AP Systems |
DS3 |
18 |
|
|
2 |
|
|
|
|
2 |
36 |
12 |
|
15.84 |
19.26 |
Eastern Illini Coop |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
N |
N |
N |
Y |
Check parcel information may be inside of a village so permitting may be different. |
|
07/31/2024 06:32 PM |
3,088 |
Edit |
11/25/2024 |
Kacie Pugh |
Jim Straeter |
08/01/2024 |
Anna Tobias |
Anna Tobias |
16420 Garden Valley Rd |
|
Woodstock |
IL |
60,098 |
McHenry |
|
|
|
|
|
|
815-347-7857 |
|
Y |
07/20/2024 |
|
Heliene |
TopConn BiFacial 580W |
AP Systems |
DS3 |
48 |
|
|
|
|
4 |
|
|
4 |
96 |
32 |
|
42.24 |
55.68 |
ComEd |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
N |
Y |
N |
N |
Y |
** TopConn Panels |
|
08/01/2024 04:02 PM |
3,089 |
Edit |
11/13/2024 |
Kacie Pugh |
Mark Luedke |
08/02/2024 |
Jeff Vahlkamp |
Jeff Vahlkamp |
9764 Drum Hill |
|
Moscoutah |
IL |
62,258 |
St Clair |
|
|
|
|
|
|
3149208738 |
|
N |
|
12/16/2024 |
Heliene |
144M-530-HC-M10-BF-SL |
AP Systems |
DS3 |
21 |
|
|
1 |
|
1 |
|
|
2 |
42 |
14 |
|
18.48 |
22.26 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
ameren acct is 7543143000
ameren meter is 25893015 |
|
08/02/2024 06:03 PM |
3,090 |
Edit |
12/16/2024 |
Kacie Pugh |
Mike Straeter |
08/02/2024 |
Hayes Arboretum |
Hayes Arboretum |
801 Elks Rd. |
|
Richmond |
IN |
47,374 |
Wayne |
|
|
|
|
|
|
765-962-3745 |
|
N |
|
|
Heliene |
Heliene 144HC M10 Bifacial 540 |
AP Systems |
DS3(7) and DS3-L(5) |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
|
10.00 |
12.96 |
|
|
|
|
|
Finalize |
Y |
N |
N |
Y |
Y |
X |
N |
Y |
N |
N |
N |
City of Richmond Net metering app in customer file
* Will need to send disclaimer like Matt Harman application |
|
08/02/2024 07:15 PM |
3,091 |
Edit |
12/11/2024 |
Ericka Tyler |
Gary Rosen |
08/06/2024 |
Craig and Jessica Kuhl |
|
11801 Old State Rd |
|
Carlyle |
IL |
62,231 |
Clinton |
11801Old State Rd |
|
Calyle |
IL |
62231 |
Clinton |
618-781-6733 |
|
N |
|
12/18/2024 |
Heliene |
144HC M10 Bifacial 540W |
AP Systems |
DS3 |
21 |
|
|
1 |
|
1 |
|
|
2 |
42 |
14 |
|
18.48 |
22.68 |
Clinton Co Electric Coop |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
N |
Y |
N |
N |
Y |
|
|
08/06/2024 06:35 PM |
3,092 |
Edit |
12/03/2024 |
Kacie Pugh |
Patty/Steve |
08/07/2024 |
CM Swine - Micheal Brothers |
TROY Micheal |
|
|
|
|
|
|
8356 N 800 E |
|
North Manchester |
IN |
46962 |
Wabash |
260570-6432 |
|
N |
|
|
Heliene |
144HC M10 Bifacial 540W |
AP Systems |
DS3 |
72 |
|
|
|
|
6 |
|
|
6 |
144 |
48 |
|
63.36 |
77.76 |
Heartland REMC |
|
|
|
|
Finalize |
N |
N |
N |
S |
Y |
X |
N |
N |
N |
N |
Y |
|
|
08/07/2024 03:08 PM |
3,094 |
Edit |
12/03/2024 |
Kacie Pugh |
Patty/Steve |
08/07/2024 |
CM Swine - Cody Michel |
CODY Michael |
|
|
|
|
|
|
6745 E 900 S |
|
North Manchester |
IN |
46962 |
Wabash |
260-570-6432 |
|
N |
|
|
Heliene |
144HC M10 Bifacial 540W |
AP Systems |
DS3 |
144 |
|
|
|
|
6 |
|
|
6 |
144 |
48 |
|
63.36 |
77.76 |
Heartland REMC |
|
|
|
|
Finalize |
N |
N |
N |
S |
Y |
N |
N |
N |
N |
N |
Y |
|
|
08/07/2024 03:13 PM |
3,095 |
Edit |
12/16/2024 |
Ericka Tyler |
Mark Luedke |
08/08/2024 |
Thomas Shumaker |
|
16881 E 2705 North Rd |
|
Danville |
IL |
61,834 |
Vermilion |
16881 E 2705 North Rd |
|
Danville |
IL |
61834 |
Vermilion |
217-474-5273 |
|
N |
08/07/2024 |
12/23/2024 |
Heliene |
144HC M10 Bifacial 535W |
AP Systems |
DS3 & DS3-L |
12 |
|
|
1 |
|
1 |
|
|
2 |
42 |
14 |
|
10.00 |
12.84 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
Property is in Village of Bismark. Need to get signed contracts started before 8/13 so that solar system will be grandfathered in.
DER-49096
9/5 Informed by the Village Clerk of Bismarck that a bldg permit is not necessary for residential solar as of 9/5/24. |
|
08/08/2024 12:25 PM |
3,096 |
Edit |
12/03/2024 |
Ericka Tyler |
Mark Luedke |
08/08/2024 |
David Holzrichter |
|
19467 E Blevins St |
|
Oakland |
IL |
61,943 |
Coles |
19467 E Blevins St |
|
Oakland |
IL |
61943 |
Coles |
217-246-7834 |
|
N |
08/08/2024 |
|
Heliene |
144HC M10 Bifacial 540W |
AP Systems |
DS3 |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
|
10.56 |
12.96 |
Enerstar |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
N |
N |
N |
Y |
|
|
08/08/2024 08:02 PM |
3,097 |
Edit |
08/28/2024 |
Kacie Pugh |
Mark Luedke |
08/15/2024 |
David Randolph |
David Randolph |
2379 1350th Street |
|
Kenney |
IL |
61,749 |
DeWitt |
|
|
|
|
|
|
6016227177 |
|
N |
|
|
Heliene |
Heliene 144HC M10 Bifacial 535 |
AP Systems |
DS3(7) and DS3-L(5) |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
|
10.00 |
12.84 |
Ameren |
|
|
|
|
Cold |
N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
Y |
Ameren Acct: 8986020044 |
|
08/15/2024 07:19 PM |
3,098 |
Edit |
11/13/2024 |
Laura Lewis |
Curt Dambman |
08/19/2024 |
Rick Cook |
Rick Cook |
|
|
|
|
|
|
27710 Spring Valley Road |
|
Shannon |
IL |
61078 |
Carroll |
815-291-7416 |
|
N |
07/26/2024 |
11/21/2024 |
Heliene |
144HC M10 Bifacial 535 |
AP Systems |
DS3 |
15 |
1 |
|
1 |
|
|
|
|
2 |
30 |
10 |
250 |
13.20 |
16.05 |
ComEd |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
N |
N |
Y |
Customer signed contracts 7/26; cannot guarantee net metering. LL |
Customer was quoted 530W panels. A COR will need to be completed for IL shines application. Enter interconnection application with 535 panel info. LL |
08/19/2024 04:24 PM |
3,099 |
Edit |
12/03/2024 |
Ericka Tyler |
Mark Luedke |
08/19/2024 |
Gary Luth |
|
1450 CR 2680 E |
|
Allerton |
IL |
61,810 |
Douglas |
1450 CR 2680 E |
|
Allerton |
IL |
61810 |
Douglas |
217-493-2258 |
|
N |
|
|
Heliene |
144HC M10 Bifacial 535W |
AP Systems |
DS3 |
48 |
|
|
|
|
2 |
|
|
2 |
48 |
16 |
|
21.12 |
25.68 |
Eastern Illini Coop |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
N |
N |
N |
Y |
|
|
08/19/2024 05:18 PM |
3,100 |
Edit |
12/03/2024 |
Ericka Tyler |
Gary Rosen |
08/19/2024 |
Shaundra Schaefer |
|
4617 Knab Rd |
|
Smithton |
IL |
62,285 |
St Clair |
4617 Knab Rd |
|
Smithton |
IL |
62285 |
St Clair |
618-334-0838 |
|
N |
08/20/2024 |
01/07/2025 |
Heliene |
144HC M10 Bifacial 540W |
|
|
48 |
|
|
|
|
2 |
|
|
2 |
48 |
16 |
|
20.12 |
25.92 |
Monroe Co Electric Co-Op |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
N |
N |
N |
N |
Y |
|
|
08/19/2024 08:07 PM |
3,101 |
Edit |
12/03/2024 |
Ericka Tyler |
Gary Rosen |
08/19/2024 |
Mueller Contracting LLC |
|
2924 Maus Rd |
|
Fults |
IL |
62,244 |
Monroe |
2924 Maus Rd |
|
Fults |
IL |
62244 |
Monroe |
618-340-9196 |
|
N |
|
|
Heliene |
144HC M10 Bifacial 540W |
AP Systems |
DS3 |
18 |
|
|
2 |
|
|
|
|
2 |
36 |
12 |
|
15.84 |
19.44 |
Monroe Co Electric Co-Op |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
N |
N |
N |
N |
Y |
|
|
08/19/2024 08:34 PM |
3,102 |
Edit |
10/10/2024 |
Kacie Pugh |
Jim Straeter |
08/23/2024 |
MILCO Dairy Farm LLC |
MILCO |
9305 South County Rd. 275 East |
|
Lewisville |
IN |
47,352 |
|
2625 E 1200 N |
|
Lewisville |
IN |
475352 |
Rush/City of Rushville |
765 465 1624 |
|
N |
08/22/2024 |
|
Heliene |
144HC M10 Bifacial 580W |
AP Systems |
QT2 480 |
318 |
|
|
|
|
53 |
|
|
53 |
1,272 |
424 |
|
572.40 |
737.76 |
Rush Shelby REMC |
|
|
|
|
Finalize |
N |
N |
Y |
N |
S |
X |
N |
N |
N |
N |
Y |
*Need to start in 2024 for 40% Domestic Content
Variance passed 10/2/24
Interconnection under (paid) review 10/10 |
|
08/23/2024 01:03 PM |
3,103 |
Edit |
12/16/2024 |
Kacie Pugh |
Mark Luedke |
08/27/2024 |
Jim Osborne |
Jim Osborne |
206 Vine St. |
|
Villa Grove |
IL |
61,956 |
Douglas |
|
|
|
|
|
|
2175088555 |
|
N |
|
|
Heliene |
Heliene 144HC M10 Bifacial 535 |
AP Systems |
DS3(7) and DS3-L(5) |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
|
10.00 |
12.84 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
Y |
Y |
N |
Y |
From Mark when information sent 8/24: Jim has already talked to the village on boring under the street and has the green lite, i have talked to my boring guy and he is on standby, just need ameren approval and village permit done, Jim has done all his measurements already based on the village setback requirements and has it flagged,it all fits easily, You just need to submit the village paperwork reflecting the setbacks they required, and i sent you the villa grove solar info, questions call, |
|
08/27/2024 07:47 PM |
3,104 |
Edit |
11/18/2024 |
Ericka Tyler |
Mark Luedke |
09/03/2024 |
VCCD - Kenn Main |
|
22296 Henning Rd Unit A, Woodshop |
|
Danville |
IL |
61,834 |
Vermilion |
Woodshop |
same as above |
|
|
|
|
217-442-1691 |
|
N |
09/03/2024 |
01/14/2025 |
Heliene |
144HC M10 Bifacial 535W |
AP Systems |
DS3 |
48 |
|
|
|
|
2 |
|
|
2 |
48 |
16 |
|
21.12 |
25.68 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
N |
Y |
N |
N |
Y |
Talked with Randy from Blount Township and he stated no building permits are needed for solar at this time. 9/17/24 |
|
09/03/2024 06:03 PM |
3,105 |
Edit |
12/03/2024 |
Laura Lewis |
Curt Dambman |
09/03/2024 |
John Wilson |
John Wilson |
|
|
|
|
|
|
23480 Livingood Road |
|
Chadwick |
IL |
61014 |
Carroll |
630-337-8946 |
|
N |
09/07/2024 |
01/16/2025 |
Heliene |
144HC M10 Bifacial 540 |
AP Systems |
DS3 |
9 |
|
|
1 |
|
|
|
|
1 |
18 |
6 |
250 |
7.92 |
9.72 |
Jo-Carroll Energy |
|
|
|
|
Finalize |
N |
N |
Y |
Y |
S |
Y |
N |
N |
N |
N |
Y |
9/3 contracts sent to Curt to get customer signature LL
Permit submitted Permit #2024221 |
|
09/03/2024 06:39 PM |
3,106 |
Edit |
11/15/2024 |
Laura Lewis |
Jim Straeter |
09/18/2024 |
Gohn Family Farms GP |
Gohn Farms |
|
|
|
|
|
|
1085 West State Road |
|
Rochester |
IN |
46975 |
Fulton |
574-835-0625 |
|
N |
|
|
Heliene |
144HC M10 580 |
AP Systems |
QT2 480 |
39 |
|
|
|
|
9 |
|
|
9 |
216 |
72 |
|
93.31 |
114.48 |
Fulton County REMC |
|
|
|
|
Finalize |
Y |
N |
N |
Y |
Y |
X |
N |
N |
N |
N |
N |
EIM grant awarded – 9-18-2024
BZA mtg 11/13/24
Nancy’s cell phone 574-835-2299 |
|
09/18/2024 07:22 PM |
3,107 |
Edit |
12/03/2024 |
Kacie Pugh |
Homan Inc |
09/18/2024 |
Ryan Strayer |
Ryan Strayer |
3635 S Defiance Trail |
|
Spencerville |
OH |
45,887 |
Allen |
Kraft Rd. |
|
Spencerville |
OH |
45887 |
Allen |
419-302-2766 |
|
N |
|
|
Heliene |
Heliene 144HC M10 Bifacial 540 |
AP Systems |
DS3 |
27 |
|
|
3 |
|
|
|
|
3 |
54 |
18 |
|
23.76 |
29.16 |
|
|
|
|
|
Finalize |
Y |
N |
N |
Y |
Y |
X |
N |
N |
N |
N |
Y |
Grant Approved 9/17 |
|
09/18/2024 07:53 PM |
3,108 |
Edit |
11/13/2024 |
Kacie Pugh |
Mark Luedke |
09/18/2024 |
Mike Patterson |
Mike Patterson |
4645 Link Rd. |
|
New Berlin |
IL |
62,670 |
Sangamon |
|
|
|
|
|
|
217-415-9135 |
|
N |
09/17/2024 |
01/20/2025 |
Heliene |
Heliene 144HC M10 Bifacial 535 |
AP Systems |
DS3 |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
|
10.00 |
12.84 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
N |
Y |
N |
N |
Y |
|
Ameren Account 4614025915 |
09/18/2024 08:07 PM |
3,109 |
Edit |
12/03/2024 |
Kacie Pugh |
Homan Inc |
09/19/2024 |
Luke Leffel |
ADDITION to Leffel System |
15340 St. Route 66 |
|
Saint Marys |
OH |
45,885 |
Auglaize |
|
|
|
|
|
|
419-953-4605 |
|
N |
|
|
Heliene |
Heliene 144HC M10 Bifacial 540 |
AP Systems |
DS3 |
36 |
|
|
|
|
3 |
|
|
3 |
72 |
24 |
|
31.68 |
38.88 |
Midwest Electric |
|
|
|
|
Finalize |
N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
Y |
|
|
09/19/2024 01:02 PM |
3,110 |
Edit |
11/18/2024 |
Kacie Pugh |
Mark Luedke |
09/19/2024 |
FMC Fire Protection District |
Fithian Fire Department |
|
|
|
|
|
|
108 N Adams St. |
|
Fithian |
IL |
61844 |
Vermilion |
217-260-2671 |
|
Y |
09/24/2024 |
01/25/2025 |
Heliene |
Heliene 144HC M10 Bifacial 535 |
AP Systems |
DS3 |
6 |
1 |
|
|
|
|
|
|
1 |
12 |
4 |
|
5.28 |
6.42 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
N |
Y |
Y |
N |
Y |
N |
N |
Y |
|
|
09/19/2024 02:39 PM |
3,111 |
Edit |
10/10/2024 |
Laura Lewis |
Curt Dambman |
09/30/2024 |
Patricia Zier |
Pat Zier |
3380 Atwell Avenue |
|
The Villages |
FL |
32,162 |
|
23990 Telegraph Road |
|
Chadwick |
IL |
61014 |
Carroll |
|
|
N |
|
01/27/2025 |
Heliene |
Heliene 144HC M10 Bifacial 535 |
AP Systems |
DS3 |
6 |
1 |
|
|
|
|
|
|
1 |
12 |
4 |
|
5.28 |
6.42 |
|
|
|
|
|
Cold |
N |
N |
N |
N |
N |
N |
N |
N |
N |
N |
Y |
|
|
09/30/2024 08:17 PM |
3,113 |
Edit |
11/22/2024 |
Kacie Pugh |
Mark Luedke |
10/02/2024 |
Mike Snider |
Mike Snider |
1251 E 1900 N Rd |
|
White Heath |
IL |
61,884 |
Piatt |
|
|
|
|
|
|
|
|
N |
10/01/2024 |
01/22/2025 |
Heliene |
Heliene 144HC M10 Bifacial 535 |
AP Systems |
DS3(7) and DS3-L(5) |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
|
10.00 |
12.96 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
N |
Y |
N |
N |
Y |
|
|
10/02/2024 01:52 PM |
3,114 |
Edit |
12/03/2024 |
Kacie Pugh |
Mark Luedke |
10/02/2024 |
Kent Smith - House |
Kent Smith - House site |
9225 N 1850 E Rd. |
|
Georgetown |
IL |
61,846 |
Vermilion |
|
|
|
|
|
|
217-304-0080 |
|
N |
10/11/2024 |
01/23/2025 |
Heliene |
Heliene 144HC M10 Bifacial 540 |
|
|
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
|
10.00 |
12.96 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
N |
Y |
Y |
N |
N |
N |
N |
Y |
|
|
10/02/2024 01:54 PM |
3,115 |
Edit |
12/11/2024 |
Kacie Pugh |
Mark Luedke |
10/02/2024 |
Kent Smith - Bins |
Bin Site |
|
|
|
|
|
|
9225 N 1850 E Rd. |
|
Georgetown |
IL |
61846 |
Vermilion |
217-304-0080 |
|
Y |
|
01/24/2025 |
Heliene |
Heliene 144HC M10 Bifacial 540 |
AP Systems |
DS3 |
36 |
|
|
|
|
3 |
|
|
3 |
72 |
24 |
|
31.68 |
38.80 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
N |
Y |
N |
N |
Y |
|
|
10/02/2024 01:57 PM |
3,116 |
Edit |
11/18/2024 |
Ericka Tyler |
Mark Luedke |
10/02/2024 |
Lee Baird |
|
Po Box 58 |
|
Indianola |
IL |
61,850 |
Vermilion |
13 W North St |
|
Indianola |
IL |
61850 |
Vermilion |
217-493-9454 |
|
N |
10/09/2024 |
|
Heliene |
144HC M10 Bifacial 540W |
AP Systems |
DS3 & DS3-L |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
|
10.00 |
12.84 |
Ameren |
|
|
|
|
Finalize |
N |
N |
Y |
Y |
Y |
Y |
N |
Y |
N |
N |
Y |
DER-52692 |
|
10/02/2024 06:13 PM |
3,117 |
Edit |
12/11/2024 |
Ericka Tyler |
Mark Luedke |
10/02/2024 |
Dianne Hendricks |
|
26740 Shake Rag Rd |
|
Danville |
IL |
61,834 |
Vermilion |
Same as mailing |
|
|
|
|
|
217-213-9143 |
|
N |
|
|
Heliene |
144HC M10 Bifacial 540W |
AP Systems |
DS3 & DS3-L |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
|
10.00 |
12.96 |
Ameren |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
N |
Y |
N |
N |
Y |
DER-52693 |
|
10/02/2024 07:18 PM |
3,118 |
Edit |
12/03/2024 |
Ericka Tyler |
Doug Smith |
10/03/2024 |
RSA Swine LLC |
|
5875 W 400 S |
|
Berne |
IN |
46,711 |
Adams |
5642 W 350 S |
|
Berne |
IN |
46711 |
Adams |
260-223-3348 |
|
N |
|
|
Heliene |
144HC M10 Bifacial 540W |
AP Systems |
DS3 |
84 |
|
|
|
|
7 |
|
|
7 |
168 |
56 |
|
73.92 |
90.72 |
Jay County REMC |
|
|
|
|
Finalize |
N |
N |
Y |
N |
S |
X |
N |
N |
N |
N |
N |
|
|
10/03/2024 06:25 PM |
3,119 |
Edit |
11/13/2024 |
Kacie Pugh |
Mark Luedke |
10/04/2024 |
Norbert Soltwedel - Rental House |
RENTAL HOUSE |
18991 N 900th St. |
|
Shumway |
IL |
62,461 |
Effingham/City |
8989 E Hwy 33 |
|
Shumway |
IL |
62461 |
Effingham/City |
217-259-8233 |
|
N |
|
|
Heliene |
Heliene 144HC M10 Bifacial 535 |
AP Systems |
DS3(7) and DS3-L(5) |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
|
10.00 |
12.96 |
|
|
|
|
|
Finalize |
Y |
N |
Y |
N |
Y |
Y |
Y |
Y |
N |
N |
Y |
|
|
10/04/2024 05:47 PM |
3,120 |
Edit |
11/22/2024 |
Laura Lewis |
Mark Luedke |
10/10/2024 |
Enduring Freedom Ministries |
Enduring Freedom Ministries |
19253 N 800th St |
|
Shumway |
IL |
62,461 |
Clinton |
304 S West St |
|
Shumway |
IL |
62461 |
Effingham/City |
217-821-5644 |
|
N |
|
02/03/2025 |
Heliene |
Bifacial 540W |
AP Systems |
DS3 |
36 |
|
|
|
|
3 |
|
|
3 |
72 |
24 |
|
31.68 |
38.88 |
Ameren Illinois |
|
|
|
|
Finalize |
N |
N |
N |
N |
N |
N |
Y |
N |
N |
N |
Y |
Emil is purchasing the system to serve the Enduring Freedom Ministries site. The grant awarded is in Emil’s name. This is a House of Worship and is tax exempt and exempt from PW. System must be installed by the end of the year for net metering. Effingham County does not require a permit. |
Need Ameren approval and to make net metering deadline, 12/31/2024 |
10/10/2024 01:13 PM |
3,121 |
Edit |
12/03/2024 |
Ericka Tyler |
Curt Dambman |
10/11/2024 |
Carroll County Vet Prop LLC |
|
651 Otter Creek Dr |
|
Milledgeville |
IL |
61,051 |
Carroll |
Same as mailing |
|
|
|
|
|
815-225-7127 |
|
N |
10/17/2024 |
|
Heliene |
144HC M10 Bifacial 540W |
AP Systems |
DS3 |
60 |
|
|
|
|
5 |
|
|
5 |
120 |
40 |
|
52.80 |
64.80 |
ComEd |
|
|
|
|
Finalize |
N |
N |
Y |
Y |
S |
Y |
N |
N |
N |
N |
Y |
Project within the Village of Milledgeville. Called to check if permit needed or if any setback requirements. |
|
10/11/2024 05:09 PM |
3,122 |
Edit |
10/12/2024 |
Laura Lewis |
Doug Smith |
10/12/2024 |
Jeron Harris |
Jeron Harris |
|
|
|
|
|
|
8313 N 1000th St |
|
Robinson |
IL |
62454 |
Crawford |
618-553-7827 |
|
N |
|
02/06/2025 |
Heliene |
Bifacial 540W |
AP Systems |
DS3/DS3L |
12 |
|
|
|
|
0 |
|
|
0 |
0 |
0 |
|
10.00 |
12.96 |
Norris Electric Cooperative |
|
|
|
|
Review |
N |
N |
N |
N |
N |
Y |
N |
N |
N |
N |
Y |
Customer signed DF, ready to sign solar contracts. 10/12 |
|
10/12/2024 02:45 PM |
3,123 |
Edit |
12/11/2024 |
Ericka Tyler |
Curt Dambman |
10/16/2024 |
Britton Bauer |
|
7878 Maple Grove |
|
Milledgeville |
IL |
61,051 |
Carroll |
Same as mailing |
|
|
|
|
|
8155415088 |
|
N |
|
|
Heliene |
144HC M10 Bifacial 540W |
AP Systems |
DS3 |
42 |
|
|
2 |
|
2 |
|
|
4 |
84 |
28 |
|
36.96 |
45.36 |
ComEd |
|
|
|
|
Finalize |
N |
N |
Y |
Y |
Y |
Y |
N |
Y |
N |
N |
Y |
|
This system will be split into 30 panels for the home and 54 panels for the farm. Two separate meters. |
10/16/2024 06:17 PM |
3,124 |
Edit |
10/17/2024 |
Ericka Tyler |
Jim Straeter |
10/17/2024 |
DeJong Family Farms |
|
2953 E St Rd 14 |
|
Francesville |
IN |
47,946 |
Jasper |
|
|
|
|
|
|
|
|
N |
|
|
Heliene |
144HC M10 580 & 540 |
AP Systems |
QT2 480 |
552 |
|
|
|
|
92 |
|
|
92 |
2,208 |
736 |
|
993.60 |
1,236.48 |
Miami Cass REMC |
|
|
|
|
Finalize |
N |
N |
N |
N |
N |
X |
N |
N |
N |
N |
Y |
|
|
10/17/2024 03:46 PM |
3,125 |
Edit |
10/17/2024 |
Ericka Tyler |
Jim Straeter |
10/17/2024 |
Windy Ridge Dairy |
|
1652 N 1100 W |
|
Fair Oaks |
IN |
47,943 |
Jasper |
|
|
|
|
|
|
217-712-1237 |
|
N |
|
|
Heliene |
144HC M10 580 |
AP Systems |
QT2 480 |
900 |
|
|
|
|
150 |
|
|
150 |
3,600 |
1,200 |
|
1,620.00 |
2,088.00 |
|
|
|
|
|
Finalize |
N |
N |
N |
N |
N |
X |
N |
N |
N |
N |
Y |
|
|
10/17/2024 05:49 PM |
3,126 |
Edit |
12/11/2024 |
Ericka Tyler |
Mark Luedke |
10/21/2024 |
Terry Crozier |
|
517 Maple Av |
|
Willow Springs |
IL |
60,480 |
|
595 Co Rd 1225 N |
|
Sullivan |
IL |
61951 |
Moultrie |
312-758-1101 |
|
N |
10/15/2024 |
|
Heliene |
144HC M10 Bifacial 540W |
AP Systems |
DS3 & DS3-L |
12 |
|
|
|
|
1 |
|
|
1 |
24 |
8 |
|
10.00 |
12.96 |
Coles-Moultrie Electric Coop |
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
N |
N |
N |
N |
Y |
|
|
10/21/2024 02:35 PM |
3,127 |
Edit |
11/22/2024 |
Kacie Pugh |
Mark Luedke |
10/25/2024 |
Chris Neaville |
Chris Neaville |
|
|
|
|
|
|
108 W German Avenue |
|
Mt. Pulaski |
IL |
62548 |
Logan |
217-454-6466 |
|
N |
|
|
Heliene |
Heliene 144HC M10 Bifacial 540 |
AP Systems |
DS3 |
6 |
1 |
|
|
|
|
|
|
1 |
12 |
4 |
|
|
|
|
|
|
|
|
Finalize |
Y |
N |
Y |
Y |
Y |
Y |
Y |
N |
N |
N |
Y |
|
|
10/25/2024 06:44 PM |
3,129 |
Edit |
11/15/2024 |
Kacie Pugh |
Joel Davis |
11/15/2024 |
Greg Hiller |
Greg Hiller |
|
|
|
|
|
|
4180 Porterfield Rd. |
|
Richmond |
IN |
47374 |
Wayne |
781-258-8303 |
|
N |
11/06/2024 |
|
Heliene |
Heliene 144HC M10 Bifacial 540 |
AP Systems |
DS3 |
18 |
|
|
2 |
|
|
|
|
2 |
36 |
12 |
|
15.84 |
19.44 |
Whitewater Valley REMC |
|
|
|
|
Finalize |
N |
N |
Y |
N |
N |
X |
N |
N |
N |
N |
Y |
https://www.wwvremc.com/member-owned-distributed-generation-application/ |
|
11/15/2024 08:12 PM |